Basic Construction Data<br />
These are average costs based on the allowances provided in the state’s School<br />
Facility Program. Costs will vary by location, the local building economy, and the type of<br />
facilities needed to support a district’s educational program.<br />
Cost per<br />
student*<br />
Students<br />
per<br />
school<br />
Construction<br />
cost per<br />
school<br />
Square<br />
feet per<br />
student<br />
School<br />
site size<br />
(acres)**<br />
Cost per<br />
square<br />
foot<br />
Land cost at<br />
25% of<br />
construction<br />
cost<br />
Total cost<br />
(millions)<br />
Elementary $14,774 600 $8,864,400 71 9.6 $208 $2,216,100 $11.05<br />
Middle $15,990 1,000 $15,990,000 85 21.9 $188 $3,997,500 $19.99<br />
High $20,059 1,800 $36,106,200 92 44.5 $218 $9,026,550 $45.13<br />
*Costs based on twice the state share (as of September 28, 2006) provided in the “School Facility Program.” Includes design fees,<br />
furniture, equipment, and construction.<br />
**Based on the number of students per school and the guidelines in School Site Analysis and Development, 2000 Edition.<br />
State General Obligation Bond History<br />
1982 $500 million 1992 (Nov) $900 million<br />
1984 $450 million 1994 (June) $1 billion (failed by .4%)<br />
1986 $800 million 1996 (Mar) $2 billion<br />
1988 (June) $800 million 1998 (Nov) $6.7 billion (for 4 years)<br />
1988 (Nov) $800 million 2002 (Nov) $11.4 billion<br />
1990 (June) $800 million 2004 (Mar) $10 billion<br />
1990 (Nov) $800 million 2006 (Nov) $7.33 billion<br />
1992 (June) $1.9 billion<br />
Proposition 1D<br />
In November 2006, the state’s voters approved Proposition 1D, authorizing $10.4 billion <br />
in bonds for the repair and modernization of kindergarten to university school facilities. <br />
Proposition 1D was approved by 56.6 percent of the voters. <br />
The funds from Proposition 1D for K–12 public schools break down as follows: <br />
Project Allocations<br />
New Construction<br />
Modernization<br />
Charter School Facilities<br />
Career Technical Education<br />
Joint Use Projects<br />
Severely Overcrowded Schools<br />
High Performance Schools<br />
Proposition 1D<br />
$1.9 billion<br />
$3.30 billion<br />
$0.5 billion ($500 million)<br />
$0. 5 billion ($500 million)<br />
$0.029 billion ($29 million)<br />
$1 billion<br />
$0.1 billion ($100 million)<br />
The state bond funds are allocated to K–12 school districts and county offices of<br />
education through the State Allocation Board (SAB). The Office of Public School<br />
119