24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hunter Street intersection<br />

Bent Street to Bridge Street<br />

Precinct 5: financial<br />

Table 3-7 and Figure 3-20 to Figure 3-22 show the proposed traffic capa<strong>city</strong><br />

improvements within Precinct 5: financial.<br />

Table 3-7<br />

Precinct 5: financial traffic capa<strong>city</strong> improvement<br />

Ref (refer<br />

Fig 3-20<br />

to 3-22)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

F1<br />

A<br />

Macquarie Street between Bent Street and Bridge Street<br />

Introduce northbound capa<strong>city</strong> in the morning and evening periods on the approach<br />

to Bridge Street.<br />

Bent Street intersection: No change<br />

B<br />

<br />

Remove kerb extension on the<br />

western kerb south <strong>of</strong> Phillip<br />

Lane.<br />

Type No. 2: Kerb extension alterations:<br />

<br />

Temporary footpath<br />

restrictions/closure<br />

<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Signage relocation<br />

<br />

Localised resurfacing<br />

<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

Remove two existing mature London<br />

Plane trees<br />

<br />

Relocate the phone booth.<br />

Alter the parking and loading<br />

provisions on the western kerb north<br />

<strong>of</strong> the removed kerb extension to<br />

Bridge Street:<br />

<br />

<br />

Introduce ‘no stopping’<br />

restrictions during the weekday<br />

morning and afternoon peak<br />

periods<br />

Create loading zone provisions<br />

during the weekday inter peak<br />

period.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

<br />

Remove the parking ticket vending<br />

machine<br />

Relocate the two bicycle rings on the<br />

street signs (if they are removed).<br />

C<br />

F2<br />

Bridge Street intersection: No change<br />

Macquarie Street at the Hunter Street intersection<br />

Overview: Remove right turn bay on Macquarie Street on the approach to Hunter<br />

Street in order to increase right turn capa<strong>city</strong> for motorists accessing Shakespeare<br />

Place and the Eastern Distributor.<br />

A<br />

<br />

<br />

Remove right turn bay on<br />

Macquarie Street on the<br />

southbound approach to Hunter<br />

Street to prohibit right-turn<br />

movements into Hunter Street<br />

Replace with a right filter lane<br />

northbound on the approach to<br />

Shakespeare Place.<br />

Type No. 1: Intersection reconfiguration<br />

and geometry modifications:<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Localised resurfacing<br />

Lane marking alterations.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 123<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!