Ref (refer Fig 3-17 to 3-19) G Proposal description Regrade and resurface the western side of the road up to Stanley Street. Regrade and resurface the western side of the road north of Francis Street to Oxford Street. Oxford Street intersection: Refer to C1(A) Type of capacity improvement and associated work (refer Table 3-2) street sign (if the street sign is removed) Supporting work: Regrade and resurface. Supporting work: Regrade and resurface. Sydney City Centre Capacity Improvement 115 Review of Environmental Factors
Sydney City Centre Capacity Improvement 116 Review of Environmental Factors
- Page 81 and 82: George Street to Pitt Street York S
- Page 83 and 84: Sydney City Centre Capacity Improve
- Page 85 and 86: Sydney City Centre Capacity Improve
- Page 87 and 88: Sydney City Centre Capacity Improve
- Page 89 and 90: Kent Street intersection Pitt Stree
- Page 91 and 92: Pitt Street to Castlereagh Street G
- Page 93 and 94: Margaret Street to Erskine Street J
- Page 95 and 96: Market Street intersection King Str
- Page 97 and 98: Sydney City Centre Capacity Improve
- Page 99 and 100: Sydney City Centre Capacity Improve
- Page 101 and 102: Sydney City Centre Capacity Improve
- Page 103 and 104: Sydney City Centre Capacity Improve
- Page 105 and 106: Sydney City Centre Capacity Improve
- Page 107 and 108: Sydney City Centre Capacity Improve
- Page 109 and 110: Liverpool Street to Eager Lane Jame
- Page 111 and 112: Hay Street to Rawson Place Goulburn
- Page 113 and 114: Abercrombie Street intersection Ref
- Page 115 and 116: Ref (refer Fig 3-10 to 3-16) Propos
- Page 117 and 118: Sydney City Centre Capacity Improve
- Page 119 and 120: Sydney City Centre Capacity Improve
- Page 121 and 122: Sydney City Centre Capacity Improve
- Page 123 and 124: Sydney City Centre Capacity Improve
- Page 125 and 126: Sydney City Centre Capacity Improve
- Page 127 and 128: Wemyss Lane to Goulburn Street Ref
- Page 129 and 130: Macquarie Street intersection Campb
- Page 131: Park Street to Oxford Street Prince
- Page 135 and 136: Sydney City Centre Capacity Improve
- Page 137 and 138: Sydney City Centre Capacity Improve
- Page 139 and 140: Sydney City Centre Capacity Improve
- Page 141 and 142: Sydney City Centre Capacity Improve
- Page 143 and 144: Sydney City Centre Capacity Improve
- Page 145 and 146: 3.2 Design The proposal’s concept
- Page 147 and 148: Table 3-9 Engineering and developme
- Page 149 and 150: 3.3 Construction activities The lik
- Page 151 and 152: Table 3-10 Plant and equipment - in
- Page 153 and 154: These materials are widely availabl
- Page 155 and 156: Once the work is complete on site,
- Page 157 and 158: 3.6 Public utility and drainage adj
- Page 159 and 160: Traffic capacity improvement Precin
- Page 161 and 162: Traffic capacity improvement Locati
- Page 163 and 164: 4.1.3 Darling Harbour Development P
- Page 165 and 166: Sydney City Centre Capacity Improve
- Page 167 and 168: The adopted urban design principles
- Page 169 and 170: Principles and objectives Consisten
- Page 171 and 172: Principles and objectives Prot
- Page 173 and 174: Sydney City Centre Capacity Improve
- Page 175 and 176: Sydney City Centre Capacity Improve
- Page 177 and 178: Roads and Maritime is, however, req
- Page 179 and 180: The one adverse outcome to deliveri
- Page 181 and 182: 5.1.2 Stakeholder engagement Roads
Ref (refer<br />
Fig 3-17<br />
to 3-19)<br />
G<br />
Proposal description<br />
<br />
<br />
Regrade and resurface the<br />
western side <strong>of</strong> the road up to<br />
Stanley Street.<br />
Regrade and resurface the<br />
western side <strong>of</strong> the road north <strong>of</strong><br />
Francis Street to Oxford Street.<br />
Oxford Street intersection: Refer to C1(A)<br />
Type <strong>of</strong> capa<strong>city</strong> improvement and<br />
associated work (refer Table 3-2)<br />
street sign (if the street sign is<br />
removed)<br />
Supporting work:<br />
<br />
Regrade and resurface.<br />
Supporting work:<br />
<br />
Regrade and resurface.<br />
Sydney City Centre Capa<strong>city</strong> Improvement 115<br />
Review <strong>of</strong> Environmental Factors