21.11.2014 Views

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

59<br />

36. Slides: If slips, slides, over-breaks or subsidence occur <strong>in</strong> cutt<strong>in</strong>gs dur<strong>in</strong>g <strong>the</strong> process <strong>of</strong> construction, <strong>the</strong>y shall<br />

be removed at <strong>the</strong> cost <strong>of</strong> <strong>the</strong> Contractor as ordered by <strong>the</strong> Eng<strong>in</strong>eer-<strong>in</strong>-Charge/OC Contract. Adequate precautions<br />

shall be taken to ensure that dur<strong>in</strong>g construction, <strong>the</strong> slopes are not rendered unstable or give rise to recurrent slides<br />

after construction. If f<strong>in</strong>ished slopes slide <strong>in</strong>to <strong>the</strong> roadway subsequently, such slides shall be removed and paid for at<br />

<strong>the</strong> Contract rate for <strong>the</strong> class <strong>of</strong> excavation <strong>in</strong>volved, provided <strong>the</strong> slides are not due to any negligence on <strong>the</strong> part <strong>of</strong><br />

<strong>the</strong> Contractor. The classification <strong>of</strong> <strong>the</strong> debris material from <strong>the</strong> slips, slides etc. shall conform to its condition at <strong>the</strong><br />

time <strong>of</strong> removal and payment made accord<strong>in</strong>gly regardless <strong>of</strong> its condition earlier.<br />

37. Salient Features Of Proposed Road Sector<br />

S/No Item <strong>of</strong> work Proposed status<br />

1. Road land width 24 Mtr<br />

2. Formation width 12 Mtr<br />

3. Paved width (carriage way) 7 Mtr<br />

4. Shoulder Ear<strong>the</strong>n both side<br />

5. Gradient<br />

(a) Rul<strong>in</strong>g 1 <strong>in</strong> 20<br />

(b) Limit<strong>in</strong>g 1 <strong>in</strong> 16.7<br />

(c) Exceptional 1 <strong>in</strong> 14.3<br />

6. Radius <strong>of</strong> curve rul<strong>in</strong>g 30 Mtr<br />

7. Road Geometric<br />

(a) Parapet wall<br />

0.6 Mtr<br />

(b) Side dra<strong>in</strong><br />

0.6 Mtr<br />

(c) Super elevation 7%<br />

(d) Camber 1.7 to 2%<br />

38. IRC specification will take precedence <strong>in</strong> case <strong>of</strong> variation with specification given <strong>in</strong> Bid document.<br />

39. Jo<strong>in</strong>t survey:<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

Before commencement <strong>of</strong> <strong>the</strong> work, <strong>the</strong> contractor along with <strong>the</strong> rep <strong>of</strong> department/Eng<strong>in</strong>eer/ rep <strong>of</strong><br />

Eng<strong>in</strong>eer , shall carryout detailed jo<strong>in</strong>t survey with total station.<br />

Required L and X section <strong>of</strong> <strong>the</strong> road pr<strong>of</strong>ile at an <strong>in</strong>terval <strong>of</strong> 20 mtrs be verified. Changes if any be<br />

<strong>in</strong>corporated <strong>in</strong> <strong>the</strong> X-sectional draw<strong>in</strong>g provided with tender documents. Details <strong>of</strong> fresh section be<br />

<strong>in</strong>timated duly signed by rep <strong>of</strong> contractor and Eng<strong>in</strong>eer to TF Commander and Employer .<br />

After completion <strong>of</strong> formation cutt<strong>in</strong>g work, jo<strong>in</strong>t survey to be carried out with <strong>the</strong> help <strong>of</strong> Total<br />

Station. L and X section will be prepared at <strong>in</strong>terval <strong>of</strong> 20 mtrs.<br />

Volume <strong>of</strong> earth work to be computed with <strong>the</strong> help <strong>of</strong> survey details obta<strong>in</strong>ed before commencement<br />

and after completion <strong>of</strong> work.<br />

Records <strong>of</strong> <strong>the</strong> above survey details duly signed by rep <strong>of</strong> contractor, Eng<strong>in</strong>eer-<strong>in</strong>-Charge and OC<br />

Contract be ma<strong>in</strong>ta<strong>in</strong>ed by <strong>the</strong> contractor and copy <strong>of</strong> same be forwarded to OC Contract and<br />

Commander TF.<br />

Contractor must furnish <strong>the</strong> details <strong>of</strong> survey for release <strong>of</strong> RAR perta<strong>in</strong><strong>in</strong>g to earth work.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!