Success story<br />
Singapore<br />
NEWS<br />
news<br />
October 2012 - <strong>Trenchless</strong> <strong>International</strong><br />
10<br />
Singapore watermains to be assessed<br />
In Singapore, PUB, the nation’s national water agency, will be<br />
assessing the condition of water transmission mains by using acoustic<br />
pipe condition assessment services.<br />
Echologics was selected as contractor because its technology<br />
was able to meet PUB’s requirements to assess ageing transmission<br />
mains in its service area and provide information that can be used as<br />
part of its ongoing asset management strategy.<br />
The company will acoustically survey approximately 1.6 km of cast<br />
iron and steel water transmission mains, ranging from 500 mm–800 mm<br />
in diameter, in PUB’s service area to non-invasively detect leaks and<br />
measure the mains’ effective wall thickness.<br />
Glasgow city centre watermains upgrade<br />
Pipelining nightshift in Brussels<br />
Scottish Water is set to commence a major upgrade of the water<br />
pipe network in the Glasgow city centre by replacing 5 miles of ageing<br />
distribution mains to improve services.<br />
The £3.5 million upgrade will reduce the risk of bursts and the inconvenience<br />
to customers, road users and pedestrians caused by them.<br />
Many of the pipes that supply water to thousands of properties and<br />
customers in the city centre date back to the Victorian age and the area<br />
has suffered from a number of bursts and disruption to supply recently.<br />
The project is expected to be complete by mid-2013.<br />
In the Belgian capital of Brussels, KMG Pipe Technologies recently<br />
carried out an overnight sewer rehabilitation project using synthetic fibre<br />
pipelining materials.<br />
For the rehabilitation of the 169 m long oval profile 600/900 mm sewer, a<br />
Uniliner synthetic fibre liner was employed.<br />
The installation team inverted the liner using a 3.5 m high mobile winding<br />
tower. Once the liner was installed into the sewer, it was cured with steam<br />
injected into the liner by a truck-mounted steam generator.<br />
For a full project re-cap turn to page 30.<br />
New sewers in Tilehurst nearing completion<br />
A complex project to upsize sewers in Tilehurst, located outside of London, to<br />
cope with an additional 95 tonnes of sewage is nearly complete.<br />
Since January 2012, Thames Water contractor for the project, Optimise, have<br />
been installing new sewer pipes to upgrade the area’s network with an auger borer.<br />
Auger boring is being used to create the new path for the sewer pipe, minimising<br />
the number of open trenches required. This technique makes the installation<br />
process quicker and less disruptive.<br />
The £1 million project has seen bigger sewers laid in Hildens Drive, City Road,<br />
Longworth Avenue and Foxcombe Drive.<br />
Can’t wait for the next edition of <strong>Trenchless</strong> <strong>International</strong>?<br />
Get the latest news at www.trenchlessinternational.com/news<br />
Achievement:<br />
Sewer extension to serve North Coast<br />
Area – Contract 3 was given priority<br />
status by the Public Utilities Board, the<br />
developers of land surrounding the<br />
Woodland North Coast Area. The aim<br />
of the project was to provide service<br />
to the Woodland North Coast Area<br />
and, due to the scheduled start of<br />
construction on a new factory, delays<br />
were simply not acceptable.<br />
The project, which involved installing<br />
1.1 km of sewage lines (1 m in diameter)<br />
and constructing seven manholes,<br />
needed to be completed in a mere six<br />
months.<br />
Project background<br />
Client<br />
Public Utilities Board<br />
Job site<br />
Singapore, Admiralty Road<br />
West<br />
Main contractor Swee Hong Engineering<br />
Construction Pte Ltd<br />
Total project length 1,100 m<br />
Geology<br />
Silt and gravel<br />
mts Perforator GmbH<br />
Am Heisterbusch 18a<br />
19246 Lüttow-Valluhn,<br />
Germany<br />
Using an mts800S2 jacking machine,<br />
upskinned to ID1000/ OD1350, the<br />
sewer lines were fully completed<br />
within three months, with a record of<br />
54 meters installed in a single 12-hour<br />
shift.<br />
With this equipment, it was possible<br />
to complete the project within the<br />
contractually agreed time period.<br />
Tel.: +49-38851-3270<br />
Fax.: +49-38851-32710<br />
Customer<br />
Machine<br />
Max. torque<br />
Max. drive length<br />
Internet: www.mts-p.de<br />
E-mail: info@mts-p.de<br />
Short facts<br />
Swee Hong<br />
Engineering<br />
Construction Pte Ltd<br />
mts800S2<br />
71,000 Nm<br />
150 m