Macquarie Street to Prince Albert Road<br />

Ref (refer<br />

Fig 3-17<br />

to 3-19)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

<br />

<br />

Relocate lighting poles<br />

Tree lopping/pruning (Hill’s Weeping<br />

Fig Trees).<br />

<br />

Reconfigure the approach from<br />

Prince Albert Road to the<br />

Macquarie Street intersection<br />

Alter the median about -2–<br />

2.5 metres north <strong>of</strong> the existing<br />

median on the approach from<br />

Prince Albert Road<br />

<br />

Modify the north-east corner kerb<br />

alignment.<br />

Alter the parking provisions on<br />

southern kerb:<br />

<br />

<br />

Extend the full time ‘no stopping’<br />

restriction on the departure side<br />

<strong>of</strong> the Macquarie Street<br />

intersection<br />

Relocate six mobility parking<br />

spaces further west and remove<br />

existing general parking<br />

provisions.<br />

Type No. 1: Intersection reconfiguration<br />

and geometry modifications:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/closure<br />

Kerb/kerb ramp relocation<br />

Median removal and refurbishment<br />

Footpath alterations<br />

Signage relocation<br />

Traffic signal relocation<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

<br />

<br />

<br />

<br />

Maintain/relocate existing pits on the<br />

northern kerb<br />

Extend existing building downpipes<br />

Reconfigure existing drainage gutters<br />

Modify existing drainage pits<br />

Relocate lighting poles.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Signage relocation<br />

Lane marking alterations.<br />

<br />

Regrade and resurface the whole<br />

intersection.<br />

Supporting work:<br />

<br />

Regrade and resurface.<br />

B<br />

<br />

<br />

Modify westbound lane<br />

configuration on Prince Albert<br />

Road<br />

Create a fourth lane westbound<br />

on Prince Albert Road by moving<br />

the median and kerb comprising<br />

two through-lanes and two<br />

dedicated right-turn lanes.<br />

Type No. 6: Lane arrangements:<br />

<br />

Temporary traffic management<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

Relocate the bicycle ring on the street<br />

sign (if the street sign is removed).<br />

<br />

Regrade and resurface the whole<br />

road.<br />

Supporting work:<br />

<br />

Regrade and resurface.<br />

Sydney City Centre Capa<strong>city</strong> Improvement 113<br />