21.11.2014 Views

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

office of the chief engineer, project swastik, c/o 99 apo ... - Bro.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

48<br />

Note:- The price adjustment benefit calculated as per <strong>the</strong> stipulations at 47.1 for <strong>the</strong> first 12 months will be<br />

deducted from <strong>the</strong> total price adjustment benefits for <strong>the</strong> work reckoned from <strong>the</strong> start <strong>of</strong> <strong>the</strong> work till<br />

completion for contracts hav<strong>in</strong>g completion period more than 12 months.<br />

47.2 To <strong>the</strong> extent that full compensation for any rise or fall <strong>in</strong> costs to <strong>the</strong> contractor is not covered by <strong>the</strong><br />

provisions <strong>of</strong> this or o<strong>the</strong>r clauses <strong>in</strong> <strong>the</strong> contract, <strong>the</strong> unit rates and prices <strong>in</strong>cluded <strong>in</strong> <strong>the</strong> contract shall be deemed to<br />

<strong>in</strong>clude amounts to cover <strong>the</strong> cont<strong>in</strong>gency <strong>of</strong> such o<strong>the</strong>r rise or fall <strong>in</strong> costs.<br />

48. Retention.<br />

48.1 The employer shall reta<strong>in</strong> from each payment due to <strong>the</strong> Contractor <strong>the</strong> proportion stated <strong>in</strong> <strong>the</strong> Contract Data<br />

until Completion <strong>of</strong> <strong>the</strong> whole <strong>of</strong> <strong>the</strong> Works.<br />

48.2 On completion <strong>of</strong> <strong>the</strong> whole <strong>of</strong> <strong>the</strong> works half <strong>the</strong> total amount reta<strong>in</strong>ed is repaid to <strong>the</strong> Contractor and half<br />

when <strong>the</strong> Defects Liability Period has passed and <strong>the</strong> Eng<strong>in</strong>eer has certified that all Defects notified by <strong>the</strong> Eng<strong>in</strong>eer to<br />

<strong>the</strong> Contractor before <strong>the</strong> end <strong>of</strong> this period have been corrected.<br />

48.3 On completion <strong>of</strong> <strong>the</strong> whole works, <strong>the</strong> contractor may substitute retention money with an “on demand” Bank<br />

Guarantee.<br />

49. Liquidated Damages<br />

49.1 The Contractor shall pay liquidated damages* to <strong>the</strong> Employer at <strong>the</strong> rate per day stated <strong>in</strong> Contract Data<br />

(for <strong>the</strong> whole <strong>of</strong> <strong>the</strong> works or <strong>the</strong> milestone as stated <strong>in</strong> <strong>the</strong> contract data). The total amount <strong>of</strong> liquidated damages<br />

shall not exceed <strong>the</strong> amount def<strong>in</strong>ed <strong>in</strong> <strong>the</strong> Contract Data. The Employer may deduct liquidated damages from<br />

payments due to <strong>the</strong> Contractor. Payment <strong>of</strong> liquidated damages does not affect <strong>the</strong> Contractor’s liabilities.<br />

* For each day that <strong>the</strong> completion date is later than <strong>the</strong> <strong>in</strong>tended completion date.<br />

49.2 If <strong>the</strong> Intended Completion Date is extended after liquidated damages have been paid, <strong>the</strong> Eng<strong>in</strong>eer shall<br />

correct any overpayment <strong>of</strong> liquidated damages by <strong>the</strong> contractor by adjust<strong>in</strong>g <strong>the</strong> next payment certificate. The<br />

Contractor shall be paid <strong>in</strong>terest on <strong>the</strong> over payment calculated from <strong>the</strong> date <strong>of</strong> payment <strong>of</strong> repayment at <strong>the</strong> rate<br />

specified <strong>in</strong> Sub-Clause 43.1.<br />

49.3 If <strong>the</strong> contractor fails to comply with <strong>the</strong> time for completion as stipulated <strong>in</strong> <strong>the</strong> tender, <strong>the</strong>n <strong>the</strong> contractor<br />

shall pay to <strong>the</strong> employer <strong>the</strong> relevant sum stated <strong>in</strong> <strong>the</strong> Contract Data as Liquidated damages for such default and not<br />

as penalty for every date or part <strong>of</strong> day which shall elapse between relevant time for completion and <strong>the</strong> date stated <strong>in</strong><br />

<strong>the</strong> tak<strong>in</strong>g over certificate <strong>of</strong> <strong>the</strong> whole <strong>of</strong> <strong>the</strong> works on <strong>the</strong> relevant section, subject to <strong>the</strong> limit stated <strong>in</strong> <strong>the</strong> Contract<br />

Data.<br />

The Employer may, without prejudice to any o<strong>the</strong>r method <strong>of</strong> recovery deduct <strong>the</strong> amount <strong>of</strong> such damages<br />

from any monies due or to become due to <strong>the</strong> contractor. The payment <strong>of</strong> deduction <strong>of</strong> such damages shall not relieve<br />

<strong>the</strong> contractor from his obligation to complete <strong>the</strong> work on from any o<strong>the</strong>r <strong>of</strong> his obligations and liabilities under <strong>the</strong><br />

contract.<br />

49.4 If, before <strong>the</strong> Time for completion <strong>of</strong> <strong>the</strong> whole <strong>of</strong> <strong>the</strong> works or, if applicable, any Section, a Tak<strong>in</strong>g-Over<br />

Certificate has been issued for any part <strong>of</strong> <strong>the</strong> Works or <strong>of</strong> a Section, <strong>the</strong> liquidated damages for delay <strong>in</strong> completion<br />

<strong>of</strong> <strong>the</strong> rema<strong>in</strong>der <strong>of</strong> <strong>the</strong> works or <strong>of</strong> that Section shall, for any period <strong>of</strong> delay after date stated <strong>in</strong> such Tak<strong>in</strong>g-Over<br />

Certificate, and <strong>in</strong> <strong>the</strong> absence <strong>of</strong> alternative provisions <strong>in</strong> <strong>the</strong> Contract, <strong>the</strong> reduced <strong>in</strong> <strong>the</strong> proportion which <strong>the</strong> value<br />

<strong>of</strong> <strong>the</strong> part so certified bears to <strong>the</strong> value <strong>of</strong> <strong>the</strong> whole <strong>of</strong> <strong>the</strong> Works or Section, as applicable. The provisions <strong>of</strong> this<br />

Sub-Clause shall only apply to <strong>the</strong> rate <strong>of</strong> liquidated damages and shall not affect <strong>the</strong> limit <strong>the</strong>re<strong>of</strong>.<br />

50. Bonus<br />

50.1 If <strong>the</strong> contractor achieves completion <strong>of</strong> <strong>the</strong> whole <strong>of</strong> <strong>the</strong> works prior to <strong>the</strong> Intended Completion Date prescribed <strong>in</strong><br />

Contract Data <strong>the</strong> Employer shall pay to <strong>the</strong> contractor a sum stated <strong>in</strong> Contract Data as bonus for every completed<br />

month which shall elapse between <strong>the</strong> data <strong>of</strong> completion <strong>of</strong> all items <strong>of</strong> works as stipulated <strong>in</strong> <strong>the</strong> contract, <strong>in</strong>clud<strong>in</strong>g<br />

variations ordered by <strong>the</strong> Eng<strong>in</strong>eer and <strong>the</strong> time prescribed <strong>in</strong> Clause 17.<br />

For <strong>the</strong> purpose <strong>of</strong> calculat<strong>in</strong>g bonus payments, <strong>the</strong> time given <strong>in</strong> <strong>the</strong> Bid for completion <strong>of</strong> <strong>the</strong> whose <strong>of</strong> <strong>the</strong> works is<br />

fixed and unless o<strong>the</strong>rwise agreed, no adjustments <strong>of</strong> <strong>the</strong> time by any reason <strong>of</strong> grant<strong>in</strong>g an extension <strong>of</strong> time pursuant to<br />

Clause 28 or any o<strong>the</strong>r clause <strong>of</strong> <strong>the</strong>se conditions will be allowed. Any prior fall<strong>in</strong>g short <strong>of</strong> a completed months shall<br />

be ignored for <strong>the</strong> purpose <strong>of</strong> comput<strong>in</strong>g <strong>the</strong> prior relevant for <strong>the</strong> payment <strong>of</strong> bonus.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!