22.11.2014 Views

March 4, 2013 - Cabarrus County

March 4, 2013 - Cabarrus County

March 4, 2013 - Cabarrus County

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

No Smoking Signs<br />

Two (2) "No Smoking Oxygen Equipped" signs will be provided. Shipped loose.<br />

Does your bid comply?<br />

Yes __X__ No_____<br />

Fasten Seat Belt Signs<br />

Two (2) "Use Of Seat Belt Required" signs will be provided. Shipped loose.<br />

Does your bid comply?<br />

Yes __X__ No_____<br />

Fire extinguishers<br />

Two (2) 5 LB. ABC fire extinguishers with mounting brackets shall be shipped loose with the ambulance.<br />

Does your bid comply?<br />

Yes __X__ No_____<br />

Oxygen Equipment<br />

There shall be furnished with the ambulance one (1) oxygen tank pressure regulator, limited to 50 PSI, and one<br />

(1) gravity type oxygen flow meter, with Ohio style adaptor.<br />

Does your bid comply?<br />

Yes __X__ No_____<br />

Paint<br />

The ambulance shall be painted in accordance with KKK-A-1822 specifications for Preparation and Painting.<br />

PPG Delfleet basecoat/clearcoat paint system will be used to paint the modular body. Prior to painting, the<br />

entire module shall be carefully ground to remove all welding slag and major scratches in the body surface and<br />

then be washed with DX330 wax and grease remover to remove all oil, dirt, and grease leftover from the<br />

manufacturing process. The entire Module will be sanded with 80 grit on a DA, body filled and re-sanded. Any<br />

pinholes will be filled with DF715 poly putty glaze coat, sanded smooth with 120-220 grit sandpaper, then<br />

rewashed with DX330 wax and grease remover. Next the module will be etched with (1) coat of a PPG mixture<br />

60<br />

Attachment number 1<br />

4-4<br />

Page 94

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!