Idari Sartname - Hava Lojistik KomutanlıÄı
Idari Sartname - Hava Lojistik KomutanlıÄı
Idari Sartname - Hava Lojistik KomutanlıÄı
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
When required, the Contracting Entity could request of Tenderers to extend the validity period of<br />
bids for a maximum period stated above before the expiration of their validity. The Tenderers could<br />
accept or reject this request. The bid bond of the tenderer who rejected the extension request of<br />
the Contracting Entity shall be returned to the Tenderer.<br />
24.3. Ancak bu sürenin bitimine rağmen ihalenin sonuçlandırılamayacağının ihale komisyonunca<br />
belirlenmesi halinde ihale yetkilisinin onayı ve isteklinin kabulü ile bu süre en fazla 60 (altmış)<br />
günlük süreler halinde yeteri kadar uzatılabilir.<br />
However, in case it is observed that the tender could not be finalized despite the end of this period,<br />
the validity time could be extended in intervals of maximum 60 (sixty) days by the authorization of<br />
the Contracting Entity and acceptance of Tenderers.<br />
24.4. Bu konudaki istek ve cevaplar yazılı olacaktır. Evraklar iadeli taahhütlü posta yoluyla<br />
gönderilecek veya imza karşılığı elden teslim edilecektir.<br />
Any request and answers concerning this topic shall be in written. Documents shall be sent by<br />
registered and reply paid mail or be handed in return for signature.<br />
25. TEKLİF FİYATINA DÂHİL OLAN MASRAFLAR/EXPENSES INCLUDED IN THE BID PRICE:<br />
25.1. Yabancı istekliler için; sözleşmenin ve taahhüdün tamamının yerine getirilmesi sürecinde<br />
malzemenin FOB/FCA teslimine kadar tahakkuk edecek her türlü vergi, resim, harç ve diğer<br />
masraflar istekliye, FOB/FCA tesliminden sonra tahakkuk edecek vergi, resim ve harç masrafları<br />
ise İdare’ye aittir.<br />
For foreign tenderers; any duty, levy and charge and as such to be incurred to FOB/FCA delivery<br />
shall be borne by the Tenderer and those after FOB/FCA by the Contracting Entity.<br />
Yerli istekliler için; sözleşmenin ve taahhüdün tamamının yerine getirilmesine ait malzemenin<br />
teslim yerine teslimine kadar tahakkuk edecek her türlü vergi, resim, harç ve diğer masraflar<br />
istekliye, teslim yerine tesliminden sonra tahakkuk edecek vergi, resim ve harç masrafları ise<br />
İdare’ye aittir. Ancak Tahakkukta doğacak vergi resim ve harçlar istekliye ait olacaktır. Ayrıca, satın<br />
alınacak malzeme için, 31 Temmuz 2004 tarih ve 25539 sayılı Resmi Gazete’de yayımlanan 5228<br />
sayılı kanunun 14 üncü maddesi ile 3065 sayılı Katma Değer Vergisi (KDV) Kanununun 13’üncü<br />
maddesine eklenen (f) fıkrası gereği KDV ödenmeyecektir.<br />
For domestic bidders; expenses to be incurred till delivery place for the enforcement of the<br />
Contract and the commitment and taxes, levies and charges as well as other expenses regarding<br />
the contract shall be borne by the Contractor and those after these points shall be borne by the<br />
Contracting Entity. However, the duties, charges and levies during the performance of the Contract<br />
and the commitment shall be borne by the Contractor. However, for the material to be procured,<br />
VAT shall not be paid in accordance with Article 14 of the Law No.5228 issued in the Official<br />
Gazzette dated 31 July 2004 and no.25539 and the subparagraph (f) added Article 13 of the Value<br />
Added Tax (VAT) Law.<br />
Serbest bölgeden teklif veren istekliler için; sözleşmenin ve taahhüdün tamamının yerine<br />
getirilmesi sürecinde malzemenin Serbest Bölge Çıkış Kapısında teslimine kadar tahakkuk edecek<br />
her türlü vergi, resim, harç ve diğer masraflar istekliye, Serbest Bölge Çıkış Kapısından sonra<br />
tahakkuk edecek vergi, resim ve harç masrafları ise İdare’ye aittir.<br />
For the tenderers located in Free Zone; any duty, levy and charge and as such to be incurred<br />
to the delivery at the Free Zone Exit Gate shall be borne by the Tenderer and those after Free<br />
Zone Exit Gate by the Contracting Entity.<br />
25.2. Akreditifle ilgili İdare’nin ülkesindeki banka masrafları İdareye, yurt dışındaki muhabir banka<br />
masrafları Yükleniciye ait olacaktır. Herhangi bir sebeple akreditifin süresinin uzatılması gerekirse,<br />
akreditifin süresinin uzatılması ile ilgili yurt dışındaki muhabir banka masrafları da Yükleniciye ait<br />
olacaktır.<br />
Banking expenses of letter of credit incurring in the Contracting Entity’s country shall be paid by the<br />
Contracting Entity and those of the correspondent bank at abroad by the Contractor. If any time<br />
extension is required for the letter of credit for any reason, expenses of the correspondent bank<br />
abroad shall be borne by the Contractor.<br />
25.3. Teminat Mektupları ile ilgili tüm masraflar Yükleniciye aittir.<br />
Expenses of letter of guarantees shall be borne by the Contractor.<br />
HK12-A7-041 36