Wattle Street intersection (left slip<br />

lane)<br />

Mountain Street to Wattle Street<br />

Harris Street intersection<br />

Ref (refer<br />

Fig 3-10<br />

to 3-16)<br />

Proposal description<br />

Type <strong>of</strong> capa<strong>city</strong> improvement and<br />

associated work (refer Table 3-2)<br />

S4<br />

Ultimo Road at the Harris Street intersection<br />

Overview: Modify lane arrangements to provide a dual-left turn into Harris<br />

Street from Ultimo Road.<br />

A<br />

<br />

<br />

<br />

<br />

<br />

Create a dual left turn lane from<br />

Ultimo Road on to Harris Street<br />

Provide additional capa<strong>city</strong> for<br />

traffic travelling towards<br />

Broadway<br />

Remove the pedestrian<br />

crossings on the southern leg at<br />

the intersection across Harris<br />

Street<br />

Retain the pedestrian crossing<br />

on northern site <strong>of</strong> the<br />

intersection across Harris Street<br />

Remove the existing triangular<br />

island and extend the length <strong>of</strong><br />

the pedestrian crossing across<br />

Ultimo Road.<br />

Type No. 1: Intersection<br />

reconfiguration and geometry<br />

modifications:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath<br />

restrictions/closure<br />

Kerb/kerb ramp relocation<br />

Pedestrian island alterations<br />

Footpath alterations<br />

Traffic signal relocation<br />

Lane marking alterations.<br />

Supporting work:<br />

<br />

<br />

Relocate the two mail boxes<br />

Remove the pedestrian crossing<br />

south <strong>of</strong> intersection.<br />

<br />

Resurface the entire intersection<br />

including sections <strong>of</strong> Ultimo<br />

Road and Harris Street.<br />

Supporting work:<br />

<br />

Regrade and resurface.<br />

S5<br />

A<br />

Broadway between Mountain Street and Abercrombie Street<br />

Overview: Modify lane arrangements in Broadway (<strong>city</strong> bound) and on Wattle<br />

Street to encourage use <strong>of</strong> Wattle Street for access to the <strong>city</strong> <strong>centre</strong> and <strong>city</strong><br />

north areas.<br />

Mountain Street intersection: No change<br />

B<br />

<br />

Better delineate line markings<br />

between the intersections.<br />

Type No. 6: Lane arrangements:<br />

Temporary traffic management<br />

<br />

Line marking alterations.<br />

<br />

Change lane allocation from a<br />

bus lane to a dedicated left-turn<br />

lane into Wattle Street<br />

Supporting work:<br />

<br />

Regrade and resurface.<br />

<br />

Regrade and resurface the<br />

eastbound lane.<br />

C<br />

<br />

Build-out the kerb extensions<br />

along the western kerb <strong>of</strong> the<br />

Wattle Street slip road.<br />

Type No. 2: Kerb extension alterations:<br />

<br />

<br />

Temporary traffic management<br />

Temporary footpath<br />

restrictions/closure<br />

<br />

Kerb/kerb ramp relocation<br />

<br />

Footpath alterations<br />

<br />

Lane marking alterations<br />

Supporting work:<br />

<br />

Modify existing drainage pits<br />

<br />

Drainage pit and pipe relocation<br />

<br />

Potentially relocate the historic mail<br />

box<br />

Sydney City Centre Capa<strong>city</strong> Improvement 95<br />

Review <strong>of</strong> Environmental Factors