List <strong>of</strong> Key Plant & Equipment to be deployed on Contract Work<br />
(Capacity & Numbers vary<strong>in</strong>g depend<strong>in</strong>g upon <strong>the</strong> different scope/provision)<br />
[Reference Cl. 4.5.4] (To be filled up as per requirement and construction programme)<br />
ANNEXURE-II<br />
Sl.<br />
No.<br />
Type <strong>of</strong> Equipment<br />
Maximum age<br />
As 01 Jun 2012<br />
(Years)<br />
M<strong>in</strong>imu<br />
m<br />
Requiremen<br />
t<br />
(<strong>in</strong><br />
Nos.)<br />
1 Dozer 05 1<br />
2 Mecha<strong>nic</strong>al <strong>Bro</strong>om Hydraulic 5 2<br />
3 Emulsion/Bitumen Pressure<br />
5 1<br />
distributor/sprayer<br />
4 Hot Mix Plant with Electro<strong>nic</strong><br />
Controls (M<strong>in</strong>imum 80 to 100 TPH<br />
capacity)<br />
5 1<br />
5 Paver F<strong>in</strong>isher with Electro<strong>nic</strong><br />
5 1<br />
Sensor<br />
6 Wet Mix Plant 5 1<br />
7 Paver F<strong>in</strong>isher for WMM Work 5 1<br />
8 Front end loader 5 1<br />
9 Tipper Trucks 5-7 1<br />
10 Smooth wheeled Roller 5 02<br />
11 Vibratory Roller 5 1<br />
12 Tendem Roller 5 1<br />
13 Water tanker 5 2<br />
14 Motor Grader 2 2<br />
15 Concrete Mixes with Integral Weigh<br />
Batch<strong>in</strong>g Facility<br />
5 1<br />
16 Centre l<strong>in</strong>e mark<strong>in</strong>g mach<strong>in</strong>e 5 1<br />
17 Hydraulic Excavator with rock breaker 5 2<br />
18 Excavator cum loader 5 1<br />
19 Needle vibrator 5 2<br />
Total 34<br />
M<strong>in</strong>imum Capacity