10<br />

4.5.4 Equipment Capabilities<br />

The Applicant should own or should have assured ownership to <strong>the</strong> follow<strong>in</strong>g key items <strong>of</strong> equipment,<br />

<strong>in</strong> full work<strong>in</strong>g order, and must demonstrate that, based on known commitments; <strong>the</strong>y will be available for use<br />

<strong>in</strong> <strong>the</strong> proposed contract.<br />

4.5.5 F<strong>in</strong>ancial Position<br />

S.No. Equipment type and characteristics M<strong>in</strong>imum number required<br />

(1)<br />

(2)<br />

(3)<br />

M<strong>in</strong>imum requirement for qualification given at Annexure-II<br />

The Applicant should demonstrate that he has access to, or has available, liquid assets (aggregate <strong>of</strong><br />

work<strong>in</strong>g capital, cash <strong>in</strong> hand and uncommitted bank guarantees) and/or credit facilities <strong>of</strong> not less than 10 per<br />

cent <strong>of</strong> <strong>the</strong> value <strong>of</strong> <strong>the</strong> contract/contracts applied for (construction cash-flow may be taken as 10 per cent <strong>of</strong> <strong>the</strong><br />

estimated value <strong>of</strong> contract/contracts).<br />

4.5.6 The audited balance sheets for <strong>the</strong> last five years should be submitted, which must demonstrate <strong>the</strong> soundness<br />

<strong>of</strong> <strong>the</strong> Applicant‟ s f<strong>in</strong>ancial position, show<strong>in</strong>g long-term pr<strong>of</strong>itability <strong>in</strong>clud<strong>in</strong>g as estimated f<strong>in</strong>ancial <strong>project</strong>ion<br />

for <strong>the</strong> next two years. If necessary, <strong>the</strong> Employer will make <strong>in</strong>quiries with <strong>the</strong> applicant‟ s bankers.<br />

4.5.7 Litigation History<br />

The Applicant should provide accurate <strong>in</strong>formation on any litigation or arbitration result<strong>in</strong>g from<br />

contracts completed or under execution by him over <strong>the</strong> last five years. A consistent history <strong>of</strong> awards aga<strong>in</strong>st<br />

<strong>the</strong> Applicant or any partner <strong>of</strong> a jo<strong>in</strong>t venture may result <strong>in</strong> failure <strong>of</strong> <strong>the</strong> applicant.<br />

4.5.8 Bid capacity<br />

Applicants who meet <strong>the</strong> m<strong>in</strong>imum qualification criteria will be qualified only if <strong>the</strong>ir available bid<br />

capacity is more than <strong>the</strong> estimated cost <strong>of</strong> <strong>the</strong> works. The available capacity will be calculated as under:<br />

Assessed available bid capacity = (A*N*2-B), Where<br />

A =<br />

B =<br />

N =<br />

Maximum value <strong>of</strong> civil <strong>eng<strong>in</strong>eer</strong><strong>in</strong>g works executed <strong>in</strong> any one year dur<strong>in</strong>g <strong>the</strong> last five years<br />

(updated to <strong>the</strong> price level <strong>of</strong> <strong>the</strong> year <strong>in</strong>dicated <strong>in</strong> Appx) tak<strong>in</strong>g <strong>in</strong>to account <strong>the</strong> completed as well as<br />

works <strong>in</strong> progress.<br />

Value (updated to <strong>the</strong> price level <strong>of</strong> <strong>the</strong> year <strong>in</strong>dicated <strong>in</strong> Appx) <strong>of</strong> <strong>the</strong> exist<strong>in</strong>g commitments and<br />

ongo<strong>in</strong>g works to be completed dur<strong>in</strong>g <strong>the</strong> next *12 months (*period <strong>of</strong> completion <strong>of</strong> work for which<br />

bids are <strong>in</strong>vited); and<br />

Number <strong>of</strong> years prescribed for completion <strong>of</strong> <strong>the</strong> works for which bids are <strong>in</strong>vited.<br />

Note: i) The statement show<strong>in</strong>g <strong>the</strong> value <strong>of</strong> exist<strong>in</strong>g commitments and on-go<strong>in</strong>g works as well as <strong>the</strong><br />

stipulated period <strong>of</strong> completion rema<strong>in</strong><strong>in</strong>g for each <strong>of</strong> <strong>the</strong> works listed should be countersigned by <strong>the</strong><br />

Eng<strong>in</strong>eer In Charge, not below <strong>the</strong> rank <strong>of</strong> an Executive Eng<strong>in</strong>eer or equivalent.<br />

4.5.9 Disqualification<br />

ii) In case <strong>of</strong> a Jo<strong>in</strong>t Venture, <strong>the</strong> available bid capacity will be applied for each partner to <strong>the</strong><br />

extent <strong>of</strong> his proposed participation <strong>in</strong> <strong>the</strong> execution <strong>of</strong> <strong>the</strong> works.<br />

Even though <strong>the</strong> Applicants meet <strong>the</strong> above criteria, <strong>the</strong>y are subject to be disqualified if <strong>the</strong>y have:<br />

- made mislead<strong>in</strong>g or false representations <strong>in</strong> <strong>the</strong> form, statements submitted; and/or