21.11.2014 Views

GUIDELINES Disposal of Wastes in Cement Plants - BAFU

GUIDELINES Disposal of Wastes in Cement Plants - BAFU

GUIDELINES Disposal of Wastes in Cement Plants - BAFU

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GUIDELINES</strong> <strong>Disposal</strong> <strong>of</strong> Waste <strong>in</strong> <strong>Cement</strong> <strong>Plants</strong> 12<br />

6.3 Requirements for the use <strong>of</strong> CSS and its preparation<br />

a. All cement plants which use CSS must comply with the requirements <strong>of</strong> these Guidel<strong>in</strong>es<br />

concern<strong>in</strong>g cl<strong>in</strong>ker and cement quality, flue gas pollutants, operation and control apply to<br />

cement plants. The special requirements <strong>of</strong> Appendix II apply to the composition <strong>of</strong> waste<br />

mixtures allowed as alternative fuels.<br />

b. Installations that produce CSS or that mix special waste and other waste subject to control<br />

for the purpose <strong>of</strong> produc<strong>in</strong>g CSS must comply with the special requirements <strong>of</strong> Appendix<br />

II <strong>of</strong> these Guidel<strong>in</strong>es. If not otherwise specified <strong>in</strong> Appendix II, the requirements <strong>of</strong><br />

Section 5.2. apply.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!