54 (e) (f) The decision of the majority of Arbitrators shall be final and binding upon both parties. The cost and expenses of Arbitration proceedings will be paid as determined by the arbitral tribunal. However, the expenses incurred by each party in connection with the preparation, presentation, etc. of its proceedings as also the fees and expenses paid to the arbitrator appointed by such party or on its behalf shall be borne by each party itself. Performance under the contract shall continue during the arbitration proceedings and payments due to the contractor by the owners shall not be withheld, unless they are the subject matter of the arbitration Proceedings. 4. INSPECTION AND PLANTS AND ALLIED MACHINERY: The plant and allied machinery required for execution work of mainly DBM, BC, WMM, etc. shall be inspected/examined by the technical committee constituted by the Ministry vide their letter No. RW/24011/1/2002- Mech dtd. 04.12.01 & 28.02.02, to obtain their clearance before commencement of the work.

55 G. ADDITIONAL SPECIAL CONDITIONS 1(A) In addition to definition mentioned in General Condition of Contract under clause 1, following definitions will also be used in this contract:- a) Chief Engineer and Employer are synonymous and have same connotation in respect of this contract. b) Commander is person holding the appointment of Commander 764 BRTF or in his absence, a person officiating as Commander 764 BRTF. The word Commander, Commander Task Force and Commander Work Engineer (CWE) are synonymous of contract and have same connotation in respect of this contract. c) Engineer In Charge is a person appointed by the Engineer to act his authorized representative in terms of clause 5.1 of conditions of Contract and item No. 2 of Contract Data. Engineer In Charge will report to Engineer, will perform the duties and exercise the power to the extent delegated to him by the Engineer and receive instructions from Engineer for day to day performance of his duties. d) Officer Commanding Contract (OC Contract in short) and Engineer are synonymous of contract and have same connotation in respect of this contract. 1(B) In order to ensure submission of the work programme and approval of the same by the department before commencement of the work the following target dates are fixed for the related activities for compliance by all concerned: a) The contractor after receiving the Letter of Acceptance shall furnish the work programme to the Engineer within 14 (fourteen) days from the date of issue of the Letter of Acceptance. b) OC Contract in turn shall forward the same after necessary scrutiny to the Commander for onward transmission to the Chief Engineer within 21 (twenty one) days from the date of issue of Letter of Acceptance. The work program should be based upon MS Project. c) The signing of the contract agreement will be subject to the acceptance of the work programme by the Chief Engineer. d) On matters where decision of Employer is required, Engineer will initiate the case through Commander. 2. Deleted 3. The grade of bitumen for the various types of bituminous works course should be as follows a) Dense Bituminous Macadam - Paving Bitumen grade VG 10/ Penetration Grade 80/100 (IS:73) b) Bituminous Concrete - Polymer Modified Bitumen -70 (Electrometric / Plastomeric)/CRMB 55 c) Prime Coat - With bitumen emulsion-CSS-1h(IS-8887-2004) d) Tack Coat - With bitumen emulsion-CSS-1h (IS-8887-2004) 4. The Hot Mix Plant should be set up within a linear distance of 20 to 30 km from the work site, as per IRC SP: 24. 5. The record of quality control test carried out in conformity with the Section No.900 of MORT&H specification for roads & bridges and authenticated by the Engineer - In - Charge shall be submitted to the OC Contract with every works bill and secured advance bill. The OC Contract will forward no bill without these test records. 6. Deleted 7. Deleted 8. All testing for Bituminous Products must be carried from either of the following Laboratories/ Institutions: a) I.I.T Guwahati b) Road Research Laboratory, PWD, Guwahati c) Jalpaiguri Govt Engineering College. Jalpaiguri d) SMIT,Sikkim The sample from which the testing has to be conducted shall be decided by the OC Contract/ Engineer-in - Charge 9. The following quality control equipments for field laboratory are to be kept at site for quality control tests. A) For Earthwork:- i) Moisture Meter with chemicals ii) Apparatus for measuring Dry density by sand replacement method iii) Apparatus for measuring Dry density by core cutter method iv) Oven,electrically operated and thermostatically controlled upto 200 0 C & 300 0 C (sensitivity1 0 C) v) Electronic balance of 200gm capacity 0.01gm accuracy. vi) Madras Sand

55<br />

G. ADDITIONAL SPECIAL CONDITIONS<br />

1(A) In addition to def<strong>in</strong>ition mentioned <strong>in</strong> General Condition <strong>of</strong> Contract under clause 1, follow<strong>in</strong>g def<strong>in</strong>itions will<br />

also be used <strong>in</strong> this contract:-<br />

a) Chief Eng<strong>in</strong>eer and Employer are synonymous and have same connotation <strong>in</strong> respect <strong>of</strong> this contract.<br />

b) Commander is person hold<strong>in</strong>g <strong>the</strong> appo<strong>in</strong>tment <strong>of</strong> Commander 764 BRTF or <strong>in</strong> his absence, a person<br />

<strong>of</strong>ficiat<strong>in</strong>g as Commander 764 BRTF. The word Commander, Commander Task Force and Commander Work<br />

Eng<strong>in</strong>eer (CWE) are synonymous <strong>of</strong> contract and have same connotation <strong>in</strong> respect <strong>of</strong> this contract.<br />

c) Eng<strong>in</strong>eer In Charge is a person appo<strong>in</strong>ted by <strong>the</strong> Eng<strong>in</strong>eer to act his authorized representative <strong>in</strong> terms <strong>of</strong><br />

clause 5.1 <strong>of</strong> conditions <strong>of</strong> Contract and item No. 2 <strong>of</strong> Contract Data. Eng<strong>in</strong>eer In Charge will report to Eng<strong>in</strong>eer,<br />

will perform <strong>the</strong> duties and exercise <strong>the</strong> power to <strong>the</strong> extent delegated to him by <strong>the</strong> Eng<strong>in</strong>eer and receive<br />

<strong>in</strong>structions from Eng<strong>in</strong>eer for day to day performance <strong>of</strong> his duties.<br />

d) Officer Command<strong>in</strong>g Contract (OC Contract <strong>in</strong> short) and Eng<strong>in</strong>eer are synonymous <strong>of</strong><br />

contract and have same connotation <strong>in</strong> respect <strong>of</strong> this contract.<br />

1(B) In order to ensure submission <strong>of</strong> <strong>the</strong> work programme and approval <strong>of</strong> <strong>the</strong> same by <strong>the</strong> department before<br />

commencement <strong>of</strong> <strong>the</strong> work <strong>the</strong> follow<strong>in</strong>g target dates are fixed for <strong>the</strong> related activities for compliance by all<br />

concerned:<br />

a) The contractor after receiv<strong>in</strong>g <strong>the</strong> Letter <strong>of</strong> Acceptance shall furnish <strong>the</strong> work programme to <strong>the</strong> Eng<strong>in</strong>eer<br />

with<strong>in</strong> 14 (fourteen) days from <strong>the</strong> date <strong>of</strong> issue <strong>of</strong> <strong>the</strong> Letter <strong>of</strong> Acceptance.<br />

b) OC Contract <strong>in</strong> turn shall forward <strong>the</strong> same after necessary scrut<strong>in</strong>y to <strong>the</strong> Commander for onward transmission<br />

to <strong>the</strong> Chief Eng<strong>in</strong>eer with<strong>in</strong> 21 (twenty one) days from <strong>the</strong> date <strong>of</strong> issue <strong>of</strong> Letter <strong>of</strong> Acceptance. The work<br />

program should be based upon MS Project.<br />

c) The sign<strong>in</strong>g <strong>of</strong> <strong>the</strong> contract agreement will be subject to <strong>the</strong> acceptance <strong>of</strong> <strong>the</strong> work programme by <strong>the</strong> Chief<br />

Eng<strong>in</strong>eer.<br />

d) On matters where decision <strong>of</strong> Employer is required, Eng<strong>in</strong>eer will <strong>in</strong>itiate <strong>the</strong> case through Commander.<br />

2. Deleted<br />

3. The grade <strong>of</strong> bitumen for <strong>the</strong> various types <strong>of</strong> bitum<strong>in</strong>ous works course should be as follows<br />

a) Dense Bitum<strong>in</strong>ous Macadam - Pav<strong>in</strong>g Bitumen grade VG 10/ Penetration Grade 80/100 (IS:73)<br />

b) Bitum<strong>in</strong>ous Concrete - Polymer Modified Bitumen -70 (Electrometric / Plastomeric)/CRMB 55<br />

c) Prime Coat - With bitumen emulsion-CSS-1h(IS-8887-2004)<br />

d) Tack Coat - With bitumen emulsion-CSS-1h (IS-8887-2004)<br />

4. The Hot Mix Plant should be set up with<strong>in</strong> a l<strong>in</strong>ear distance <strong>of</strong> 20 to 30 km from <strong>the</strong> work site, as per IRC<br />

SP: 24.<br />

5. The record <strong>of</strong> quality control test carried out <strong>in</strong> conformity with <strong>the</strong> Section No.900 <strong>of</strong> MORT&H<br />

specification for roads & bridges and au<strong>the</strong>nticated by <strong>the</strong> Eng<strong>in</strong>eer - In - Charge shall be submitted to <strong>the</strong> OC<br />

Contract with every works bill and secured advance bill. The OC Contract will forward no bill without <strong>the</strong>se test<br />

records.<br />

6. Deleted<br />

7. Deleted<br />

8. All test<strong>in</strong>g for Bitum<strong>in</strong>ous Products must be carried from ei<strong>the</strong>r <strong>of</strong> <strong>the</strong> follow<strong>in</strong>g Laboratories/ Institutions:<br />

a) I.I.T Guwahati<br />

b) Road Research Laboratory, PWD, Guwahati<br />

c) Jalpaiguri Govt Eng<strong>in</strong>eer<strong>in</strong>g College. Jalpaiguri<br />

d) SMIT,Sikkim<br />

The sample from which <strong>the</strong> test<strong>in</strong>g has to be conducted shall be decided by <strong>the</strong> OC Contract/ Eng<strong>in</strong>eer-<strong>in</strong> -<br />

Charge<br />

9. The follow<strong>in</strong>g quality control equipments for field laboratory are to be kept at site for quality control tests.<br />

A) For Earthwork:-<br />

i) Moisture Meter with chemicals<br />

ii) Apparatus for measur<strong>in</strong>g Dry density by sand replacement method<br />

iii) Apparatus for measur<strong>in</strong>g Dry density by core cutter method<br />

iv) Oven,electrically operated and <strong>the</strong>rmostatically controlled upto 200 0 C & 300 0 C (sensitivity1 0 C)<br />

v) Electro<strong>nic</strong> balance <strong>of</strong> 200gm capacity 0.01gm accuracy.<br />

vi) Madras Sand