24.11.2014 Views

Agenda Package - City of Vernon

Agenda Package - City of Vernon

Agenda Package - City of Vernon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

-5-<br />

already not been installed by adjacent property owners through<br />

the development approval process.<br />

Pete Smith<br />

6524 Okanagan Avenue<br />

New intersection will cut <strong>of</strong>f his property at Okanagan Avenue<br />

No walking path on right side <strong>of</strong> road where The Oaks sidewalk is<br />

Pavement is very close to edge <strong>of</strong> d¡tch - should be looked into<br />

Storm drain and sewer will run past his house - is that a first<br />

priority?<br />

The oaks has taken 4 years so far, and not maintained or<br />

finished, lots <strong>of</strong> dust, road ripped up two years before paving,<br />

please address this development before starting another<br />

okanagan Landing crossing example as well - only one house up,<br />

and no further action<br />

Staff Response:<br />

o There will be a sidewalk constructed along the south side <strong>of</strong><br />

okanagan Avenue from the new Apollo Road intersection<br />

westward to Okanagan Landing road. The Manager <strong>of</strong> Operations<br />

will be notified <strong>of</strong> the concern raised regarding the condition <strong>of</strong><br />

the pedestrian facilities at both ends <strong>of</strong> sidewalk along Okanagan<br />

Avenue in front <strong>of</strong> The Oaks townhouse project'<br />

o The Oaks and Okanagan Crossing projects are to be constructed<br />

in phases with timing based upon market conditions'<br />

Dwayne Brown<br />

6534 Apollo Road<br />

Hill behind house goes up fairly steep<br />

No snow in winter, and then rainstorm causes flooding concerns<br />

Like to make sure better drainage is developed behind his<br />

property, so problems don't arise<br />

Will infrastructure leading up to development be done first?<br />

Don House<br />

6716 Apollo Road<br />

Staff Response:<br />

o lnfrastructure for the Hesperia project will be undertaken in<br />

phases in conjunction with each corresponding development<br />

phase. Phase f. is the relocation <strong>of</strong> the primary public road access<br />

to the site from Okanagan Avenue.<br />

o The Hesperia development will intercept a large percentage <strong>of</strong><br />

the upland storm drainage flow to the satisfaction <strong>of</strong> the<br />

MuniciPal Engineer'<br />

o Good plan, wrong Place<br />

o Green spaces and modern concept good<br />

o lnfrastructure is not there<br />

o Z}O%traffic volume increase on Apollo Road will occur<br />

o Development will 'come and go' right by his place to get into the<br />

development<br />

o No commercial development<br />

o No public transport exists<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!