office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
9<br />
Follow<strong>in</strong>g enhancement factors will be used for <strong>the</strong> costs <strong>of</strong> works executed and <strong>the</strong> f<strong>in</strong>ancial figures<br />
to a common base value for works completed <strong>in</strong> India.<br />
Year before<br />
Multiply<strong>in</strong>g factor<br />
One 1.10<br />
Two 1.21<br />
Three 1.33<br />
Four 1.46<br />
Five 1.61<br />
Applicant should <strong>in</strong>dicate actual figures <strong>of</strong> costs and amount for <strong>the</strong> works executed by <strong>the</strong>m without<br />
account<strong>in</strong>g for <strong>the</strong> above mentioned factors.<br />
In case <strong>the</strong> f<strong>in</strong>ancial figures and value <strong>of</strong> completed works are <strong>in</strong> foreign currency, <strong>the</strong> above enhance<br />
multiply<strong>in</strong>g factors will not be applied. Instead, current market exchange rate (State Bank <strong>of</strong> India BC sell<strong>in</strong>g<br />
rate as on <strong>the</strong> last date <strong>of</strong> submission <strong>of</strong> <strong>the</strong> bid) will be applied for <strong>the</strong> purpose <strong>of</strong> conversion <strong>of</strong> amount <strong>in</strong><br />
foreign currency <strong>in</strong> to Indian rupees.<br />
4.5.2 General Experience<br />
The Applicant shall meet <strong>the</strong> follow<strong>in</strong>g m<strong>in</strong>imum criteria:<br />
(a)<br />
(b)<br />
Average annual turnover (def<strong>in</strong>ed as bill<strong>in</strong>g for works <strong>in</strong> progress and completed <strong>in</strong> all classes <strong>of</strong> civil<br />
<strong>eng<strong>in</strong>eer</strong><strong>in</strong>g construction works only) over <strong>the</strong> last five years (i.e. 2007-08, 2008-09, 2009-10<br />
2010-11 & 2011-12) <strong>of</strong> 40 percent <strong>of</strong> <strong>the</strong> value <strong>of</strong> contract/contracts<br />
applied for.<br />
Experience <strong>in</strong> successfully complet<strong>in</strong>g or substantially complet<strong>in</strong>g at least one contract <strong>of</strong> highway<br />
(road and/or bridge works)/airport runway <strong>of</strong> at least 40 percent <strong>of</strong> <strong>the</strong> value <strong>of</strong> proposed contract with<strong>in</strong><br />
<strong>the</strong> last five years.<br />
The work may have been executed by <strong>the</strong> Applicant as prime contractor or as a member <strong>of</strong> jo<strong>in</strong>t<br />
venture. or sub contractor. As sub contractor, he should have acquired <strong>the</strong> experience <strong>of</strong> execution <strong>of</strong> all<br />
major items <strong>of</strong> works under <strong>the</strong> proposed contract. In case a <strong>project</strong> has been executed by a jo<strong>in</strong>t<br />
venture, weightage towards experience <strong>of</strong> <strong>the</strong> <strong>project</strong> would be given to each jo<strong>in</strong>t venture <strong>in</strong> proportion<br />
to <strong>the</strong>ir participation <strong>of</strong> <strong>the</strong> jo<strong>in</strong>t venture.<br />
Substantially completed work means those works which are at least 90% completed as on date <strong>of</strong><br />
submission (i.e. gross value <strong>of</strong> work done up to <strong>the</strong> last date <strong>of</strong> submission is 90% or more <strong>of</strong> <strong>the</strong><br />
orig<strong>in</strong>al contract price) and cont<strong>in</strong>u<strong>in</strong>g satisfactorily.<br />
For <strong>the</strong>se, a Certificate from <strong>the</strong> employer shall be submitted along with <strong>the</strong> application <strong>in</strong>corporat<strong>in</strong>g<br />
clearly <strong>the</strong> name <strong>of</strong> <strong>the</strong> work, Contract value, bill<strong>in</strong>g amount, date <strong>of</strong> commencement <strong>of</strong> works,<br />
satisfactory performance <strong>of</strong> <strong>the</strong> contractor any o<strong>the</strong>r relevant <strong>in</strong>formation.<br />
4.5.3 Personnel Capabilities<br />
The applicant must have suitably qualified personnel to fill <strong>the</strong> follow<strong>in</strong>g positions. The applicant will<br />
supply <strong>in</strong>formation on a prime candidate and an alternate for each position, both <strong>of</strong> whom should meet <strong>the</strong><br />
experience requirements specified below:<br />
S.<br />
No.<br />
Position<br />
(1) Project Manager<br />
(2) O<strong>the</strong>r positions<br />
Total experience<br />
(Years)<br />
In similar works<br />
(years)<br />
As manager <strong>of</strong><br />
similar works<br />
(Years)<br />
M<strong>in</strong>imum requirement for qualification given at Annexure-I