Download - Siemens Pakistan
Download - Siemens Pakistan
Download - Siemens Pakistan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Power Transmission & Distribution<br />
75<br />
PTD Service<br />
Trainings on power system protection and power quality for engineers<br />
working in industries and power plants have been carried out. The first 4<br />
week international training for 40 Afghanistan Electric Utility engineers was<br />
successfully completed in Kabul in December 2007.<br />
Power Technologies<br />
Network Planning and Analysis: T&D Services <strong>Pakistan</strong> has become a certified centre of competence for network<br />
planning and analysis in the region from last year. Apart from load flow, fault analysis and protection coordination<br />
studies T&D Services <strong>Pakistan</strong> can now carry out harmonic analysis also thereby providing workable solutions to our<br />
valued customers who are facing acute power quality problems. Whereas regular orders are being received from<br />
our old customers, we have Nestle Kabirwala, Saba Power, ICI Sheikhupura and Dawood Chemicals as major new<br />
industrial customers of 2008. We have also received 2 orders from M/s. Becon Energy LTD. and Green Power LTD. to<br />
carry out the grid interconnection study including stability study and power quality analysis for their wind power<br />
projects in Sindh. Several other investors are showing interest in our local expertise in this field as their projects<br />
approach financial close.<br />
Power System Training: T&D Services is actively involved in power system training. These trainings have become<br />
important with the growing energy demand in <strong>Pakistan</strong>. Trainings on power system protection and power quality for<br />
engineers working in industries and power plants have been carried out. The first 4 week international training for<br />
40 Afghanistan Electric Utility engineers was successfully completed in Kabul in December 2007.<br />
Asset Services<br />
T&D Services <strong>Pakistan</strong> is engaged in providing reliable, cost effective, quality services and engineering solutions to<br />
its customers keeping in view the new market environment. During the current electrical utilities deregulation<br />
process, T&D Services is actively engaged in providing support in asset maintenance and management to the