office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
8<br />
4.3 If <strong>the</strong> Employer has not undertaken pre-qualification <strong>of</strong> potential bidders, all bidders shall <strong>in</strong>clude <strong>the</strong><br />
follow<strong>in</strong>g <strong>in</strong>formation and documents with <strong>the</strong>ir bids <strong>in</strong> Section 2.<br />
(a)<br />
(b)<br />
(c)<br />
(d)<br />
(e)<br />
(f)<br />
(g)<br />
(h)<br />
(i)<br />
(j)<br />
(k)<br />
(l)<br />
Copies <strong>of</strong> orig<strong>in</strong>al documents def<strong>in</strong><strong>in</strong>g <strong>the</strong> constitution <strong>of</strong> legal status, place <strong>of</strong> registration, and<br />
pr<strong>in</strong>cipal place <strong>of</strong> bus<strong>in</strong>ess; written power <strong>of</strong> attorney <strong>of</strong> <strong>the</strong> signatory <strong>of</strong> <strong>the</strong> Bid to commit <strong>the</strong><br />
Bidder.<br />
Total monetary value <strong>of</strong> construction work performed for each <strong>of</strong> <strong>the</strong> last five years.<br />
Experience <strong>in</strong> works <strong>of</strong> a similar nature and size for each <strong>of</strong> <strong>the</strong> last five years, and details <strong>of</strong> works<br />
underway or contractually committed; and clients who may be contacted for fur<strong>the</strong>r <strong>in</strong>formation on<br />
those contracts;<br />
Major items <strong>of</strong> construction equipment proposed to carry out <strong>the</strong> Contract.<br />
Qualifications and experience <strong>of</strong> key site management and tech<strong>nic</strong>al personnel proposed for Contract.<br />
Reports on <strong>the</strong> f<strong>in</strong>ancial stand<strong>in</strong>g <strong>of</strong> <strong>the</strong> Bidder, such as pr<strong>of</strong>it and loss statements and auditor’s report<br />
for <strong>the</strong> past five years;<br />
Evidence <strong>of</strong> access to l<strong>in</strong>e (s) <strong>of</strong> credit and availability <strong>of</strong> o<strong>the</strong>r f<strong>in</strong>ancial resources facilities (10% <strong>of</strong><br />
contract value), certified by <strong>the</strong> Bankers (not more than 3 months old).<br />
Undertak<strong>in</strong>g that <strong>the</strong> bidder will be able to <strong>in</strong>vest a m<strong>in</strong>imum cash up to 25% <strong>of</strong> contract value <strong>of</strong><br />
work, dur<strong>in</strong>g implementation <strong>of</strong> work.<br />
Authority to seek references from <strong>the</strong> Bidder’s bankers;<br />
Information regard<strong>in</strong>g any litigation, current or dur<strong>in</strong>g <strong>the</strong> last five years, <strong>in</strong> which <strong>the</strong> Bidder is<br />
<strong>in</strong>volved, <strong>the</strong> parties concerned, and disputed amount.<br />
Proposals for subcontract<strong>in</strong>g components <strong>of</strong> <strong>the</strong> Works amount<strong>in</strong>g to more than 10 percent <strong>of</strong> <strong>the</strong> Bid<br />
price (for each, <strong>the</strong> qualifications and experience <strong>of</strong> <strong>the</strong> identified sub-contractor <strong>in</strong> <strong>the</strong> relevant field<br />
should be annexed); and<br />
The proposed methodology and programme <strong>of</strong> construction, backed with equipment plann<strong>in</strong>g and<br />
deployment, duly supported with broad calculations and quality control procedures proposed to be<br />
adopted, justify<strong>in</strong>g <strong>the</strong>ir capability <strong>of</strong> execution and completion <strong>of</strong> <strong>the</strong> work as per tech<strong>nic</strong>al<br />
specifications with<strong>in</strong> <strong>the</strong> stipulated period <strong>of</strong> completion as per milestones.<br />
4.4 Bid from Jo<strong>in</strong>t Ventures are not acceptable.<br />
4.5 Qualification criteria. Qualification will be based on Applicant’s meet<strong>in</strong>g all <strong>the</strong> follow<strong>in</strong>g m<strong>in</strong>imum<br />
pass/fail criteria regard<strong>in</strong>g <strong>the</strong> Applicant’s general and particular experience, personnel and equipment<br />
capabilities, and f<strong>in</strong>ancial position, as demonstrated by <strong>the</strong> Applicant’s responses <strong>in</strong> <strong>the</strong> forms attached to <strong>the</strong><br />
letter <strong>of</strong> Application (specified requirements for jo<strong>in</strong>t ventures are given under clause 4.6 below).<br />
Subcontractors‟ experience and resources shall not be taken <strong>in</strong>to account <strong>in</strong> determ<strong>in</strong><strong>in</strong>g <strong>the</strong> Applicant’s<br />
compliance with <strong>the</strong> qualify<strong>in</strong>g criteria.<br />
To qualify for more than one contract, <strong>the</strong> applicant must demonstrate hav<strong>in</strong>g experience and resources<br />
sufficient to meet <strong>the</strong> aggregate <strong>of</strong> <strong>the</strong> qualification criteria for each contract given <strong>in</strong> paragraphs 4.5.3, 4.5.4,<br />
4.5.5 and 4.5.8 below.<br />
4.5.1 Base year and escalation<br />
The base year shall be taken as 2012