24.11.2014 Views

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

sydney-city-centre-review-of-environmental-factors

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Abercrombie Street intersection<br />

Ref (refer<br />

Fig 3-10<br />

to 3-16)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

<br />

Relocate the bicycle ring on the street<br />

sign (if the street sign is removed).<br />

<br />

<br />

<br />

Build-out the kerb extensions<br />

along the eastern kerb <strong>of</strong> the<br />

Wattle Street slip road.<br />

Increase the size <strong>of</strong> the existing<br />

raised island to provide greater<br />

area for pedestrian refuge and<br />

improved geometry through the<br />

intersection.<br />

Provide pedestrian crossing<br />

facilities at the intersection.<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath<br />

restrictions/closure<br />

Kerb/kerb ramp relocation<br />

Footpath alterations<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

<br />

Modify existing drainage pits<br />

Drainage pit and pipe relocation.<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath<br />

restrictions/closure<br />

Traffic signal relocation<br />

Kerb/kerb ramp relocation<br />

Footpath alterations<br />

Lane marking alterations.<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath restrictions/<br />

closure<br />

Kerb/kerb ramp relocation<br />

Footpath alterations<br />

Lane marking alterations.<br />

Wattle Street slip lane<br />

<br />

Provide indented parking bays.<br />

Alter parking provisions in Wattle<br />

Street between Broadway to south <strong>of</strong><br />

Mary Anne Street:<br />

<br />

<br />

Introduce full time ‘no stopping’<br />

on Wattle Street on eastern kerb<br />

during the morning, inter and<br />

afternoon peak periods<br />

Restrict parking in the inter peak<br />

period on the western kerb.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

Line marking alterations.<br />

Type No. 5: Kerbside allocation<br />

modifications:<br />

<br />

<br />

Signage relocation<br />

Line marking alterations.<br />

D<br />

<br />

Reconfigure northbound lanes in<br />

Abercrombie Street and through<br />

the intersection to create one<br />

dedicated left-turn lane, two<br />

through lanes and one through<br />

and right-turn lane.<br />

Type No. 1: Intersection<br />

reconfiguration and geometry<br />

modifications:<br />

<br />

<br />

Temporary traffic management<br />

Lane marking alterations<br />

<br />

Retain existing north-east kerb<br />

on the intersection and built-out<br />

to provide the additional footway<br />

width.<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath<br />

restrictions/closure<br />

Kerb/kerb ramp relocation<br />

Sydney City Centre Capa<strong>city</strong> Improvement 96<br />

Review <strong>of</strong> Environmental Factors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!