AUSTRALIA’S IDENTIFIED MINERAL RESOURCES <strong>2005</strong><br />

White Mining Ltd: The $110 million 1.6 Mtpa Ashton open-cut mine commenced in early 2004.<br />

Underground development is due to start in 2007 at 2.1 Mtpa ahead of a 3.0 Mtpa longwall operation<br />

planned to start in 2009. At Moolarben, a 4.0 Mtpa open-cut thermal coal mine is scheduled to<br />

commence operation in 2008 with a 3.0 Mtpa underground mine to commence in 2010.<br />

Resource Pacific Holdings: The Newpac No1 Colliery (previously called Nardell) commenced<br />

operations in April 2004 using continuous miners at a rate of 0.6 Mtpa. The company plans to<br />

introduce longwall mining producing 4.0 Mtpa by 2008. At Bellpac No1 (previously known as<br />

Bellambi West Colliery), a study is examining the viability of accessing coal in the western area<br />

through a sub-lease of infrastructure at the former Cordeaux mine and processing coal at the<br />

Dendrobium Colliery.<br />

Yanzhou Coal Mining: Southland was sold for US$23 million and Yanzhou plan to install a new<br />

$100 million 2 Mtpa longwall operation by mid-2006. The new Austar mine development is planned<br />

to begin in during <strong>2005</strong>.<br />

AMCI: A development application has been submitted for a 1.6 Mtpa open-cut thermal coal mine at<br />

Werris Creek, which will have a mine life of seven years.<br />

Northern Energy Corporation (previously known as Poltech International): A bankable<br />

feasibility study is to be undertaken on the historic Ashford coal deposit near Inverell in northern NSW.<br />

Newcastle Coal Company: The Tasman underground thermal coal mine is proposed to be<br />

developed at a rate of 1.0 Mtpa using bord and pillar methods.<br />

Whitehaven Coal Mining: The Belmont open-cut thermal coal mine is proposed to be developed<br />

with a capacity of 1.5 Mtpa. Whitehaven and Idemitsu Boggabri Coal are planning to commence an<br />

open-cut thermal coal mine at East Boggabri in late <strong>2005</strong>.<br />

Bloomfield Collieries: The Bickham open-cut thermal coal mine is planned to be developed with<br />

production of up to 2.5 Mtpa.<br />

Muswellbrook Coal Company: Propose to develop the Sandy Creek underground thermal coal mine.<br />

Hunter Enviro-Mining: Plan to restart operations at Hebburn No2 Colliery near Cessnock to clean<br />

up and revegetate the mine site. Some $11 million is to be spent to rehabilitate the site, which closed<br />

in 1972. The project is expected to produce 300 000 t of coal over a four year operating life.<br />

INDUSTRY DEVELOPMENTS – WESTERN AUSTRALIA AND SOUTH AUSTRALIA<br />

In Western <strong>Australia</strong>, the Aviva Corporation propose to supply coal from the Central West Coal<br />

Project near Eneabba to a pig iron enterprise in the mid-west and/or to a 300 MW mine mouth<br />

power station supplying 1.8 Mtpa over 25 years from 2008. Wesfarmers are planning to increase<br />

production at Collie to about 5 Mtpa by 2007 and are also planning a $5 million char-making<br />

demonstration plant. In South <strong>Australia</strong> NRG Flinders has taken a six year option from Felix<br />

Resources over the Phillipson Basin coal tenements.<br />

INDUSTRY DEVELOPMENTS – INFRASTRUCTURE<br />

In Queensland, a reclaiming boom at the Dalrymple Bay Coal Terminal collapsed in mid-February<br />

disrupting coal loading capacity until mid-April 2004. Prime Infrastructure is increasing the capacity<br />

at the Dalrymple Bay Coal Terminal from 55 to 60 Mtpa by early 2006 at a cost of $30 million. In late<br />

2004, Prime Infrastructure commenced a detailed engineering and design program for a $600 million<br />

staged expansion to 90 Mtpa. At the Hay Point Coal Terminal, US$100 million is to be spent to<br />

increase capacity from 32 to 40 Mtpa as part of BMA’s coking coal expansion plans. The R.G.Tanna<br />

Coal Terminal at the Port of Gladstone is undergoing a $167 million expansion from 40 to 54 Mtpa<br />

commencing in early <strong>2005</strong>. The new infrastructure includes a third rail unloading station, a third<br />

shiploader, a fourth berth and two additional coal stockpiles.<br />