AUSTRALIA’S IDENTIFIED MINERAL RESOURCES <strong>2005</strong><br />
Moorvale coal mine, Bowen Basin, Queensland (Macarthur Coal Ltd).<br />
Peabody Energy: Mining operations commenced at the $195 million 1 Mtpa Eaglefield open-cut coking<br />
coal project. Production will supplement that from the nearby North Goonyella underground mine.<br />
Wesfarmers: Construction of the $290 million Curragh North open-cut project commenced in<br />
September 2004 and the first coal is scheduled to be produced by mid-<strong>2005</strong>. Coal will be transported<br />
via a 20 km conveyor system to the current Curragh processing plant, which is to be upgraded.<br />
Production is planned to increase from 6.5 to 9 Mtpa in 2006 and mine life will extend about nine<br />
years to 2025.<br />
Felix Resources: The Yarrabee North mine extension commenced in June 2004. Construction at<br />
the $68 million Minerva open-cut mine commenced in August 2004. Production of high volatile PCI<br />
and thermal coal is expected to commence in mid-<strong>2005</strong> at a rate of 2.5 Mtpa and continue over an<br />
11 year mine life.<br />
Excel Coal: Construction of the $60 million Millennium open-cut coking coal project commenced in<br />
December 2004 and is expected to be completed in late <strong>2005</strong> with a capacity of up to 2.5 Mtpa.<br />
Tarong Energy: The proposed Glen Wilga open-cut thermal coal project near Chinchilla is initially<br />
planned to produce 0.5 Mtpa. Planning is progressing on the development of a 150 km rail line from<br />
Brigalow to the Tarong Power Station.<br />
21<br />
Bowen Basin Coal Pty Ltd: The proposed Vermont open-cut mine, located about 15 km north-east<br />
of Dysart, is planned to produce 2.5 Mtpa of coking and PCI coal over 15 years.<br />
Ensham Resources: Is investigating the development of a high capacity underground longwall<br />
operation at the Ensham mine, where production may be increased from 8 to 20 Mtpa by 2009.<br />
Eastern Corporation: Are considering a proposal to commence open-cut production by 2007 at<br />
the Broughton coking and thermal coal deposit south of the Hail Creek mine.