Industry, Infrastructure & Power Generation<br />
93<br />
Our significant project this year is the contract for the 220 MW Korangi<br />
thermal power station. BU-OLM was responsible for the electrical testing &<br />
commissioning of 04 Nos. gas turbines for METKA (Greece), the EPC<br />
contractor for the project. This project requires foreign expertise but our<br />
local resources and expertise were enough to deliver the requirements.<br />
The power shortage in the country is a matter of great concern for all. For this reason BU OLM provided an answer<br />
to this problem by playing an important role in power projects.<br />
Our significant project this year is the contract for the 220 MW Korangi thermal power station. BU-OLM was<br />
responsible for the electrical testing & commissioning of 04 Nos. gas turbines for METKA (Greece), the EPC<br />
contractor for the project. This project requires foreign expertise but our local resources and expertise were enough<br />
to deliver the requirements.<br />
This year we have successfully completed a number of automation projects. Our significant projects are<br />
“Implementation of a S7 300 PLC & WinCC HMI based annunciation, shutdown & data logging system for a 130 MW<br />
gas turbine system at KAPCO”, ”implementation of S7 redundant PLC based alarm and trip system for compressors<br />
replacing the existing hardwiring at NRL”, and ”Implementation of a S7 PLC and WinCC HMI based automated<br />
hydrotesting system at Huffaz Seamless Pipes “.