office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
85<br />
SL<br />
NO<br />
Loc In Km A/U L<strong>in</strong>e<br />
Dra<strong>in</strong><br />
Kerb<br />
and<br />
Channel<br />
Type<br />
LOCATION STATEMENT OF PROPOSED R/WALL, B/WALL AND T/WALL<br />
Plum<br />
Conc<br />
Protection<br />
wall at<br />
river bed<br />
S/R/<br />
Wall<br />
From To Mtr 6m 3m (In<br />
2 steps)<br />
RCC R/Wall<br />
R/ Wall<br />
<strong>in</strong><br />
P/Conc<br />
T/Wall<br />
<strong>in</strong> P/Conc<br />
B/Wall <strong>in</strong> plum concrete<br />
5m 6m 8m 2m 1.5m 2m 2m 3m 4m 6m <strong>in</strong><br />
2<br />
steps<br />
1 69.900 mtr 150 150<br />
2 69.900 70.000 mtr 100 72 48 48<br />
3 70.075 70.150 mtr 100 48<br />
4 70.200 70.225 mtr 16<br />
5 70.225 70.350 mtr 72<br />
6 70.350 70.450 mtr 32 32<br />
7 70.460 mtr<br />
8 70.465 70.500 mtr 32<br />
9 70.500 70.800 mtr 300<br />
10 70.800 70.850 mtr 48 32<br />
11 70.875 70.900 mtr 24<br />
12 71.038 mtr<br />
13 71.100 71.125 mtr 24 24<br />
14 71.150 71.175 mtr 24 24<br />
15 71.300 71.325 mtr 24<br />
16 71.325 71.425 mtr 100<br />
17 71.425 71.550 mtr 80<br />
18 71.550 71.675 mtr 125<br />
19 71.680 71.780 mtr 100<br />
20 71.800 71.925 mtr 1900 125<br />
21 69.900 72.075 mtr 2,100 150 150 24 72 72 72 - 80 80 144 862 48<br />
22 69.900 Repell<strong>in</strong>g spur <strong>of</strong> size 15mx 1m as per draw<strong>in</strong>g<br />
Remark<br />
s