tunnel's - Trenchless International
tunnel's - Trenchless International
tunnel's - Trenchless International
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
North Shore<br />
cables get an upgrade<br />
ISTT No-Dig 2013 –<br />
save the date!<br />
The ISTT heads<br />
to Sydney, Australia,<br />
1–4 September 2013.<br />
See page 36.<br />
Crews are in the final stages of replacing more than 2 km of high voltage<br />
transmission cable to power 15,000 homes and businesses across Sydney's North Shore.<br />
The DN 700 ductile iron pipeline dipping into<br />
the drilling fluid.<br />
The enclosure in the assembly area.<br />
Around the World<br />
Around<br />
the CloCk<br />
Additionally, tractive force for the pull-in was<br />
below the allowable 165 t.<br />
Project completion<br />
The remaining drilling fluid between the<br />
ductile iron pipeline and the tunnel wall was<br />
replaced by a hydraulically curing cementbased<br />
suspension.<br />
With the easily assembled BLS/VRS-T<br />
system, pipe-by-pipe assembly proved to<br />
be an advantage in this case, and even<br />
in cramped conditions the angle of entry<br />
required was easy to set and still allowed<br />
high installation rates to be achieved.<br />
The existing 33,000 volt cables and<br />
wires were installed in the 1960s to<br />
connect the Crows Nest zone substation<br />
to a major supply point in Artarmon.<br />
Horizontal directional drilling specialists<br />
recently finished drilling two 600 mm-wide<br />
tunnels under the North Shore rail line<br />
in Artarmon as part of the ten month<br />
replacement project.<br />
The 150 m long tunnels between Ella<br />
Street and Naremburn Park in Artarmon<br />
will hold conduit pipes to carry six new<br />
132,000 volt cables.<br />
Ausgrid General Manager Transmission<br />
Brett Hooper said the next stage of work<br />
included pulling the new 132,000 volt<br />
cables through the conduits.<br />
“The existing cables have served the<br />
North Shore community well for half a<br />
century and are now approaching the time<br />
for replacement,” Mr Hooper said.<br />
“Substation technicians are also installing<br />
equipment in the recently completed new<br />
substation building adjoining the existing<br />
substation built in the 1930s.<br />
“The replacement of ageing electrical<br />
infrastructure across the North Shore<br />
will help meet the electricity needs of<br />
the area.”<br />
Temporary road surfaces along the<br />
cable route will be permanently restored<br />
once all work on the project is complete.<br />
Some of the upgrade works as part of<br />
the project.<br />
Brandenburger<br />
projects<br />
October 2012 - <strong>Trenchless</strong> <strong>International</strong><br />
Parts and Service<br />
by American Augers<br />
Parts After Hours (567) 412-4005 • Service After Hours (423) 508-0088<br />
American Augers is Proud to have Assembled the Most Knowledgeable Service Technicians in the Industry!<br />
Lee Adkins<br />
Field Service Manager<br />
Traditional Products<br />
Stelios Dicomitis<br />
Service Technician<br />
(Bi-Lingual)<br />
Mike Austin<br />
Field Service Manager<br />
Oil & Gas Products<br />
Elliot Maya<br />
Service Technician<br />
(Bi-Lingual)<br />
Jim Lee<br />
Auger Boring<br />
Supervisor<br />
Gene McFarland<br />
Service<br />
Technician<br />
Dan Heath<br />
Training<br />
Manager<br />
Manuel Ortiz<br />
Service Technician<br />
(Bi-Lingual)<br />
Seth Cole<br />
Service<br />
Technician<br />
Paul Perrine<br />
Service<br />
Technician<br />
Doug Dawson<br />
Service<br />
Technician<br />
Tim Slarb<br />
Service<br />
Technician<br />
Eric Diaz<br />
Service Technician<br />
(Bi-Lingual)<br />
Chris Spotts<br />
Service<br />
Technician<br />
Maxi-Rig Directional Drills • Auger Boring Machines • Product Tooling & Accessories • Mud Pump & Cleaning Systems • Oil & Gas Drill Rigs • Mid-Size Directional Drills<br />
For more information,<br />
contact Steffen Ertelt<br />
Head of Applications<br />
Engineering, Duktus<br />
Rohrsysteme Wetzlar GmbH<br />
Sophienstraße 52–54 35576<br />
Wetzlar, Germany<br />
T +49 (0) 6441 49 1267<br />
F +49 (0) 6441 49 1200<br />
M +49 (0) 172 72 21 179<br />
steffen.ertelt@duktus.com<br />
www.duktus.com<br />
For more news, information and<br />
projects involving HDD, visit:<br />
HDD<br />
www.trenchlessinternational.com/resource<br />
Brandenburger<br />
CIPP Lining<br />
<strong>Trenchless</strong> sewer rehabilitation with seamless, UV light-curing GFRP pipe liners.<br />
An approved system for more than 25 years:<br />
More than 3 million metres of installed liners in 30 countries.<br />
The BB plus liner:<br />
- Diameters from DN 150 - 1000<br />
- Suitable for circle, oval and special profiles<br />
- Seamlessly wound with high<br />
and durable strength<br />
- Even wall construction<br />
and constant stretch behavior<br />
The advantages:<br />
- Excellent quality due to the use<br />
of high-grade materials<br />
- Easy handling, short curing times<br />
- High storage stability<br />
- Lowest wall thicknesses due to excellent<br />
mechanical characteristics<br />
New: The Brandenburger Heatliner ®<br />
for the heat recovery from sewage!<br />
Brandenburger Liner GmbH & Co. KG<br />
Taubensuhlstrasse 6<br />
D - 76829 Landau/Pfalz<br />
Tel. +49 63 41 / 51 04 -0<br />
Fax +49 63 41 / 51 04 -155<br />
e-mail:info@brandenburger.de<br />
www.brandenburger.de<br />
projects<br />
October 2012 - <strong>Trenchless</strong> <strong>International</strong><br />
26<br />
AA Tech Services ad TI.indd 1<br />
9/7/12 9:00 AM<br />
27