1. Lead Time (Before)<br />
Information Machining Washing Bend & Assy Final Inspec.<br />
9 Days<br />
2 Days 2 Days 2 Days<br />
1 Day<br />
Lead Time = 7 Days<br />
5 Days<br />
1. Lead Time (After)<br />
Information<br />
Machining Washing Bend & Assy Final Inspec.<br />
9 Days 2 Days 1.5 Days<br />
Lead Time = 2 Days<br />
Reduce = 71.4%<br />