21.11.2014 Views

tunnel's - Trenchless International

tunnel's - Trenchless International

tunnel's - Trenchless International

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

North Shore<br />

cables get an upgrade<br />

ISTT No-Dig 2013 –<br />

save the date!<br />

The ISTT heads<br />

to Sydney, Australia,<br />

1–4 September 2013.<br />

See page 36.<br />

Crews are in the final stages of replacing more than 2 km of high voltage<br />

transmission cable to power 15,000 homes and businesses across Sydney's North Shore.<br />

The DN 700 ductile iron pipeline dipping into<br />

the drilling fluid.<br />

The enclosure in the assembly area.<br />

Around the World<br />

Around<br />

the CloCk<br />

Additionally, tractive force for the pull-in was<br />

below the allowable 165 t.<br />

Project completion<br />

The remaining drilling fluid between the<br />

ductile iron pipeline and the tunnel wall was<br />

replaced by a hydraulically curing cementbased<br />

suspension.<br />

With the easily assembled BLS/VRS-T<br />

system, pipe-by-pipe assembly proved to<br />

be an advantage in this case, and even<br />

in cramped conditions the angle of entry<br />

required was easy to set and still allowed<br />

high installation rates to be achieved.<br />

The existing 33,000 volt cables and<br />

wires were installed in the 1960s to<br />

connect the Crows Nest zone substation<br />

to a major supply point in Artarmon.<br />

Horizontal directional drilling specialists<br />

recently finished drilling two 600 mm-wide<br />

tunnels under the North Shore rail line<br />

in Artarmon as part of the ten month<br />

replacement project.<br />

The 150 m long tunnels between Ella<br />

Street and Naremburn Park in Artarmon<br />

will hold conduit pipes to carry six new<br />

132,000 volt cables.<br />

Ausgrid General Manager Transmission<br />

Brett Hooper said the next stage of work<br />

included pulling the new 132,000 volt<br />

cables through the conduits.<br />

“The existing cables have served the<br />

North Shore community well for half a<br />

century and are now approaching the time<br />

for replacement,” Mr Hooper said.<br />

“Substation technicians are also installing<br />

equipment in the recently completed new<br />

substation building adjoining the existing<br />

substation built in the 1930s.<br />

“The replacement of ageing electrical<br />

infrastructure across the North Shore<br />

will help meet the electricity needs of<br />

the area.”<br />

Temporary road surfaces along the<br />

cable route will be permanently restored<br />

once all work on the project is complete.<br />

Some of the upgrade works as part of<br />

the project.<br />

Brandenburger<br />

projects<br />

October 2012 - <strong>Trenchless</strong> <strong>International</strong><br />

Parts and Service<br />

by American Augers<br />

Parts After Hours (567) 412-4005 • Service After Hours (423) 508-0088<br />

American Augers is Proud to have Assembled the Most Knowledgeable Service Technicians in the Industry!<br />

Lee Adkins<br />

Field Service Manager<br />

Traditional Products<br />

Stelios Dicomitis<br />

Service Technician<br />

(Bi-Lingual)<br />

Mike Austin<br />

Field Service Manager<br />

Oil & Gas Products<br />

Elliot Maya<br />

Service Technician<br />

(Bi-Lingual)<br />

Jim Lee<br />

Auger Boring<br />

Supervisor<br />

Gene McFarland<br />

Service<br />

Technician<br />

Dan Heath<br />

Training<br />

Manager<br />

Manuel Ortiz<br />

Service Technician<br />

(Bi-Lingual)<br />

Seth Cole<br />

Service<br />

Technician<br />

Paul Perrine<br />

Service<br />

Technician<br />

Doug Dawson<br />

Service<br />

Technician<br />

Tim Slarb<br />

Service<br />

Technician<br />

Eric Diaz<br />

Service Technician<br />

(Bi-Lingual)<br />

Chris Spotts<br />

Service<br />

Technician<br />

Maxi-Rig Directional Drills • Auger Boring Machines • Product Tooling & Accessories • Mud Pump & Cleaning Systems • Oil & Gas Drill Rigs • Mid-Size Directional Drills<br />

For more information,<br />

contact Steffen Ertelt<br />

Head of Applications<br />

Engineering, Duktus<br />

Rohrsysteme Wetzlar GmbH<br />

Sophienstraße 52–54 35576<br />

Wetzlar, Germany<br />

T +49 (0) 6441 49 1267<br />

F +49 (0) 6441 49 1200<br />

M +49 (0) 172 72 21 179<br />

steffen.ertelt@duktus.com<br />

www.duktus.com<br />

For more news, information and<br />

projects involving HDD, visit:<br />

HDD<br />

www.trenchlessinternational.com/resource<br />

Brandenburger<br />

CIPP Lining<br />

<strong>Trenchless</strong> sewer rehabilitation with seamless, UV light-curing GFRP pipe liners.<br />

An approved system for more than 25 years:<br />

More than 3 million metres of installed liners in 30 countries.<br />

The BB plus liner:<br />

- Diameters from DN 150 - 1000<br />

- Suitable for circle, oval and special profiles<br />

- Seamlessly wound with high<br />

and durable strength<br />

- Even wall construction<br />

and constant stretch behavior<br />

The advantages:<br />

- Excellent quality due to the use<br />

of high-grade materials<br />

- Easy handling, short curing times<br />

- High storage stability<br />

- Lowest wall thicknesses due to excellent<br />

mechanical characteristics<br />

New: The Brandenburger Heatliner ®<br />

for the heat recovery from sewage!<br />

Brandenburger Liner GmbH & Co. KG<br />

Taubensuhlstrasse 6<br />

D - 76829 Landau/Pfalz<br />

Tel. +49 63 41 / 51 04 -0<br />

Fax +49 63 41 / 51 04 -155<br />

e-mail:info@brandenburger.de<br />

www.brandenburger.de<br />

projects<br />

October 2012 - <strong>Trenchless</strong> <strong>International</strong><br />

26<br />

AA Tech Services ad TI.indd 1<br />

9/7/12 9:00 AM<br />

27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!