62<br />
Items marked “NA” do not apply <strong>in</strong> this Contract.<br />
CONTRACT DATA<br />
Clause reference<br />
With respect To<br />
Section 3<br />
1 The Employer is [Cl. 1.1]<br />
Name: Chief Eng<strong>in</strong>eer Project Swastik , Burtuk, Gangtok, Sikkim<br />
Address: The Chief Eng<strong>in</strong>eer, HQ CE (P) SWASTIK, PIN 931717 C/O <strong>99</strong> APO<br />
Name <strong>of</strong> authorized Representative (will be <strong>in</strong>timated later)<br />
Commander 764 BRTF will make payment to contractor on behalf <strong>of</strong> <strong>the</strong> Employer<br />
2 The Eng<strong>in</strong>eer is OC, 87 RCC (GREF), C/O <strong>99</strong> APO, Melli (Km 34 on Sevoke Gangtok road),<br />
West Bengal.<br />
Name <strong>of</strong> authorized Representative: To be nom<strong>in</strong>ated by Eng<strong>in</strong>eer<br />
3 The Dispute Review Expert appo<strong>in</strong>ted jo<strong>in</strong>tly by <strong>the</strong> Employer and Contractor is [Cl. 1.1]<br />
*Name: will be decided before acceptance <strong>of</strong> contract.<br />
*Address: NA<br />
4 The Defects Liability Period is 03 Years from <strong>the</strong> date <strong>of</strong> completion. (MORT&H letter No.<br />
RW/NH-12014/5/2010/SP(MP/P-9 dated 04/11/2010)<br />
[Cl.1.1 & 35]<br />
5 The start date shall be 20 days from <strong>the</strong> date <strong>of</strong> issue <strong>of</strong> <strong>the</strong> Notice to proceed with <strong>the</strong> work. [Cl. 1.1]<br />
6 The Intended Completion Date for <strong>the</strong> whole <strong>of</strong> <strong>the</strong> Works is 12 (Twelve) Months after start<br />
<strong>of</strong> work with <strong>the</strong> follow<strong>in</strong>g milestone.<br />
[Cl.1.1.17 & 28]<br />
Milestone dates: [Cl. 2.2 & 49.1]<br />
Physical works to be completed<br />
Milestone 1 i.e. 30% <strong>of</strong> <strong>the</strong> work<br />
Milestone 2 i.e. 65 % <strong>of</strong> <strong>the</strong> work<br />
Milestone 3 i.e. 100 % <strong>of</strong> <strong>the</strong> work<br />
Period from <strong>the</strong> start date<br />
4 (four ) months<br />
8 (eight) months<br />
12 (Twelve) months<br />
7 The site is located between from km 69.900 to km 72.075 <strong>of</strong> road Sevoke Gangtok (NH-31A) <strong>in</strong><br />
Sikkim State<br />
8 The name and identification number <strong>of</strong> <strong>the</strong> Contract is; Widen<strong>in</strong>g and streng<strong>the</strong>n<strong>in</strong>g <strong>of</strong> road<br />
from km 69.900 to km 72.075 <strong>of</strong> NH-31A to NH double lane specifications under Phase „A‟<br />
<strong>of</strong> SARDP –NE under 764 BRTF Project Swastik <strong>in</strong> <strong>the</strong> state <strong>of</strong> Sikkim (2 nd Call). Package<br />
No. SARDP-NE/ NH-31A/SK/BRO/2011-12/204<br />
9 The works consist <strong>of</strong> Clear<strong>in</strong>g & grubb<strong>in</strong>g road, excavation <strong>of</strong> roadway <strong>in</strong> Soil Mixed with<br />
Boulder (SMB), S<strong>of</strong>t Rock (SR) & Hard Rock (HR), Permanent Works <strong>in</strong>clud<strong>in</strong>g River tra<strong>in</strong><strong>in</strong>g<br />
works , scarify<strong>in</strong>g exist<strong>in</strong>g BT surface, GSB, WMM, DBM, BC, Prime coat, Tack coat, berm<br />
fill<strong>in</strong>g & road mark<strong>in</strong>g fix<strong>in</strong>g <strong>of</strong> km stone, road furniture etc . The works shall,<br />
<strong>in</strong>terallia, <strong>in</strong>clude <strong>the</strong> items specified <strong>in</strong> Bill <strong>of</strong> Quantities, as specified or as directed:<br />
Any o<strong>the</strong>r items as required to fulfill all contractual obligations as per <strong>the</strong> Bid documents.<br />
(Cl.1.1)<br />
(Cl.1.1)<br />
[Cl. 1.1]<br />
[Cl. 1.1]<br />
10 The documents <strong>of</strong> Sl No. (1) to (8) <strong>of</strong> Cl.2.3 also form part <strong>of</strong> <strong>the</strong> contract [Cl.2.3]