PART A<br />

• Building Works <strong>at</strong> <strong>Bukit</strong> <strong>Merah</strong> Redevelopment Contract <strong>40</strong><br />

(Total: 1100 Dwelling Units)<br />

PART B<br />

• Reconstruction of Existing Open Drain along Kim Tian Road into<br />

Covered Drain<br />

PART C<br />

• Contingency Works


• Prevent Earth, silt, sand or any other m<strong>at</strong>erial from<br />

the work site being washed into the drains and<br />

adjacent premises.<br />

• Control soil erosion.<br />

• Ensure th<strong>at</strong> discharge into the storm w<strong>at</strong>er drainage<br />

system shall not contain Total Suspended Solids in<br />

concentr<strong>at</strong>ions gre<strong>at</strong>er than 50 milligrams<br />

per litre of the discharge.


SITE ECM ORGANIZATION CHART<br />

Seetoh Yew Choong<br />

Snr. Project Manager<br />

Kwek Tsu Yong<br />

WSHO<br />

Adam Ubaidulla<br />

Asst. Project Manager<br />

M Chinnasami<br />

Env. Ctrl. Officer<br />

S S<strong>at</strong>heeshkumar<br />

Env. Ctrl. Officer<br />

C Arumugam<br />

Asst. ECO<br />

ECM Maintenance Vector Control <strong>Ho</strong>usekeeping<br />

Document<strong>at</strong>ion


Preventing discharge of untre<strong>at</strong>ed w<strong>at</strong>er<br />

◦ Determine flow of w<strong>at</strong>er<br />

◦ <strong>Ho</strong>w many tre<strong>at</strong>ment plants needed<br />

◦ Loc<strong>at</strong>ion of tre<strong>at</strong>ment plant<br />

Installing necessary device to control erosion<br />

Providing proper access


CCTV<br />

Sensor<br />

TSS reading<br />

32 mg/L


TSS < 50 mg/L


Turfing done to minimise<br />

bare earth surfaces


W<strong>at</strong>er sprayed over asphalt<br />

access to prevent dust<br />

from being blown


Premix used to provide<br />

better access


UNEXPECTED<br />

HEAVY<br />

DOWNPOUR


During heavy downpour,<br />

high volume of w<strong>at</strong>er fills<br />

storage drain almost to the<br />

brim


Recycling<br />

bay


W<strong>at</strong>er discharged to wash<br />

bay<br />

W<strong>at</strong>er discharge to<br />

recycling tank


<strong>Ho</strong> <strong>Lee</strong> <strong>Construction</strong> <strong>Pte</strong> <strong>Ltd</strong><br />

BM <strong>RC</strong> <strong>40</strong><br />

- KIM TIAN<br />

RD<br />

Unwavering Top management support<br />

‣ Cost spent on ECM - $300, 000<br />

Strong Teamwork<br />

‣Support from all on-site<br />

<strong>PUB</strong> Guidance<br />

‣Regular visit by <strong>PUB</strong><br />

1 13/06/2008<br />

2 25/06/2008<br />

3 19/03/2008<br />

Aquased Model ASIII-<strong>40</strong> <strong>at</strong> <strong>40</strong>-50<br />

M2/hr<br />

Aquased Model ASIII-<strong>40</strong> <strong>at</strong> <strong>40</strong>-50<br />

M2/hr<br />

Aquased Model ASIII-30 <strong>at</strong> 30-<strong>40</strong><br />

M3/hr<br />

W<strong>at</strong>er Tre<strong>at</strong>ment System<br />

<strong>40</strong>08-06-096 KBI Contracts<br />

P/O no: 70<strong>40</strong>2 via D/O no: D330-<br />

$28,600.00<br />

06-08<br />

<strong>40</strong>08-06-098 KBI Contracts<br />

P/O no: 70416 via D/O no: D366-<br />

$28,600.00<br />

06-09<br />

SIN30080911<br />

0<br />

Erosion Control Blanket<br />

P/O no: 76855 via D/O no: D458-<br />

KBI Contracts $19,800.00<br />

03-09<br />

D<strong>at</strong>e DO PO Suppliers Item Qty Unit Unit Price Amount<br />

Remar<br />

k<br />

24/03/<br />

09 2548 76870 Wall Tag<br />

Fibrotag MP<strong>40</strong>0<br />

(2.4mx21m) 10 roll<br />

$<br />

52.92<br />

$<br />

529.20 P.O<br />

26/03/<br />

Fibrotag MP<strong>40</strong>0<br />

$ $<br />

09 2570 76877 Wall Tag (2.4mx21m) 20 roll<br />

52.92 1,058.<strong>40</strong> P.O<br />

16/04/<br />

09 92010 N.A Wall Tag<br />

Fibrotag MP<strong>40</strong>0<br />

(2.4mx21m) 4 roll<br />

$<br />

52.92<br />

$<br />

211.68 COD<br />

Seeding<br />

D<strong>at</strong>e DO PO Suppliers Item Qty Unit<br />

Unit<br />

Price Amount<br />

Remar<br />

k<br />

26/03/<br />

09 2570 76877 Wall Tag Seeding (1kg/<strong>40</strong>m2) 5 bag<br />

$<br />

25.00<br />

$<br />

125.00<br />

10/04/<br />

09 N,A N,A Wall Tag Seeding (1kg/<strong>40</strong>m2) 10 bag<br />

Milled Waste<br />

D<strong>at</strong>e DO PO Suppliers Item Qty Unit<br />

21/06/<br />

08 N.A 70539 Wee Guan Milled Waste 3 load<br />

31/03/<br />

09 N.A 76894 Wee Guan Milled Waste 4 load<br />

01/04/<br />

09 N.A 76894 Wee Guan Milled Waste 4 load<br />

02/04/<br />

09 N.A 76894 Wee Guan Milled Waste 1 load<br />

27/06/<br />

08 N.A 70543 Samwoh Milled Waste 3 load<br />

25/06/<br />

08 N.A 70551 Samwoh Milled Waste 4 load<br />

23/03/<br />

09 N.A 75558 Samwoh Milled Waste 5 load<br />

09/07/<br />

08 N.A 705<strong>40</strong> Double Trans Milled Waste 5 load<br />

19/02/<br />

09 N.A 76459 Double Trans Milled Waste 5 load<br />

25/02/<br />

09 N.A 76759 Double Trans Milled Waste 5 load<br />

26/02/<br />

09 N.A 76759 Double Trans Milled Waste 2 load<br />

06/03/<br />

09 N.A 76074 Double Trans Milled Waste 5 load<br />

10/03/<br />

09 N.A 76074 Double Trans Milled Waste 2 load<br />

12/03/<br />

09 N.A 76139 Double Trans Milled Waste 1 load<br />

13/03/<br />

09 N.A 76139 Double Trans Milled Waste 1 load<br />

14/03/<br />

09 N.A 76139 Double Trans Milled Waste 1 load<br />

16/03/<br />

09 N.A 76139 Double Trans Milled Waste 1 load<br />

17/03/<br />

09 N.A 76139 Double Trans Milled Waste 2 load<br />

19/03/<br />

09 N.A 76863 Double Trans Milled Waste 1 load<br />

20/03/<br />

09 N.A 76863 Double Trans Milled Waste 3 load<br />

03/04/<br />

09 N.A 76923 Double Trans Milled Waste 5 load<br />

04/04/<br />

09 N.A 76923 Double Trans Milled Waste 3 load<br />

06/04/<br />

09 N.A 76923 Double Trans Milled Waste 1 load<br />

08/04/<br />

09 N.A 76923 Double Trans Milled Waste 6 load<br />

13/04/<br />

09 N.A 76923 Double Trans Milled Waste 1 load<br />

14/04/<br />

09 N.A 77136 Double Trans Milled Waste 2 load<br />

18/04/<br />

09 N.A 77136 Double Trans Milled Waste 1 load<br />

Geotextile<br />

D<strong>at</strong>e DO PO Suppliers Item Qty Unit<br />

29/05/<br />

Geotextile<br />

08 14913 69826 HK Hardware 2Mx150M-white 1 roll<br />

23/08/<br />

Geotextile<br />

08 25893 69897 HK Hardware 2Mx150M-white 1 roll<br />

$<br />

25.00<br />

$<br />

250.00 COD<br />

Unit<br />

Price Amount<br />

Remar<br />

k<br />

$ $<br />

105.00 315.00<br />

$ $<br />

130.00 520.00<br />

$ $<br />

130.00 520.00<br />

$ $<br />

130.00 130.00<br />

$ $<br />

110.00 330.00<br />

$ $<br />

110.00 4<strong>40</strong>.00<br />

$ $<br />

120.00 600.00<br />

$ $<br />

100.00 500.00<br />

$ $<br />

120.00 600.00<br />

$ $<br />

120.00 600.00<br />

$ $<br />

120.00 2<strong>40</strong>.00<br />

$ $<br />

120.00 600.00<br />

$ $<br />

120.00 2<strong>40</strong>.00<br />

$ $<br />

120.00 120.00<br />

$ $<br />

120.00 120.00<br />

$ $<br />

120.00 120.00<br />

$ $<br />

120.00 120.00<br />

$ $<br />

120.00 2<strong>40</strong>.00<br />

$ $<br />

120.00 120.00<br />

$ $<br />

120.00 360.00<br />

$ $<br />

120.00 600.00<br />

$ $<br />

120.00 360.00<br />

$ $<br />

120.00 120.00<br />

$ $<br />

120.00 720.00<br />

$ $<br />

120.00 120.00<br />

$ $<br />

150.00 300.00<br />

$ $<br />

150.00 150.00<br />

Unit<br />

Price Amount<br />

Remar<br />

k<br />

$ $<br />

230.00 230.00<br />

$ $<br />

230.00 230.00<br />

Miscellaneous $218,000<br />

.00 218000<br />

TOTAL COST $306,839.28


BM<strong>RC</strong> <strong>40</strong>