21.11.2014 Views

tunnel's - Trenchless International

tunnel's - Trenchless International

tunnel's - Trenchless International

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

h e r r e n k n e c h t A G | u t i l i t y t u n n e l l i n G | t r A f f i c t u n n e l l i n G<br />

PA n A m A<br />

Issue 17 - October 2012<br />

OIL AND GAS<br />

Stitch-boring keeps it sweet 46<br />

Crossing the Ghats – the Dabhol to 48<br />

Bangalore Pipeline<br />

business development<br />

The importance of integration 50<br />

company news<br />

The myth, the fact, and<br />

the legend – sealing systems 52<br />

Tracking on 50 years 54<br />

Ultimate excavation power 56<br />

Great Southern Press appoints CEO 57<br />

PAnAmA city: SPlenDOr AnD GlOriA<br />

fOr A neW WASteWAter SyStem.<br />

The large-scale sewerage project is helping the growing metropolis move towards a bright<br />

future using high-tech made by Herrenknecht. As the first EPB Shield ever used in Panama,<br />

Gloria’s (Ø 3,000mm) tunnelling performance achieved peak rates of up to 146 lining segments<br />

per week. The drilling procedure directly below Panama City’s streets with an unusually extreme<br />

90-degree bend at a depth of up to 25 meters is attracting a great deal of attention<br />

in the media. This is how Gloria has been doing credit to its name since the beginning of the<br />

tunnel work on the sewage collector – especially since its first breakthrough on May 31, 2012.<br />

P A n A m A c i t y | P A n A m A<br />

In this issue | UK | US | South India | Germany | France | China | Brazil | Australia | Colombia<br />

Under Brazil<br />

Oil and Gas<br />

CIPP<br />

Light at<br />

tunnel’s<br />

end<br />

PROJEct data<br />

M-1494M, EPB Shield<br />

Drilling diameter. 3,000mm<br />

Installed power: 630kW<br />

Tunnel length: 8,067m<br />

Geology: volcanic rock,<br />

andesite/basalt<br />

cONtRactOR<br />

OSEL – Odebrecht<br />

Servicios No<br />

Exterior Ltd.<br />

October 2012<br />

Issue 17<br />

The official magazine of the ISTT<br />

The cover shows one of the Herrenknecht tunnel boring<br />

machines being used to excavate a tunnel system in Germany.<br />

For a full project overview turn to page 22.<br />

Herrenknecht AG<br />

D-77963 Schwanau<br />

Phone + 49 7824 302-0<br />

Fax + 49 7824 3403<br />

marketing@herrenknecht.com<br />

www.herrenknecht.com<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!