Macquarie Street to Prince Albert Road Ref (refer Fig 3-17 to 3-19) Proposal description Type of capacity improvement and associated work (refer Table 3-2) Relocate lighting poles Tree lopping/pruning (Hill’s Weeping Fig Trees). Reconfigure the approach from Prince Albert Road to the Macquarie Street intersection Alter the median about -2– 2.5 metres north of the existing median on the approach from Prince Albert Road Modify the north-east corner kerb alignment. Alter the parking provisions on southern kerb: Extend the full time ‘no stopping’ restriction on the departure side of the Macquarie Street intersection Relocate six mobility parking spaces further west and remove existing general parking provisions. Type No. 1: Intersection reconfiguration and geometry modifications: Temporary traffic management Temporary footpath restrictions/closure Kerb/kerb ramp relocation Median removal and refurbishment Footpath alterations Signage relocation Traffic signal relocation Lane marking alterations. Supporting work: Maintain/relocate existing pits on the northern kerb Extend existing building downpipes Reconfigure existing drainage gutters Modify existing drainage pits Relocate lighting poles. Type No. 5: Kerbside allocation modifications: Signage relocation Lane marking alterations. Regrade and resurface the whole intersection. Supporting work: Regrade and resurface. B Modify westbound lane configuration on Prince Albert Road Create a fourth lane westbound on Prince Albert Road by moving the median and kerb comprising two through-lanes and two dedicated right-turn lanes. Type No. 6: Lane arrangements: Temporary traffic management Lane marking alterations. Supporting work: Relocate the bicycle ring on the street sign (if the street sign is removed). Regrade and resurface the whole road. Supporting work: Regrade and resurface. Sydney City Centre Capacity Improvement 113 Review of Environmental Factors

Park Street to Oxford Street Prince Albert Road to Park Street Prince Albert Road intersection Ref (refer Fig 3-17 to 3-19) Proposal description Type of capacity improvement and associated work (refer Table 3-2) C Reconfigure the central median eastwards to create an additional lane on the approach to Prince Albert Road from College Street Create a fourth lane northbound on College Street by moving the median and kerb, comprising three through-lanes and one dedicated right-turn lane Realign the southbound carriageway by designating a dedicated left-turn lane on the approach to Prince Albert Road. Type No. 1: Intersection reconfiguration and geometry modifications: Temporary traffic management Median removal and refurbishment Signage relocation Traffic signal relocation Lane marking alterations. Supporting work: Relocate drainage pits. Regrade and resurface the whole road. Supporting work: Regrade and resurface. D Alter the parking provisions on the eastern kerb: Type No. 5: Kerbside allocation modifications: Relocate funeral vehicle parking about 50 metres south on College Street Relocate mobility parking along the same section of College Street about 50 metres farther south Provide wedding vehicle parking along the same section for a distance of 20–25 metres Temporary traffic management Signage relocation Lane marking alterations. Supporting work: Relocate nine bicycle rings on the street sign (if the street sign is removed). Retain coach and bus kerbside provisions north of Park Street Introduce full time ‘no stopping’ restriction on the eastern kerb elsewhere. Alter the parking provisions on the western kerb: Type No. 5: Kerbside allocation modifications: Remove motorcycle parking provisions Introduce full time ‘no stopping’ restrictions. Temporary traffic management Signage relocation Lane marking alterations. Regrade and resurface the road from the intersection back to St Mary’s Cathedral and also the mid-block. Supporting work: Regrade and resurface. E F Park Street intersection: No change Provide for a minimum of two uninterrupted southbound lanes at all times between Park Street and Stanley Street. Type No 6: Lane arrangements: Temporary traffic management Lane marking alterations. Alter the parking and loading provisions on the eastern kerb: Introduce ‘no stopping’ during the weekday morning and afternoon peak periods south of Stanley Street. Type No. 5: Kerbside allocation modifications: Temporary traffic management Signage relocation Lane marking alterations. Supporting work: Relocate the seven bicycle rings on the Sydney City Centre Capacity Improvement 114 Review of Environmental Factors

Park Street to Oxford Street<br />

Prince Albert Road to Park Street<br />

Prince Albert Road intersection<br />

Ref (refer<br />

Fig 3-17<br />

to 3-19)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

C<br />

<br />

<br />

<br />

Reconfigure the central median<br />

eastwards to create an additional<br />

lane on the approach to Prince<br />

Albert Road from College Street<br />

Create a fourth lane northbound<br />

on College Street by moving the<br />

median and kerb, comprising<br />

three through-lanes and one<br />

dedicated right-turn lane<br />

Realign the southbound<br />

carriageway by designating a<br />

dedicated left-turn lane on the<br />

approach to Prince Albert Road.<br />

Type No. 1: Intersection reconfiguration<br />

and geometry modifications:<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Median removal and refurbishment<br />

Signage relocation<br />

Traffic signal relocation<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

Relocate drainage pits.<br />

<br />

Regrade and resurface the whole<br />

road.<br />

Supporting work:<br />

<br />

Regrade and resurface.<br />

D<br />

Alter the parking provisions on the<br />

eastern kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

<br />

Relocate funeral vehicle parking<br />

about 50 metres south on College<br />

Street<br />

Relocate mobility parking along<br />

the same section <strong>of</strong> College<br />

Street about 50 metres farther<br />

south<br />

Provide wedding vehicle parking<br />

along the same section for a<br />

distance <strong>of</strong> 20–25 metres<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

Relocate nine bicycle rings on the<br />

street sign (if the street sign is<br />

removed).<br />

<br />

Retain coach and bus kerbside<br />

provisions north <strong>of</strong> Park Street<br />

<br />

Introduce full time ‘no stopping’<br />

restriction on the eastern kerb<br />

elsewhere.<br />

Alter the parking provisions on the<br />

western kerb:<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Remove motorcycle parking<br />

provisions<br />

Introduce full time ‘no stopping’<br />

restrictions.<br />

<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations.<br />

<br />

Regrade and resurface the road<br />

from the intersection back to<br />

St Mary’s Cathedral and also the<br />

mid-block.<br />

Supporting work:<br />

<br />

Regrade and resurface.<br />

E<br />

F<br />

Park Street intersection: No change<br />

Provide for a minimum <strong>of</strong> two<br />

uninterrupted southbound lanes at all<br />

times between Park Street and<br />

Stanley Street.<br />

Type No 6: Lane arrangements:<br />

Temporary traffic management<br />

Lane marking alterations.<br />

Alter the parking and loading<br />

provisions on the eastern kerb:<br />

<br />

Introduce ‘no stopping’ during the<br />

weekday morning and afternoon<br />

peak periods south <strong>of</strong> Stanley<br />

Street.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Temporary traffic management<br />

Signage relocation<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

Relocate the seven bicycle rings on the<br />

Sydney City Centre Capa<strong>city</strong> Improvement 114<br />

Review <strong>of</strong> Environmental Factors