21.11.2014 Views

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

85<br />

SL<br />

NO<br />

Loc In Km A/U L<strong>in</strong>e<br />

Dra<strong>in</strong><br />

Kerb<br />

and<br />

Channel<br />

Type<br />

LOCATION STATEMENT OF PROPOSED R/WALL, B/WALL AND T/WALL<br />

Plum<br />

Conc<br />

Protection<br />

wall at<br />

river bed<br />

S/R/<br />

Wall<br />

From To Mtr 6m 3m (In<br />

2 steps)<br />

RCC R/Wall<br />

R/ Wall<br />

<strong>in</strong><br />

P/Conc<br />

T/Wall<br />

<strong>in</strong> P/Conc<br />

B/Wall <strong>in</strong> plum concrete<br />

5m 6m 8m 2m 1.5m 2m 2m 3m 4m 6m <strong>in</strong><br />

2<br />

steps<br />

1 69.900 mtr 150 150<br />

2 69.900 70.000 mtr 100 72 48 48<br />

3 70.075 70.150 mtr 100 48<br />

4 70.200 70.225 mtr 16<br />

5 70.225 70.350 mtr 72<br />

6 70.350 70.450 mtr 32 32<br />

7 70.460 mtr<br />

8 70.465 70.500 mtr 32<br />

9 70.500 70.800 mtr 300<br />

10 70.800 70.850 mtr 48 32<br />

11 70.875 70.900 mtr 24<br />

12 71.038 mtr<br />

13 71.100 71.125 mtr 24 24<br />

14 71.150 71.175 mtr 24 24<br />

15 71.300 71.325 mtr 24<br />

16 71.325 71.425 mtr 100<br />

17 71.425 71.550 mtr 80<br />

18 71.550 71.675 mtr 125<br />

19 71.680 71.780 mtr 100<br />

20 71.800 71.925 mtr 1900 125<br />

21 69.900 72.075 mtr 2,100 150 150 24 72 72 72 - 80 80 144 862 48<br />

22 69.900 Repell<strong>in</strong>g spur <strong>of</strong> size 15mx 1m as per draw<strong>in</strong>g<br />

Remark<br />

s

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!