Basic Construction Data<br />

These are average costs based on the allowances provided in the state’s School<br />

Facility Program. Costs will vary by location, the local building economy, and the type of<br />

facilities needed to support a district’s educational program.<br />

Cost per<br />

student*<br />

Students<br />

per<br />

school<br />

Construction<br />

cost per<br />

school<br />

Square<br />

feet per<br />

student<br />

School<br />

site size<br />

(acres)**<br />

Cost per<br />

square<br />

foot<br />

Land cost at<br />

25% of<br />

construction<br />

cost<br />

Total cost<br />

(millions)<br />

Elementary $14,774 600 $8,864,400 71 9.6 $208 $2,216,100 $11.05<br />

Middle $15,990 1,000 $15,990,000 85 21.9 $188 $3,997,500 $19.99<br />

High $20,059 1,800 $36,106,200 92 44.5 $218 $9,026,550 $45.13<br />

*Costs based on twice the state share (as of September 28, 2006) provided in the “School Facility Program.” Includes design fees,<br />

furniture, equipment, and construction.<br />

**Based on the number of students per school and the guidelines in School Site Analysis and Development, 2000 Edition.<br />

State General Obligation Bond History<br />

1982 $500 million 1992 (Nov) $900 million<br />

1984 $450 million 1994 (June) $1 billion (failed by .4%)<br />

1986 $800 million 1996 (Mar) $2 billion<br />

1988 (June) $800 million 1998 (Nov) $6.7 billion (for 4 years)<br />

1988 (Nov) $800 million 2002 (Nov) $11.4 billion<br />

1990 (June) $800 million 2004 (Mar) $10 billion<br />

1990 (Nov) $800 million 2006 (Nov) $7.33 billion<br />

1992 (June) $1.9 billion<br />

Proposition 1D<br />

In November 2006, the state’s voters approved Proposition 1D, authorizing $10.4 billion <br />

in bonds for the repair and modernization of kindergarten to university school facilities. <br />

Proposition 1D was approved by 56.6 percent of the voters. <br />

The funds from Proposition 1D for K–12 public schools break down as follows: <br />

Project Allocations<br />

New Construction<br />

Modernization<br />

Charter School Facilities<br />

Career Technical Education<br />

Joint Use Projects<br />

Severely Overcrowded Schools<br />

High Performance Schools<br />

Proposition 1D<br />

$1.9 billion<br />

$3.30 billion<br />

$0.5 billion ($500 million)<br />

$0. 5 billion ($500 million)<br />

$0.029 billion ($29 million)<br />

$1 billion<br />

$0.1 billion ($100 million)<br />

The state bond funds are allocated to K–12 school districts and county offices of<br />

education through the State Allocation Board (SAB). The Office of Public School<br />

119