24.11.2014 Views

Agenda Package - City of Vernon

Agenda Package - City of Vernon

Agenda Package - City of Vernon

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PARCEL 9, PARCEL SPECIFIC REGULATIONS SCHEDULEZB I lp.1 or2<br />

PARCEL DESGRIPTION:<br />

Maximum Lot Area: 2292m2<br />

Permitted Development:<br />

Parcel I is intended to be developed with a Community<br />

Centre fronting onto Road 7. The Building shall be<br />

constructed within the Building Envelope and Height<br />

established in the Parcel Specific Regulations in this<br />

Schedule and illustrated in drawings A, B & C on Page<br />

2 <strong>of</strong> this Schedule.<br />

PARCEL SPECIF¡C REGULATIONS:<br />

SETBACKS:<br />

1. The minimum Front Yard Setback shall be 2m.<br />

2. The maximum Front Yard Setback shall be 4m.<br />

3. The minimum Side Yard Setback shall be 8m.<br />

4. The minimum Rear Yard Setback shall be 8m.<br />

5. The minimum Flanking Yard Setback shall be 4m.<br />

6. The maximum Flanking Yard Setback shall be 6m.<br />

SITE COVERAGE & GROSS FLOOR AREA:<br />

7. The maximum Site Goverage shall be 19%.<br />

8. The maximum Gross Floor Area shall be 750m2.<br />

STREET FRONTAGES:<br />

g. The total Buildlng Frontage shall not be less than 52o/o <strong>of</strong> the Frontage, and the Building shall be constructed<br />

such that a minimum <strong>of</strong> 60% <strong>of</strong> the Bullding Frontage is constructed to the minimum Front Yard Setback .<br />

HEIGHT:<br />

10. For the purpose <strong>of</strong> measuring Height, the Facing Street shall be Road 7.<br />

1 1. The maximum Height on the Parcel shall be 3 storeys or 1 1m, whichever is greater.<br />

DECEMBER 18 2OO9<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!