COCHIN SHIPYARD LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) P.O. BAG NO.1653 COCHIN-682 015 Tel. No. +91(484) 2361181/2351181/2366340 Fax No. +91(484) 2370897/373902 Mob: 09895765812 E– Mail: dgmcivil@cochinshipyard.com Web: www.cochinshipyard.com TENDER FOR CONSTRUCTION OF OFFICE ACCOMMODATION FOR SHIP OWNERS AND CREW AT FIRST FLOOR OF DOCK HOUSE SOUTH SIDE Tender No: CIV/042/2013/SM I (CE) dtd: 26.04.2013 This document consists of 46 pages (Last date of submission of tender is on or before 14:00 hrs of 10-05-2013).
- Page 2 and 3: 1 CHECK LIST No: CIV/042/2013/SM I
- Page 4 and 5: 3 Solid wall light weight partition
- Page 6 and 7: 5 7.1. Cover A: - Technical bid - s
- Page 8 and 9: 7 effect that the tenderer is finan
- Page 10 and 11: 9 22. 10% of the bill amount (less
- Page 12 and 13: 11 36. If the contractor abandons t
- Page 14 and 15: 13 will be made from the payment du
- Page 16 and 17: 15 60. The contractor shall not con
- Page 18 and 19: 17 Works Contract tax @8% plus cess
- Page 20 and 21: 19 86. The steel reinforcement shal
- Page 22 and 23: 21 no longer exists. During the per
- Page 24 and 25: 23 SL. NO 5 DESCRIPTION Providing a
- Page 26 and 27: 25 SL. NO DESCRIPTION hardwares, pr
- Page 28 and 29: 27 SL. NO DESCRIPTION QTY UNIT RATE
- Page 30 and 31: 29 SL. NO DESCRIPTION bars 32x 5mm
- Page 32 and 33: 31 SL. NO DESCRIPTION QTY UNIT (v)
- Page 34 and 35: 33 SL. NO DESCRIPTION labour, other
- Page 36 and 37: 35 SL. NO DESCRIPTION with CP fixin
- Page 38 and 39: 37 SL. NO DESCRIPTION door/windows
- Page 40 and 41: 39 ANNEXURE I PROFORMA OF POWER- OF
- Page 42 and 43: 41 ANNEXURE III FORMAT OF FINANCIAL
- Page 44 and 45: 5. Hernia, Hydrocele, Piles, etc. -
- Page 46 and 47: Page No: 45 Toilet Conference table
<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
(A GOVERNMENT OF INDIA ENTERPRISE)<br />
P.O. BAG NO.1653 <strong>COCHIN</strong>-682 015<br />
Tel. No. +91(484) 2361181/2351181/2366340<br />
Fax No. +91(484) 2370897/373902<br />
Mob: 09895765812<br />
E– Mail: dgmcivil@cochinshipyard.com<br />
Web: www.cochinshipyard.com<br />
TENDER<br />
FOR<br />
CONSTRUCTION OF OFFICE ACCOMMODATION FOR SHIP<br />
OWNERS AND CREW AT FIRST FLOOR OF DOCK HOUSE<br />
SOUTH SIDE<br />
Tender No: CIV/042/2013/SM I (CE) dtd: 26.04.2013<br />
This document consists of 46 pages<br />
(Last date of submission of tender is on or before 14:00 hrs of 10-05-2013).
1<br />
CHECK LIST<br />
No: CIV/042/2013/SM I (CE)<br />
CONSTRUCTION OF OFFICE ACCOMMODATION FOR SHIP OWNERS AND<br />
CREW AT FIRST FLOOR OF DOCK HOUSE SOUTH SIDE<br />
1 Whether the tenderer has completed during the last seven<br />
years, works of similar nature described in the NIT costing<br />
either one work of value 50 Lakhs or two works of value 31<br />
Yes / No<br />
Lakhs each or three works of value 25 Lakhs each.<br />
2 Whether the tenderer has an average annual turn over more<br />
than 19 Lakhs during the preceding 3 financial years.<br />
3 Whether the tenderer is capable of mobilizing<br />
equipments/machinery for the execution of the work.<br />
4 Whether the tenderer has been blacklisted from any Govt.<br />
Dept. / Company.<br />
Yes / No<br />
Yes / No<br />
Yes / No<br />
5 Whether the tenderer has valid service tax registration Yes / No<br />
Attested /notarized documental evidences in proof of 1 to 2 are to be furnished along<br />
with the Performa at annexure I to III duly filled and signed.<br />
Explanatory notes: Similar work(s) means Construction of RCC framed buildings /<br />
buildings with truss roof OR marine RCC works OR RCC with structural fabrication<br />
works etc .<br />
Senior Manager I (Civil)<br />
Signature, Name &<br />
Address of Contractor:<br />
Date:
2<br />
<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
(A Government of India Enterprise)<br />
P.O. BAG NO.1653 <strong>COCHIN</strong>-682 015 INDIA<br />
Tel. No. +91(484) 2361181/2351181/2366340<br />
Fax No. +91(484) 2370897/373902<br />
E– Mail: dgmcivil@cochinshipyard.com<br />
Web: www.cochinshipyard.com<br />
No. CIV/042/2013/SM I (CE) 26-04-2013<br />
TENDER NOTICE<br />
Sealed competitive tenders in the prescribed form are invited on behalf of Cochin<br />
Shipyard Limited from experienced contractors for the under mentioned work, so as to<br />
reach the undersigned on or before the date and time mentioned below:<br />
Name of Work<br />
: CONSTRUCTION OF OFFICE ACCOMMODATION<br />
FOR SHIP OWNERS AND CREW AT FIRST<br />
FLOOR OF DOCK HOUSE SOUTH SIDE<br />
Earnest Money to be deposited<br />
: Rs. 1, 25, 000/-(Rupees One Lakh Twenty Five<br />
Thousand only)<br />
Cost of Tender Form : Rs. 500/- + S.T (5%)<br />
(Those who download the tender form from website also will be required to remit the<br />
cost along with the tender documents in the form of DD drawn in favour of Cochin<br />
Shipyard Ltd)<br />
Last date and time of issue of tender forms<br />
Last date and time of receipt of tender<br />
Date and time of opening of tender Box<br />
: 09-05-2013 upto 15.00 hrs.<br />
: 10-05-2013 upto 14.00 hrs.<br />
: 10-05-2013, 14.30 hrs.<br />
(Price bid of those tenderers who submitted<br />
EMD and certificate signed by the contractor<br />
will be opened on a later date)<br />
Time of completion of Work<br />
: 6 Months<br />
Short description of Work<br />
The proposed building is a RCC framed building with a total plinth area of 300 m2. Work<br />
involves providing RCC 1:11/2:3 (83 m 3 ), Brickwork in CM 1:5 (50 m 3 ), half brick wall ( 160<br />
m2) , Plastering with CM 1:4, 12 thick (1070 m 2 ), Plastering with CM 1:3, 6 thick (420m 2 ),
3<br />
Solid wall light weight partition ( 180 m2), Painting with exterior Acrylic Emulsion (210 m 2 ),<br />
Painting with Plastic Emulsion (1415m 2 ), Aluminium Sliding Windows, Aluminium Doors,<br />
Vitrified tile flooring (245m 2 ), ceramic tile flooring (210 m 2 ), Calcium Silicate Grid ceiling<br />
(300m 2 ), Sanitary, Plumbing and allied works etc.<br />
The tenders should be submitted in two separate sealed covers superscribed as cover A<br />
“TECHNICAL BID” and cover B “PRICE BID” indicating name of work, tender No., due date,<br />
name, address and contact No. of the tenderer.<br />
TECHNICAL BID should contain the documents listed in clause 7.1 of special conditions of<br />
contract: -<br />
1. Remittance of EMD in a separate sealed cover kept outside the cover containing<br />
Technical bid.<br />
2. Proforma of checklist duly filled and signed.<br />
3. All Certificates as per Clause No.7.1 (b) in special condition.<br />
4. Proforma at Annexures I to III duly filled and signed along with necessary documental<br />
evidence<br />
PRICE BID: Price bid of those tenderers who qualify technically will only be considered.<br />
Price bid shall be with out any conditions and strictly in accordance with the tender<br />
schedule and specification. Rates quoted should be inclusive of all taxes and duties<br />
including service tax. Date of opening of Price bid will be intimated to successful<br />
tenderers in advance through phone / E mail/ Fax. PRICE BID WITH ANY CLAUSES LIKE<br />
REIMBURSEMENT OF TAXES ETC OR ANY OTHER CONDITIONS ADDED BY THE<br />
TENDERER OTHER THAN RATES AND AMOUNTS WILL BE SUMMARILY REJECTED.<br />
The tender documents can be obtained from the office of the undersigned during<br />
office hours till the last date and time of issue of Tenders. All the tender documents<br />
(NIT, General conditions of contract, special conditions, specification, tender schedule and<br />
proforma of check list) are available on Cochin Shipyard’s website www.cochinshipyard.com<br />
and Govt. website http://tenders.gov.in. Tenderers can download the forms and use the<br />
same for submission of the tenders.<br />
Senior Manager I (Civil)
4<br />
CIVIL ENGINEERING DEPARTMENT<br />
File No. CIV/042/2013/SM I (CE)<br />
SPECIAL CONDITIONS<br />
NAME OF WORK: CONSTRUCTION OF OFFICE ACCOMMODATION FOR SHIP<br />
OWNERS AND CREW AT FIRST FLOOR OF DOCK HOUSE<br />
SOUTH SIDE<br />
1. The conditions enumerated below are in addition to the General conditions of contract<br />
given in “Conditions of contract and instructions to Tenderers of CSL” and will have<br />
precedence over them.<br />
2. “General Conditions of Contract (GCC) and Instructions to Tenderers” is available in<br />
the CSL website. The tenderer shall submit his tender document including GCC.<br />
Although, it is permissible to submit the tender without the copy of GCC, while<br />
entering into agreement by the successful tenderer, the GCC shall be duly signed by<br />
both the parties and form part of the agreement. As such, it is deemed that the<br />
tenderer has made reference to the GCC in the website or otherwise, and has full<br />
knowledge of its contents, although it is not signed and attached with the tender.<br />
3. In the General Conditions of Contract DGM (Civil) should be read as SM (Civil) who will<br />
be the Engineer- in- charge.<br />
4. Throughout these bidding documents, the terms “bid” and “tender” and their<br />
derivatives (“bidder / tenderer”, “bid /tender”, “bidding / tendering”, etc.) are<br />
synonymous, and day means calendar day. Singular also means plural.<br />
5. The bidder shall not be put on holiday by CSL or black listed by any Government<br />
Department / Public Sector undertaking etc<br />
6. All corrigenda, addenda, amendments and clarifications to Tender Specifications will be<br />
hosted in the website www.cochinshipyard.com and not in the newspaper. Bidders shall<br />
keep themselves updated with all such developments till the last date and time of<br />
submission of tender.<br />
7. The tender for the work will be based on Two Bid system. The tender has to be<br />
submitted in two covers. (cover ‘A’ & cover ‘B’)<br />
Signature of Contractor
5<br />
7.1. Cover A: -<br />
Technical bid - shall consist of two separate covers A1 &A2. Cover A1<br />
shall contain EMD for Rs. 1, 25,000 /- in the form of DD/ FDR drawn in favour of<br />
Cochin Shipyard Limited. Cover A2 shall consist of the following<br />
(a) Proforma of checklist duly filled and signed.<br />
(b) Following Certificates signed by the contractor.<br />
“I / WE COMPLY WITH ALL CONDITIONS OF TENDER BY CSL AND<br />
CONFIRM THAT RATES QUOTED IN THE PRICE BID ARE INCLUSIVE OF ALL<br />
TAXES AND DUTIES INCLUDING SERVICE TAX IF APPLICABLE. I / WE<br />
ALSO CONFIRM THAT COVER B (PRICE BID) DO NOT CONTAIN ANY<br />
CONDITIONS”<br />
“I / WE HAVE NOT MADE ANY PAYMENT OR ILLEGAL<br />
GRATIFICATION TO ANY PERSON/AUTHORITY CONNECTED WITH THE BID<br />
PROCESS SO AS TO INFLUENCE THE BID PROCESS AND HAVE NOT<br />
COMMITTED ANY OFFENCE UNDER THE PC ACT IN CONNECTION WITH THE<br />
BID.”<br />
(c) Proforma at Annexures I to III duly filled and signed along with necessary<br />
documental evidence<br />
Attested documents by gazetted officer/Notory in proof of experience & financial<br />
turnover to be submitted. For works undertaken at Cochin shipyard, copy of work order<br />
and last paid bill can be submitted as documental evidence. In the case of experience<br />
from private sector, work completion certificate and relevant TDS certificate shall be<br />
enclosed. An audited balance sheet and profit & loss Account for the preceding 3 years<br />
has to be submitted in proof of financial turn over.<br />
7.2. Cover B:<br />
Financial /price bid - shall contain the rates and amount for each item of work. There<br />
shall not be any clause like reimbursement of taxes etc, added by the tenderers in the<br />
price bid. Price bid with any clause and conditions other than rates and amount will be<br />
summarily rejected.<br />
7.3 The cover A & cover B shall be then put together in another cover marked Cover C.<br />
All the covers shall be sealed and superscribed with name of work, due date, name and<br />
address & Contact No: of contractor.<br />
Signature of Contractor
6<br />
7.4 Cover C shall be opened at 14:30 hrs on 10/05/2013 at the Civil Engineering<br />
Department. At first, cover A 1 containing EMD and cover A 2 containing technical bid<br />
shall be opened. In case the earnest money is not deposited or is not in order, the<br />
tender shall be returned to the tenderer unopened either on the spot, if the tenderer<br />
is present or later by post. Only a mention to this effect shall be made in the tender<br />
opening register.<br />
8. SELECTION CRITERIA<br />
Selection criteria for qualifying the tenderers for opening the price bids in Cover ‘B’ of<br />
the tender will be as below:<br />
(i) Experience:<br />
The tenderer should have successfully completed at least one similar work of value<br />
not less than Rs. 50 Lakhs OR Two similar works, each of value not less than Rs. 31<br />
Lakhs OR Three similar works, each of value not less than Rs. 25 Lakhs, during the<br />
preceding seven years including current year but upto the last date for sale of<br />
tender. The tenderer shall furnish experiences as per the proforma at Annexure-II<br />
along with necessary documental evidences. For works undertaken at Cochin<br />
Shipyard Ltd, copy of work order and last paid bill can be submitted as documental<br />
evidence.<br />
Explanatory notes: Similar work(s) means Construction of RCC framed buildings /<br />
buildings with truss roof OR marine RCC works OR RCC with structural fabrication<br />
works etc .<br />
ii) Financial Turnover:<br />
Average Annual Financial Turnover of the tenderer during the last three financial<br />
years ending on March 2012 shall not be less than Rs. 19 Lakhs. An audited balance<br />
sheet and profit & loss Account for the preceding 3 years has to be submitted in<br />
proof of financial turn over.<br />
iii) Financial capability for executing the work:<br />
The tenderer shall furnish financial capability certificate for an amount not less<br />
than Rs 19 Lakhs (Average annual turn over) as per the proforma at Annexure-III<br />
along with the tender document, from his bankers/ financial institutions, to the<br />
Signature of Contractor
7<br />
effect that the tenderer is financially sound and has sufficient resources for<br />
executing the work as per schedule.<br />
9. Price bid (cover B) of those tenderers who have qualified technically and submitted<br />
EMD and the undertaking that Cover B does not contain any conditions shall only be<br />
opened on a later date after giving notice to the qualified bidders. Tenderer should<br />
ensure that his quoted amount as per cover B is not mentioned anywhere in other<br />
documents, directly or indirectly. If any such mention is made the tender will<br />
become invalid and shall become liable for rejection.<br />
10. Late tenders, tenders with conditions and conditional rebates / discounts will be<br />
summarily rejected.<br />
11. The acceptance of a tender will rest with CGM (Tech) who does not bind himself to<br />
accept the lowest tender and reserves to himself the authority to reject any or all of<br />
the tenders received without assigning any reason.<br />
12. The tenderer should keep open the validity of the tender normally for 90 days from<br />
the date fixed for its opening. Should any tenderer withdraw his tender before this<br />
period, or makes any modifications in the terms and conditions of the tender which<br />
are not acceptable to CSL, the earnest money deposited by the tenderers shall be<br />
forfeited.<br />
13. During the evaluation of tender SM (Civil) may at his discretion ask the bidders for<br />
clarifications. Request for clarification will be given in writing and no change in prices<br />
or substance of the bid shall be sought, offered or permitted.<br />
No post-bid<br />
clarification on the initiative of the bidder will be entertained.<br />
14. If any difference is found in different parts of the tender documents, the following<br />
will be in order of precedence.<br />
(i)<br />
(ii)<br />
Schedule<br />
Special conditions<br />
(iii) Condition of contract and instructions to tenderers.<br />
15. Rates shall be both in figures and words. Rates quoted should be in Indian Rupees<br />
inclusive of all taxes and duties, including service tax if any, in accordance with the<br />
tender schedule.<br />
Signature of Contractor
8<br />
16. The rates quoted by the contractor shall be for finished items of works including<br />
supplying appropriate materials, labour, equipment/tools, conveyance etc. all complete,<br />
unless specified in the tender schedule.<br />
17. The tenderers are expected to have inspected the site, before quoting, read the<br />
conditions thoroughly and understand the works in all respect. Clarifications, if any<br />
may be obtained from the SM (Civil) before the tender is submitted, and if<br />
clarifications/details are not obtained before the tender is submitted, no claim on<br />
this account will be admitted.<br />
18. The contractor is expected to acquaint himself with the site conditions, labour<br />
situation, wage and benefits applicable to labourers, working hours, out turn of work<br />
by labour and the fluctuations which are likely to happen till the work is completed on<br />
all the above aspects prior to quoting the rates. The submission of a tender by<br />
tenderer implies that he has made himself aware of all the above situations and<br />
conditions. Any extra claim on this account will not be entertained.<br />
5 The site being 2nd floor of the existing Dock House building, all precautions shall be<br />
taken to see that minimum disturbance is caused to the normal functioning of the<br />
offices at ground floor. The contractor shall not cause any obstruction in the premises<br />
of Dock House especially in the front yard and the roads while storing/keeping the<br />
materials/tools/equipment. All care shall be taken to keep the premises clean without<br />
dumping any debris as far as possible.<br />
19. The contractor shall provide green shade nets all around in the executing site to<br />
prevent dust pollution to nearby working areas at no extra cost. The contractor shall<br />
take into consideration the above aspect while quoting for the work.<br />
20. While undertaking the work, extra care shall be taken to prevent any leakage of<br />
cement slurry/rain water or falling of dismantled materials etc. Necessary protective<br />
arrangements as approved by the Engineer-in charge shall be provided for this by the<br />
contractor at his own cost.<br />
21. The contractor shall thoroughly study the specifications and drawings and<br />
errors/omissions/modifications if any shall be brought to the notice of the Engineerin-Charge<br />
well in advance so that a final decision in the matter could be given in time.<br />
Signature of Contractor
9<br />
22. 10% of the bill amount (less EMD) will be deducted as security deposit from running<br />
account bills and the same shall be released after the successful completion of the<br />
observation period of 12 months from the completion date of the project. The<br />
contractor has to make good all defects during the observation period at his own cost.<br />
Security Deposit will not accrue any interest.<br />
23. The time of completion of work of 6 months shall be reckoned from the 14 th day of<br />
the date of issue of the work order or the date of handing over the site whichever is<br />
later.<br />
24. The contractor shall submit a detailed time schedule in conformity with the<br />
completion time stipulated in the tender within 7 days from the date of issue of letter<br />
awarding the work.<br />
25. The contractor or his authorized representative with sufficient experience shall be<br />
available at CSL throughout the period of contract for receiving instructions from<br />
department, arranging and executing the work.<br />
26. The Contractor / representative shall report at the office of the Engineer-in-charge<br />
on all working days before 8:30 hrs and receive instruction regarding the works.<br />
27. The Contractor may have to work round the clock including holidays, if required to<br />
complete the work in time without any extra cost. However works executing out of<br />
office hours and holiday shall be informed to the Engineer-in-charge well advance and<br />
get his clearance.<br />
28. The normal working time of the CSL is from 8.15 A.M. to 5.00 P.M on all weekdays and<br />
Saturdays with half an hour interval from 12.15 noon to 12.45 P.M. All Sundays, second<br />
Saturday and fourth Saturday are holidays. If the Contractor wishes to carry out the<br />
work beyond normal working hours and or on holidays, he should get specific approval<br />
from the Engineer-in-Charge for the same. Necessary supervision will be arranged by<br />
the department.<br />
29. The completion of work may entail working in monsoon period/ rainy season also. The<br />
contractor shall take such an eventuality into consideration while quoting for the work.<br />
No extra rate or extension of contract period will be admissible for work in monsoon/<br />
rainy season. During monsoon and other period it shall be contractor’s responsibility,<br />
to keep the construction site free from water at his own cost.<br />
Signature of Contractor
10<br />
30. The successful tenderer will be required to execute an agreement at his expense on<br />
proper value Kerala State Stamp Paper in the prescribed departmental form.<br />
31. In the event of the tenderer, after the issue of work order by CSL, failing / refusing<br />
to execute the agreement, the tenderer shall be deemed to have abandoned to the<br />
contract and such an act shall amount to and be construed as the contractors<br />
calculated and the willful breach of the contract, the cost and consequence of which<br />
shall be to the sole account of the tenderer and upon such an event CSL shall have full<br />
right to claim damages therefore either together with or in addition to the forfeiture<br />
of Earnest Money Deposit.<br />
32. The contract shall come into effect on the date of signature of both the parties on<br />
the contact (effective date) and shall remain valid until the completion of the<br />
obligation of the parties under the contract. The deliveries, supplies and performance<br />
of the service shall commence from the effective date of the contract.<br />
33. All notices / written orders issued by CSL to the contractor under the terms of the<br />
contract shall be served by sending by Post or Fax or Email or delivering the same to<br />
the contractors authorized site official nominated for this purpose.<br />
34. The Cochin Shipyard is an International Ship & Port Facility Security (ISPS) code<br />
compliant Shipyard and the contractor is obliged to comply with the provisions of the<br />
code in force and as amended from time to time. The site for the proposed work is a<br />
protected area and hence security rules and regulations including obtaining work<br />
permits, obtaining entry / exit passes including photo passes for men, vehicles and<br />
materials etc. for entering the area shall be observed by the contractor.<br />
Contractor/workers should produce police clearance certificate, passport or any other<br />
photo ID cards approved by CSL and Medical Fitness Certificate, as per the performa<br />
at Annexure IV issued by recognized medical practitioner (Allopathy) to get entry<br />
pass to Shipyard area.<br />
35. All labour, skilled or unskilled shall be provided by the contractor. Settling any dispute<br />
with the labour/ subcontractor will be contractor’s responsibility. The workers<br />
engaged for works should have sufficient knowledge and experience in the respective<br />
fields. This shall be proved to the Engineer-in-charge.<br />
Signature of Contractor
11<br />
36. If the contractor abandons the contract or fails to commence the work in time or<br />
suspend the work for long duration (15 days) or delay the progress of the project<br />
without valid reasons acceptable to CSL or labour dispute with their workers or poor<br />
safety records etc CSL will terminate the contract and arrange the work at the risk<br />
and cost of the contractor. In such case EMD & Security Deposit will be forfeited<br />
forthwith.<br />
37. The tender documents and drawings are to be returned along with the tender, duly<br />
signed by the contractor in all pages.<br />
38. The contractor shall bring all necessary machinery and equipments required for the<br />
work.<br />
39. Contractor shall be permitted to use artificial crushed sand (fine aggregate) in place<br />
of “clean river sand” subject to the approval Engineer in charge<br />
40. Cochin shipyard reserves the right to award the work to one or more contractors or<br />
delete any part of the work from the scope of the contract or cancel the tender<br />
without assigning any reason.<br />
41. The work shall be carried out without damaging any of the existing structures/<br />
structures under construction/ underground pipelines or cables etc in the locality. If<br />
any damage occurs to the CSL property, by the contractor’s operation shall be<br />
compensated / made good at contractor’s risk and cost to the satisfaction of the<br />
Engineer-in-Charge of the works, failing which department will do the rectification<br />
work and the cost incurred will be recovered from his bill or from security deposit.<br />
42. Relevant I.S. codes are to be followed for all items of work, any deviation for the<br />
work are found with this tender documents, Indian Standard specifications and Kerala<br />
Public Works Department specifications are to be followed. If specifications are<br />
silent about any aspect, other codes as directed by the Engineer-in-charge will be<br />
followed. In the absence of any code dealing with particular aspect, sound engineering<br />
practice shall prevail. Decision of the Engineer-in-charge in this respect will be final.<br />
In case there is a difference between Indian standard code and KPWD specification,<br />
the former shall prevail.<br />
Signature of Contractor
12<br />
43. All materials to be used on the work will have to be got approved by the Engineer-incharge<br />
before use. Unless otherwise decided by the Engineer-in-charge all the<br />
materials are to be procured by the contractor.<br />
44. For the construction purpose, the entire site will be handed over. If this is not<br />
possible due to reasons, which cannot be anticipated now, the site will be handed over<br />
in parts. Proportionate extra time will be granted if found necessary by the Engineer<br />
in Charge and the decision of Engineer in Charge shall be final.<br />
45. Delay compensation as per clause 2 of GCC will be levied on the final value of the<br />
whole work when the site is handed over in one stretch. When the site is handed over<br />
in Phases with separate period of completions, delay compensation as per clause 2 of<br />
GCC will be levied on the value of the phase of which completion is delayed.<br />
46. The contractor shall at his risk and cost make all arrangements and shall provide all<br />
facilities as the Engineer-in-charge may require for collection, preparing, forwarding<br />
and testing the required number of samples for test (or for analysis) to places as may<br />
be directed by the Engineer-in-charge. The charges for testing to be borne by the<br />
contractor.<br />
47. Electrical and Mechanical contractors will be working at the same site during the<br />
course of civil works. Contractor shall work in close co-ordination with these agencies<br />
working in the same work site at the same time. The space for storage of materials<br />
for each work should also be decided by mutual agreement among the contractors<br />
working in the same area. CSL will not entertain any claim regarding non-availability of<br />
space for storing materials nor can enter into any discussion to settle the dispute<br />
between contractors regarding usage of space for storing materials etc.<br />
48. Electric power supply from KSEB grid is available in CSL but cannot ensure<br />
uninterrupted power supply. There can be restriction in supply of power by KSEB.<br />
Contractors shall take note of this situation.<br />
49. Water required for the work will be supplied by CSL at one point within 100m from<br />
the site of work at Rs. 55 (Rupees Fifty Five only) per thousand litres. However<br />
adequate supply of water cannot be guaranteed all the time and the contractor may<br />
have to make his own arrangements to get water through other sources in such cases.<br />
No extra claim will be entertained in this regard. Recoveries towards water charges<br />
Signature of Contractor
13<br />
will be made from the payment due to the contractor. Water arranged by the<br />
contractor shall be clean fresh water free from oils, acids, alkalies, salt, sugar,<br />
organic materials or other harmful materials. Potable water is generally considered<br />
good for mixing concrete. Samples of water arranged by the contractor shall be taken<br />
by the Engineer-in-Charge and got tested in accordance with the provisions of<br />
relevant BIS codes. In case test results indicate that the water arranged by the<br />
contractor does not conform to the relevant BIS codes, the same shall not be used<br />
for any works. The cost of tests shall be borne by the contractor.<br />
50. All notices to be given to CSL under the terms of contract shall be served by sending<br />
by post or delivering the same to SM (Civil).<br />
51. Regarding supply of electricity, the following points will be applicable in addition to<br />
Annexure ‘A’ (page 52) of general conditions of contract: -<br />
(a) Electricity charges for the energy consumed will be recovered monthly at the<br />
tariff applicable to construction purposes subject to revision by KSEB. Present<br />
tariff varies from Rs 5.25 to Rs 8.50 per unit. Fixed charges and welding load<br />
charges will be extra. Recoveries towards electricity charges will be made from<br />
the payment due to the contractor.<br />
(b) Cochin Shipyard limited will make available power at one of the existing outlets<br />
within a maximum distance of 100m from the site of work. The contractor shall<br />
make his own arrangements for taking power from such outlets at his own cost<br />
and get it approved by U & M. Department well in advance of starting the work.<br />
Electric power supply from KSEB grid is available in CSL. There can be<br />
restriction in supply of power by KSEB. Contractors shall take note of this<br />
situation. CSL shall make every endeavour to make available uninterrupted<br />
power supply to the contractor. But if due to any reason power supply to CSL is<br />
restricted or stopped by KSEB or any other agencies CSL will also have to<br />
restrict or stop electric power supply to the contractor.<br />
52. The Following services will be issued free of cost depending on availability. Contractor<br />
has to make his own arrangements to avail the same at his risk and subject to<br />
satisfying statutory rules and regulations if any.<br />
Signature of Contractor
14<br />
a. Oxygen<br />
b. Acetylene<br />
c. Carbon dioxide<br />
d. LPG<br />
e. CSL cranes / Fork lifts / Trailer<br />
53. Any cement that the Engineer-in-charge considers has become stale or unsuitable<br />
through absorption of moisture from the atmosphere or otherwise due to improper<br />
transport/ storage/ handling by the contractors shall be rejected.<br />
54. Any admixture if found necessary for concrete items by the contractor to suit his<br />
work could be provided by him at his own cost with prior approval of the Engineer-incharge.<br />
No extra payment will be made for the same by CSL.<br />
55. Empty cement bags are to be stacked in bundles and to be cleared from site at<br />
contractor’s expense as directed by the Engineer-in-charge.<br />
56. Waste materials are to be cleared from site on a day-to-day basis. Each area of<br />
working is to be cordoned off with necessary signboards and barriers to ensure safe<br />
transportation of men and material by CSL in the area as directed by the Engineer-incharge.<br />
57. SM (Civil) shall have the right to take possession of or use completed or partially<br />
completed part of the work. Such possession or use shall not be deemed to be an<br />
acceptance of such work. After completion of all the works, the contractor has to<br />
clear all the debris and make the area neat and tidy at the site. The final bill shall be<br />
paid only after the certification by safety department to this effect.<br />
58. It is the responsibility of the contractor to follow all safety rules and regulations in<br />
force, during the currency of contract in CSL, and any violation of the same during the<br />
course of work will be at the risk and cost of the contractor and will attract penal<br />
action. Copy of CSL Safety manual is available in the Office of SM (Civil) AND the<br />
same may be referred before quoting the rates.<br />
59. Any violation of Safety rules by the contractor, safety department will impose penalty<br />
of Rs 1000/- to Rs 5000/- depending on the gravity of violation. Action for debarring<br />
the contractor also will be taken in case of repeated violation. Any accident caused<br />
due to safety violation and any damage to the company property suitable penalty will<br />
be imposed by CSL including termination of contract, if required.<br />
Signature of Contractor
15<br />
60. The contractor shall not construct any structure, even of temporary nature, for any<br />
purpose at site, except with the written permission of the Engineer-in-Charge of the<br />
work and any construction so put up shall be removed by the contractor whenever the<br />
Engineer-in- Charge calls upon the contractor to do so.<br />
61. The quantities given in the Schedule of quantities are only approximate and payment<br />
will be made as per actual quantity of work done and rates finalized.<br />
62. The drawings given in the tender documents are only for tendering purpose. Final<br />
detailed drawings are to be issued during execution at site. There can be changes in<br />
drawing as per the requirement of Cochin Shipyard Limited and the quantity may vary<br />
on execution of works and no extra claim on rates will be entertained.<br />
63. Before commencement of the work the contractor shall establish at suitable points<br />
(as directed by Engineer in charge) reference benchmarks based on the standard<br />
benchmark approved by the Engineer in charge. The construction and maintenance of<br />
these benchmarks shall be responsibility of the contractor at his cost and risk. These<br />
reference benchmarks established by the contractor shall be got checked and<br />
approved by the Engineer in charge at suitable intervals of time.<br />
64. The contractor shall be responsible for the true and proper setting out of the works<br />
and for the correctness of the position, levels, dimensions, and alignment of all parts<br />
of the works and for the provision of all necessary instruments, appliances and labour<br />
in connection therewith. If at any time during the progress of the work any error shall<br />
appear or arise in the position, level, dimension or alignment of any part of the work,<br />
the contractor on being required to do so by the Engineer in charge, shall at his cost<br />
rectify such errors to the satisfaction of the Engineer in charge. The checking of any<br />
setting out or of any line or level by the Engineer in charge shall not in any way relieve<br />
the contractor of his responsibility for the correctness thereof. The contractor shall<br />
provide all necessary instruments, appliances and labour required for the Engineer in<br />
charge for checking, if any, of the setting out. The contractor shall carefully protect<br />
and observe all benchmarks, site levels, pegs and other things used in setting out the<br />
works.<br />
Signature of Contractor
16<br />
65. Welding Sets without ELCB and Safety Relay shall not be permitted at site. Also<br />
flashback arrester is to be provided in all cutting torches. Necessary instructions<br />
regarding safety shall be strictly adhered to by the agency.<br />
66. For all items brought from outside to be used/ consumed on the work, Material<br />
Declaration forms with work order number shall be obtained from Security section<br />
and the same shall be submitted at the office of the Engineer-in-Charge.<br />
67. For works at height and excavation / trench openings and night work, Work permit<br />
from safety department has to be obtained.<br />
68. The monthly payment shall be based on the bill submitted by the contractor. The bill<br />
for previous month along with detailed measurement shall be prepared and submitted<br />
on 7 th working day of the current month and payment shall be released within one<br />
month from the date of submission of claim (bill) by the contractor or date of<br />
acceptance of the bill by both parties which ever is later .The contractor shall submit<br />
running account bills in one copy along with joint measurements. The contractor shall<br />
inform the Engineer in Charge or his representative well in advance for recording the<br />
joint measurement. The contractor shall raise only one bill in a month and shall submit<br />
the bill after joint measurement.<br />
69. For the completed items of the work 75% of the net amount payable on each bill can<br />
be paid as advance by CSL at the discretion of SM (Civil), on a request by the<br />
contractor and a recommendation of the Engineer-in-charge and production of an<br />
undertaking on approved format by the contractor. Balance amount will be paid after<br />
scrutiny and check of the bill.<br />
70. The tenderer shall specify the PAN No: allotted to him so that DGM (Fin) can<br />
ascertain his liability to the Income Tax Department. The income tax/KVAT/ any<br />
other statutory taxes, as per the rules /directions of the concerned departments,<br />
prevailing in force at the time of payment of bills will be deducted while making<br />
payment or when crediting the amount to the account.<br />
71. The contractors registered under the Kerala Value Added Tax Act, 2003 shall<br />
produce a Liability Certificate, along with the bill, in relation to the works contract,<br />
from the Assessing Authority showing the tax liability or tax remittance as the case<br />
may be and the works contract tax deduction will be made accordingly. Otherwise<br />
Signature of Contractor
17<br />
Works Contract tax @8% plus cess as applicable in the case of registered contractors<br />
and @10% plus cess as applicable in the case of unregistered contractors will be<br />
deducted from the payment released against the contract.<br />
72. The tenderer shall furnish documentary evidence in support of Valid Service Tax<br />
Registration. Service Tax Registration number is to be clearly mentioned in the<br />
tender. 50% of Service Tax prevailing in force at the time of payment of bill will be<br />
deducted while making payment to the contractor .While submitting all the running<br />
account bills the contractor has to specifically mention the taxable value of work done<br />
and its service tax component, separately, totaling to the bill value.<br />
73. All rejected materials shall be removed with in 3 days from the date of written order<br />
to that effect. In case the rejected materials are not removed within the specified<br />
period mentioned above the same will be removed by CSL at the cost and risk of the<br />
contractor.<br />
74. CSL is an ISO 9001, ISO 14001 and ISO 18001 certified firm. All the contractors and<br />
subcontractors shall comply with the measures related to the Quality, Health, and<br />
Safety & Environment (QHSE) policy of CSL. Any clarification related to IMS<br />
requirements of the yard, may be obtained by the contractor from the Engineer in<br />
charge or the authorized representative of the contract, prior to the commencement<br />
of work<br />
75. The final bill shall be paid within Four months from the date of submission of claim<br />
(bill) by the contractor or completion of all the items of work or date of acceptance<br />
of the bill by both parties which ever is later.<br />
76. It will be mandatory for the bidders to indicate their bank account numbers and other<br />
relevant E-payment details so that payments could be made through ECS/EFT<br />
mechanism instead of payment through cheques, wherever feasible.<br />
77. Secured advance shall be given for non-perishable materials as provided in Clause 15<br />
of Conditions of Contract of GCC. Cement, Sand and different grades of hard granite<br />
broken stones will not considered as a non-perishable item. For materials brought<br />
without valid material Declaration forms issued from CISF Security section of CSL,<br />
Secured advance shall be paid against a Bank Guarantee for an equivalent amount.<br />
Decision of the Engineer in Charge to this aspect will be final.<br />
Signature of Contractor
18<br />
78. Ground rental charges at the prevailing rate of Rs 5 per Sqm per month will be levied<br />
from the contractor and will be recovered from the payment due to the contractor<br />
for the land allotted by CSL to him for setting up temporary office space and the<br />
same will be recovered from the payment due to the contractor. However, no rental<br />
charges will be levied for the material storage area allotted.<br />
79. Availability of vacant space is limited near the site of work. Contractor has to plan the<br />
work in such a manner as to have least amount of stock piling of material and<br />
temporary structures or open work area within the Shipyard premises.<br />
80. Measurement shall be as per relevant IS code IS 1200. In the absence of any code<br />
dealing with a particular aspect, sound engineering practice shall prevail. Decision of<br />
Engineer in charge in this aspect will be final. In case there is discrepancy between<br />
Indian Standard code and CPWD specifications, the former shall prevail.<br />
81. The contractor shall report to the Engineer-in-Charge details of any accidents as soon<br />
as possible after its occurrence. In the case of any fatal or serious accident, the<br />
contractor shall in addition, notify the local police authorities immediately by available<br />
means.<br />
82. Quality of cement used for the work shall be 43-grade ordinary Portland cement<br />
conforming to I.S. 8112 or 53-grade ordinary Portland cement conforming to I.S.<br />
12269 or Pozzolona cement conforming to I.S. 1489 or Portland Slag cement<br />
conforming to I.S. 455 unless otherwise approved by the Engineer-in-Charge.<br />
83. Supply of cement shall be taken in 50kg bags bearing manufacture’s name and ISI<br />
marking. Samples of cement arranged by the contractor shall be taken by the<br />
Engineer-in-Charge.<br />
84. The reinforcement steel used for the work will have to be procured by the contractor<br />
and shall be TMT/ ordinary quality HYSD bars of Fe500 / Fe415 grade conforming to<br />
I.S. 1786 unless otherwise approved by the Engineer-in-Charge.<br />
85. As far as possible, the reinforcement steel/structural steel required for the work<br />
shall be procured from Steel Authority of India or Rashtriya Ispat Nigam Ltd. In case<br />
steel is not available from the above sources, the contractor shall obtain specific<br />
approval from the Engineer-in-Charge well in advance for purchase of steel from other<br />
sources.<br />
Signature of Contractor
19<br />
86. The steel reinforcement shall be stored by the contractor at site of work in such a<br />
way as to prevent distortion and corrosion and nothing extra shall be paid on this<br />
account. Bars of different sizes and lengths shall be stored separately to facilitate<br />
easy counting and checking.<br />
87. All materials not herein detailed and fully specified but which may be required for use<br />
on works, shall be subjected to the approval of the Engineer-in-Charge without which<br />
they shall not be used anywhere in the permanent works.<br />
88. Ready mix concrete from out side source shall be allowed subject to the conditions<br />
that: (i) written permission shall be obtained from the Engineer-in-Charge, (ii) all<br />
quality control measures as stipulated by the Engineer-in-Charge are strictly adhered<br />
to by the contractor at his cost, (iii) all design mix calculations shall be submitted by<br />
the contractor for approval of the Engineer-in-Charge & approval obtained.<br />
89. CSL shall not be liable for, or in respect of, any damages or compensation payable at<br />
law in respect or in consequence of any accident or injury to any workmen or other<br />
person in the employment of the contractor or any sub-contractor, except an accident<br />
or injury resulting from any default of CSL, the contractor shall indemnify and keep<br />
CSL indemnified against all such damages and compensation and against all claims,<br />
demands, proceedings, costs, charges and expenses whatsoever in respect thereof or<br />
in relation thereto.<br />
90. The contractor shall insure against such liability and shall continue such insurance<br />
during the whole of the time that any persons are employed by him on the works.<br />
Provided that, in respect of any persons employed by any sub-contractor, the<br />
contractor’s obligations to insure as aforesaid under this sub-clause shall be satisfied<br />
if the sub-contractor shall have insured against the liability in respect of such persons<br />
in such manner that CSL is indemnified under the policy.<br />
91. The contract involves an obligation of secrecy and the contractor, his agents, servants<br />
or sub-contractor or their agents or servants shall observe and comply with the<br />
requirements of the Indian Official Secrets Act 1923, and the rules there under or<br />
any statutory modifications or re-enactments thereof. Any breach of this clause shall<br />
constitute a breach of the contract. The contractor shall not disclose to anybody the<br />
details of drawings prepared for the work without the approval of CSL. No<br />
Signature of Contractor
20<br />
photographs of the CSL area shall be taken or permitted by the contractor to be<br />
taken by any of his employees without the approval of the competent authority and no<br />
such photographs shall be published, or otherwise circulated without the approval of<br />
CSL.<br />
92. The contractor shall not stop the work or abandon the site for whatsoever reason<br />
except force majeure conditions. The following shall amount to force majeure:-<br />
a) War, hostilities (whether war be declared or not), invasion, act of foreign<br />
enemies<br />
b) Rebellion, terrorism, revolution, insurrection, military or usurped power, or civil<br />
war,<br />
c) Riot, commotion, disorder, strike or lockout by persons other than the<br />
contractor’s personnel and other employees of the contractor,<br />
d) Munitions of war, explosive materials, ionizing radiation or contamination by<br />
radioactivity, except as may be attributable to the contractor’s use of such<br />
munitions, explosives, radiation or radio-activity, and Natural catastrophes such<br />
as earthquake, hurricane, typhoon or volcanic activity.<br />
e) Epidemic, famine;<br />
f) Strikes, Harthal or boycotts interrupting supplies and services to the site<br />
(excluding strikes or boycotts by employees, agents or representatives of<br />
contractor, or its subcontractors for any reason whatsoever);<br />
g) Fire caused otherwise than by any act or omission on the part of the contractor<br />
or its agents servants or employees or its subcontractor;<br />
h) Any event or circumstance of nature analogues to any of the above or an Act of<br />
God.<br />
93. If the contractor suffers delay in due execution of the contractual obligation due to<br />
delays caused by force majeure as defined above, the agreed time of completion of<br />
the job covered by this contract or the obligations of the contractor shall be<br />
extended by a period of time equal to period of delay, provided that on the<br />
occurrence of any such contingency, the contractor immediately should report in<br />
writing to CSL. A hindrance register shall be maintained by CSL in which the<br />
hindrances due to force majeure and hindrances attributable to CSL shall be recorded<br />
and signed by both parties. The hindrance so recorded will be regularized in<br />
accordance with the Contract provisions. The contractor shall resume performance of<br />
its obligations under this Contract as soon as possible after the Force Majeure Event<br />
Signature of Contractor
21<br />
no longer exists. During the period of Force Majeure CSL shall not be responsible for<br />
any cost resulting from a Force Majeure Event.<br />
94. Canvassing in connection with tender is strictly prohibited and tenders submitted by<br />
the contractors who resort to canvassing will be liable to rejection.<br />
95. For concrete works provisions of IS: 456 (2000) shall be followed as general guidance,<br />
along with all other relevant Indian Standards, unless otherwise specifically<br />
mentioned. Contractor shall deploy mechanised system for production, transportation<br />
and placement of concrete.<br />
96. The workmen are strictly banned from use of any kind of Narcotics drugs / Alcohol /<br />
smoking etc inside CSL and any illegal activity by the work men should be reported to<br />
EIC without delay and the contractor shall remove such persons from CSL premises<br />
forthwith.<br />
97. Some of the existing columns are terminated at slab level. For extending the existing<br />
columns, the existing column reinforcement has to be exposed by chipping the<br />
concrete and the new reinforcement and old reinforcement has to be Butt welded.<br />
NDT shall be carried out on the weld joints before concreting. Any defects noticed in<br />
the welding to be repaired by the contractor. The rates quoted for item No: 6 should<br />
be inclusive of charges for welding the reinforcement and no extra shall be paid.<br />
98. The tenderers shall have to sign in each page of the tender documents with<br />
official stamp as a token of his acceptance of the conditions stated therein.<br />
99. Any dispute(s) or differences arising out of or in connection with the Contract shall,<br />
to the extent possible, be settled amicably between CSL and the contractor. Any<br />
litigation in connection with contract shall be subjected to the exclusive jurisdiction<br />
of the Courts at Kochi, India.<br />
100. Tenders duly filled shall be deposited in the Tender Box kept at Civil Department,<br />
Cochin Shipyard Ltd. before the date and time as specified in the Tender Notice.<br />
Senior Manager I (Civil)<br />
Signature, Name &<br />
Address of contractor:<br />
Date:<br />
Signature of Contractor
22<br />
CIVIL ENGINEERING DEPARTMENT<br />
CONSTRUCTION OF OFFICE ACCOMMODATION FOR SHIP OWNERS AND CREW AT FIRST FLOOR OF DOCK HOUSE SOUTH SIDE<br />
No.CIV/042/2013/SM I (CE)<br />
TENDER SCHEDULE<br />
SL.<br />
NO<br />
DESCRIPTION<br />
QTY<br />
UNIT<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
1<br />
2<br />
3<br />
4<br />
Dismantling , clearing away any thickness of<br />
plastered brick wall in cement mortar and disposal of<br />
debris within CSL premises including all labour,<br />
other incidentals, hire for tools and plants etc.<br />
complete.<br />
Chipping & removing existing weather proofing<br />
terracotta tile and Brick jelly concrete over the roof<br />
slab including disposal of debris within CSL<br />
premises including all labour, other incidentals, hire<br />
for tools and plants etc. complete.<br />
Dismantling and removing wooden doors including<br />
removal of frames and shutters, hinges and all other<br />
fittings and stacking materials within CSL premises<br />
etc.complete.<br />
Demolishing RCC slabs/ lintels/columns /sunshades/<br />
beams/ducts/cover slabs etc, exposing the<br />
reinforcement , cutting the reinforcement where ever<br />
needed, separately removing and stacking available<br />
reinforcement where ever needed and clearing away<br />
and disposal of all debris within CSL, all labour, other<br />
incidentals, etc. complete.<br />
37 m 3 m 3<br />
290 m 2 m 2<br />
1 No E<br />
5 m 3 m 3
23<br />
SL.<br />
NO<br />
5<br />
DESCRIPTION<br />
Providing and laying Reinforced cement concrete<br />
1:11/2:3 using 20mm size hard granite broken stone<br />
for following undermentioned works including cost<br />
and conveyance of all materials, labour for mixing,<br />
laying, consolidating, curing, cost of form work etc.<br />
complete, excluding cost of cement and cost and<br />
fabrication charges of steel reinforcement.<br />
QTY<br />
UNIT<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
(i) Columns 7.00 m 3 m 3<br />
(ii) Beams & slabs 56.00 m 3 m 3<br />
(iii) Lintels & sunshades 20.00 m 3 m 3<br />
6<br />
7<br />
Fabricating and placing in position torsteel<br />
reinforcement to size and shape including cost and<br />
conveyance of all materials, butt Welding the existing<br />
and new reinforcement of column of approximate 230<br />
nos, labour for uncoiling, straightening, cutting,<br />
bending, binding, lapping or welding etc. complete<br />
excluding cost of reinforcement. (Rate is inclusive of<br />
cost of 22g binding wire.)<br />
Providing and fixing reinforcement dowel bars in<br />
existing reinforced concrete member using chemical<br />
(resin) anchor Systems such as HIT-HY-150 of HILTI<br />
make or equivalent, including drilling holes of<br />
required diameter and depth, injecting the chemical<br />
by dispenser, cost of chemical ,scaffolding, all tools<br />
and tackles, etc complete as per manufacturer's<br />
specifications. The quantity of rebars will be payable<br />
under relevant item .<br />
15.00 T T
24<br />
SL.<br />
DESCRIPTION<br />
NO<br />
(a) Drilling holes for Y 20 bar - Hole 25 mm dia x 200<br />
deep min., fixing of rebars and injection of chemical<br />
resin.<br />
QTY<br />
UNIT<br />
80 Nos E<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
(b)<br />
Drilling holes for Y 10 bar - Hole 14 mm dia x 100<br />
deep min., fixing of rebars and injection of chemical<br />
resin.<br />
120 Nos E<br />
8<br />
9<br />
10<br />
Brickwork in CM 1:5 using good quality burnt bricks<br />
for brick walls and pillars, including cost and<br />
conveyance of all materials, labour, other incidentals<br />
etc complete, excluding cost of cement.<br />
Half brickwall in CM 1:4 using good quality bricks<br />
including cost and conveyance of all materials,<br />
labour, other incidentals etc. complete.excluding cost<br />
of cement.<br />
Supplying and fixing Solid wall panels of thickness 75<br />
mm or nearest (Aerocon, Everest or equivalent)<br />
made out of two fibre reinforced cement sheets on<br />
both sides and filled with aereated light weight<br />
concrete. The panel to be erected vertically using GI<br />
channel of size 34 mm X 76 mm X 34 mm X 0.55 mm<br />
thickness at top and 34 mm X 76 mm X 32 mm X<br />
0.55 mm thickness at bottom. Channels fixed on to<br />
floor /nearest structural members using steel screws<br />
plugged in to fibre block plug etc . The Self<br />
Supporting wall Panels shall have tongue and groove<br />
joints and the panel joints should be finally sealed<br />
with silicone Sealant of approved make to make it<br />
vapour tight.The rate should include cost of all<br />
materials and labour, necessary ironmongery, all<br />
50.00 m 3 m 3<br />
160.00 m 2 m 2
25<br />
SL.<br />
NO<br />
DESCRIPTION<br />
hardwares, providing openings for Aluminium<br />
windows/doors etc . Panelling will be measured on<br />
vertical Plane ( length and height) only. All opening<br />
for door and window shall be deducted.<br />
QTY<br />
180.00 m 2 m 2<br />
UNIT<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
11<br />
12<br />
13<br />
14<br />
Plastering with cement mortar 1:4, 12mm thk in one<br />
coat floated hard and trowelled smooth , cost and<br />
conveyance of all materials, labour, other incidentals<br />
etc complete, excluding cost of cement.<br />
Plastering ceiling with cement mortar 1:3, 6mm thk in<br />
one coat floated hard and trowelled smooth including<br />
hacking the concrete surface, cost and conveyance<br />
of all materials, labour, other incidentals etc<br />
complete, excluding cost of cement.<br />
Plastering terrace with cement mortar 1:3, 20mm thk<br />
in one coat floated hard and trowelled smooth<br />
including hacking the concrete surface, cost and<br />
conveyance of all materials, labour, other incidentals<br />
etc complete, excluding cost of cement.<br />
Supplying and fixing in position half glazed<br />
aluminium single shutter openable door with outer<br />
frames 63.50x38.10mm alround horizontal and<br />
vertical members & shutter frames as bottom<br />
100x44.50mm, top, divider, vertical of<br />
50x44.50mm.The top half of the door glazed with<br />
4mm plain glass fixed with EDPM beading and 12<br />
mm thick prelaminated particle board at bottom<br />
half.The door is to be provided with 2nos aluminium<br />
handle,1No of lock,1No. door stopper, 1 No heavy<br />
duty hydraulic door closer, featherstrip, glazing clip,<br />
EPDM beading etc.complete.<br />
1070.00 m 2 m 2<br />
420.00 m 2 m 2<br />
300.00 m 2 m 2<br />
30.00 m 2 m 2
26<br />
SL.<br />
NO<br />
DESCRIPTION<br />
QTY<br />
UNIT<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
15<br />
16<br />
17<br />
18<br />
Supplying and fixing FRP doors including cost of<br />
frame work, accessories such as 100 mm SS hinges<br />
3 nos. 100mm SS tower bolt 1no, mortice lock with<br />
handle 1 No, 125mm aluminium handle 2nos. 60mm<br />
brass screw 4 nos. 20mm brass screw 24 nos. 20mm<br />
wood screw 24 nos. 30mm pvc grip 4 nos. labour and<br />
all other incidentals etc. complete.<br />
Supplying and fixing fibre moulded type glazed<br />
ventilator both frame and shutter of approved quality<br />
and colour with all required fixtures and fitting<br />
including cost and conveyance of all materials, labour<br />
etc. complete.<br />
Supplying and fixing in position fully glazed super<br />
profile aluminium sliding window (1500mm x 1500<br />
mm in two leaves) powder coated aluminium heavy<br />
section with sliding shutters using following sizes or<br />
nearest available size 63.5x31.75mmx 1.5mm or<br />
nearest available size for frames, 38.10x16mm x<br />
1.5mm or nearest size for shutter interlock, vertical<br />
and horizontal and plain glass 4mm thick including<br />
all fixtures like hinges, locking arrangements,<br />
stainless steel screws,handles, beadings etc, cost<br />
and conveyance of all materials, all labour, other<br />
incidentals etc. complete.<br />
Providing and laying plain cement concrete 1:2:4<br />
using 6mm & 12 mm size hard granite broken stone<br />
including cost and conveyance of all materials, labour<br />
for mixing, laying, consolidating, curing, etc.<br />
complete, excluding cost of cement.<br />
15.00 m 2 m 2<br />
3.00 m 2 m 2<br />
35.00 m 2 m 2<br />
30.00 m 3 m 3
27<br />
SL.<br />
NO<br />
DESCRIPTION<br />
QTY<br />
UNIT<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
19<br />
20<br />
21<br />
Supplying and laying approved type and colour<br />
vitrified flooring tiles (Take basic rate of the tile as<br />
700.00/m2) of best quality colour and shade of<br />
Johnson /khajaria /Spartek or equivalent of size<br />
60cm x 60cm or nearest available size including<br />
skirting of 10cm height, set in CM 1:3, 20mm thick<br />
plastering and cement slurry to the back of the tiles<br />
for the proper binding of the tiles in line and level,<br />
pointing with coloured cement to the joints to match<br />
with the tiles, nossing the edges of the tile wherever<br />
required including cost and conveyance of all<br />
materials, labour, other incidentals, etc. complete,<br />
excluding cost of cement. (Skirting using Vitrified tile<br />
also shall be measured under this item)<br />
Supplying and laying approved type non-slippery /<br />
anti skid ceramic flooring tiles of best quality colour<br />
and shade of Johnson /khajaria /Spartek or<br />
equivalent of size 30 cm x 30 cm or nearest available<br />
size , set in CM 1:3, 20mm thick plastering and<br />
cement slurry to the back of the tiles for the proper<br />
binding of the tiles in line and level, pointing with<br />
coloured cement to the joints to match with the tiles,<br />
including cost and conveyance of all materials,<br />
labour, other incidentals, etc. complete, excluding<br />
cost of cement.Consider basic rate of Tile at Rs 500<br />
per Sqm<br />
Dadoing with ceramic glazed tiles of best quality,<br />
colour and shade of Johnson /khajaria /Spartek or<br />
equivalent of size 30 cm x 20 cm or nearest available<br />
size , set in CM 1:3, 20mm thick plastering and<br />
cement slurry to the back of the tiles for the proper<br />
245.00 m 2 m 2<br />
40.00 m 2 m 2
28<br />
SL.<br />
NO<br />
DESCRIPTION<br />
binding of the tiles in line and level, pointing with<br />
coloured cement to the joints to match with the tiles ,<br />
Corner Trim at corners & where ever necessary<br />
including cost and conveyance of all materials,<br />
labour, other incidentals, etc. complete, excluding<br />
cost of cement. Consider basic rate of Tile at Rs 500<br />
per Sqm<br />
QTY<br />
UNIT<br />
170.00 m 2 m 2<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
22<br />
23<br />
24<br />
Painting on walls with two coat of plastic emulsion<br />
paint of approved quality and colour over two coats<br />
of wall putty and two coats of water based<br />
primer.(One coat before putty and one coat after<br />
putty) after rubbing and cleaning the surface with<br />
wire brush, sand paper etc., including cost and<br />
conveyance of all materials, labour, other incidentals<br />
etc. complete.<br />
Painting on ceiling with two coat of plastic emulsion<br />
paint of approved quality and colour over one coat of<br />
cement primer after rubbing and cleaning the surface<br />
with wire brush, sand paper etc., including cost and<br />
conveyance of all materials, labour, other incidentals<br />
etc. complete.<br />
Painting with two coats of exterior quality Acrylic<br />
emulsion paint of approved quality and colour over<br />
one coat of cement primer after rubbing and cleaning<br />
the surface using wire brush, sand paper etc.<br />
wherever required including cost and conveyance of<br />
all materials, labour, scaffolding other incidentals etc.<br />
complete.<br />
985.00 m 2 m 2<br />
430.00 m 2 m 2<br />
210.00 m 2 m 2<br />
25 Supplying and fixing M.S. guard bars using M.S flat
29<br />
SL.<br />
NO<br />
DESCRIPTION<br />
bars 32x 5mm & 12mm dia rod fixed to wall using<br />
PCC 1:2:4 /20mm for windows including cost and<br />
conveyance of all materials, all labour, other<br />
incidentals etc complete (Rate is inclusive of applying<br />
two coats synthetic enamel paint over one coat of<br />
Zinc chromite primer.)<br />
QTY<br />
UNIT<br />
0.80 T T<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
26<br />
27<br />
Supplying and fixing in position vertical blinds<br />
(window curtains) to suit the size of windows using<br />
100mm wide high quality fabric vanes in approved<br />
colour and design connected by small ball chain<br />
slotted in plastic mouldings, enable to rotate the<br />
vanes at 180o in both directions controlled by chord<br />
and ball chain system with extruded aluminium shaft<br />
supported at both ends in plastic end caps with gear,<br />
chain pulley, head rail of extruded aluminium powder<br />
coated of approved colour of external dimension<br />
50mmx25mm to have fitting grooves to rotate a quick<br />
release clops, stopping cluch devise etc. including<br />
cost and conveyance of all materials, labour, other<br />
incidentals etc. complete.<br />
Providing & Installing to true line and level<br />
commercial type Suspended Modular Grid Ceiling<br />
suspended using suitable support system at every<br />
1200mm intervals.<br />
General Requisites;<br />
Grids width: 24 mm finished in approved shade<br />
(white). The main runners & cross Tees to have<br />
"stab" installation system made of corrosion<br />
protected galvanized steel or approved equivalent.<br />
Tile Specification<br />
Tile type: Calcium Silicate ceiling<br />
80.00 m 2 m 2
30<br />
SL.<br />
NO<br />
DESCRIPTION<br />
Tile Size 600 x 600 x 15 mm thk.<br />
Edge detail: Tegular<br />
Ceiling Suspension System<br />
Grid Member Sizes.<br />
Main Runners: 24 x 28 x 0.4mm or nearest<br />
Cross Tees: 24 x 28 x 0.4mm or nearest<br />
Perimeter Section: 19 x 19 x 0.4 mm or nearest<br />
False Ceiling will be measured on horizontal Plane<br />
only. Horizontal Plane measurements are to be<br />
inclusive of vertical drops, edge mouldings, fascias<br />
All extra tiles occupied by lights and diffusers to be<br />
returned to owner.<br />
Rate quoted to include all cut outs required for light<br />
fixtures.<br />
QTY<br />
UNIT<br />
300.0 m 2 m 2<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
28<br />
Supplying, cutting, threading, laying and jointing rigid<br />
PVC pipes (Hycount or equivalent) including all<br />
specials such as tees, bends, elbows, reducers,<br />
plugs etc. through walls/ concrete, making good the<br />
wall/ concrete after fixing using CM 1:3, taking<br />
connection from the existing water supply including<br />
cost and conveyance of all materials, labour, testing<br />
the line before embedding etc. complete excluding<br />
specials of 100 mm dia pipes<br />
(i) 25mm dia 20.00 m m<br />
(iii) 32mm dia 35.00 m m<br />
(iii) 50mm dia 50.00 m m<br />
(iv) 75mm dia 20.00 m m
31<br />
SL.<br />
NO<br />
DESCRIPTION<br />
QTY UNIT<br />
(v) 110mm dia 120.00 m m<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
29<br />
30<br />
Supplying and fixing approved quality Brass half way<br />
valve ,including cost and conveyance of all material<br />
,labour and other incidentals etc complete.<br />
(i) 32mm 9.00 Nos E<br />
(ii) 75 mm 1.00 Nos E<br />
Supplying and fixing following dia. PVC specials<br />
(Hycount or equivalent) of approved quality including<br />
cost and conveyance of all materials, labour, other<br />
incidentals etc.complete.<br />
(i) 100 mm dia Door 'T' 10.00 Nos E<br />
(ii)100 mm dia Plain bent 5.00 Nos E<br />
(iii)100 mm dia Plain tee 8.00 Nos E<br />
(vi)100x75 Reducer 10.00 Nos E<br />
31<br />
32<br />
Supplying & fixing HDPE (sintex or equivalent) water<br />
tank of approx 1000 ltrs. capacity, connecting using<br />
necessary fittings such as connectors,adapters, Ball<br />
valve with polythene float and testing of pipe lines etc<br />
including cost and conveyance of all materials,<br />
labour, other incidentals etc. complete.<br />
Supplying and placing in position ferrocement septic<br />
tank of approximately 15 user capacity with<br />
ferrocement cover slabs. Rate is inclusive of cost of<br />
all materials, labour charges including properly<br />
assembling the various units, testing for leakage,<br />
provision for inlet and outlet pipes (pipe to be<br />
1.00 No. E
32<br />
SL.<br />
NO<br />
DESCRIPTION<br />
measured and paid<br />
separately),tools,conveyance,including earthwork<br />
excavation and disposal of surplus soil,other<br />
incidentals, etc. complete.<br />
QTY<br />
UNIT<br />
1.00 No. E<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
33<br />
34<br />
35<br />
36<br />
37<br />
Brickwork in CM 1:6 using Ist class country burnt<br />
bricks for soakpit including cost and conveyance of<br />
all materials, labour, all leads and lifts, scaffolding,<br />
other incidentals etc complete, excluding cost of<br />
cement.<br />
Open jointed brickwork for soak pits using first class<br />
countryburnt bricks including cost and conveyance of<br />
all materials, labour, all leads and lifts, other<br />
incidentals etc complete.<br />
Filling inside of soak pits with 40mm metal in layers<br />
not exceeding 200mm and consolidating well<br />
including all labour, materials, other incidentals, etc.<br />
complete.<br />
Filling inside of soak pits with 20mm metal in layers<br />
not exceeding 200mm and consolidating well<br />
including all labour, materials, other incidentals, etc.<br />
complete.<br />
Constructing catch pit of 400x400x450mm size(clear<br />
inside dimensions) for connecting sewer lines with<br />
PCC 150mm thick base, 230 thick brick wall forming<br />
channel with PCC 1:2:4, plastering outside with CM<br />
1:3, 12mm thick and plastering inside with CM 1:3,<br />
20mm thick and cement flushing, top cover with precast<br />
RCC cover slab 100mm thick, earth work etc.<br />
including cost and conveyance of all materials,<br />
1.00 m 3 m 3<br />
2.50 m 3 m 3<br />
1.80 m 3 m 3<br />
1.80 m 3 m 3
33<br />
SL.<br />
NO<br />
DESCRIPTION<br />
labour, other incidentals etc. complete, including cost<br />
of cement,fabrication charges and cost of steel<br />
reinforcement.<br />
QTY<br />
UNIT<br />
5.00 Nos. E<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
38<br />
39<br />
40<br />
41<br />
Providing and applying Cold applied elastomeric<br />
bituminous/ heavy duty reinforced acrylic waterproof<br />
coating ( Dr. Fixit or Fosroc or Sika or equivalent)<br />
over the slab after necessery surface preparations<br />
and applying the waterproof coating as per the<br />
specification and recommendations of the<br />
manufacturer and as per the directions of Engineer in<br />
Charge including cost and conveyance of all<br />
materials, labour, other incidentals etc complete<br />
Supplying and fixing superior quality coloured/ White<br />
European type water closet of approved quality,<br />
coupled closet with twin flushing cistern, including<br />
cost and conveyance of all materials labour other<br />
incidental charges etc. as directed by the Engineer in<br />
charge<br />
Supplying and fixing approved quality and shade<br />
earthenware wash-hand basin 550x400mm or<br />
nearest size (Cera,Jaguar,Hindware) with CI<br />
brackets, one central 20 mm CP Bib cock, one<br />
central 15mm PVC connection, 1 no 15 mm CP stop<br />
cock , CP brass waste of standard patterns, 32mm<br />
PVC waste pipe, cutting and making good the walls,<br />
painting the brackets two coats including cost and<br />
conveyance of all materials, labour, other incidentals<br />
etc. complete.<br />
Providing and fixing pantry counter of size approx.<br />
2500 mm X 600mm X 850 mm formed out 19mm<br />
300.00 m 2 m 2<br />
9.00 Nos E<br />
9.00 Nos E
34<br />
SL.<br />
NO<br />
DESCRIPTION<br />
marine grade plywood boxwork, the shutter shall be<br />
panels of 19 mm or nearest available MDF board<br />
mounted on 2 Nos. of spring loaded auto closing<br />
hinges of approved make on each panel,the rear<br />
backing of the counter shall be formed of 8mm thick<br />
marine plywood, the counter to be topped with<br />
20mm thick machine cut and polished approved<br />
granite slab . Rate shall include all necessary cut<br />
outs for fixing sink , painting with two coats of<br />
synthetic enamel paint over putty finish on all faces<br />
except dooor shutter, front face of door shutter<br />
polishing with melamine finish. Each set of shutters<br />
to be provided with 1 Nos. chrome finished<br />
multipurpose lock of approved make, 1 Nos 100mm<br />
C type SS handle. Mode of measurement : Length &<br />
width of the counter<br />
QTY<br />
UNIT<br />
2.00 m 2 m 2<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
42<br />
43<br />
44<br />
Supplying and fixing 600 x 450 x 200mm or nearest<br />
size stainless steel sink approved by the Engineerin-charge<br />
including all fittings like tap valve fixtures<br />
etc, cost and conveyance of all materials, labour<br />
charges, all other sundries etc. complete<br />
Supplying and fixing 20 mm or nearest available size<br />
SDB brass/chromium plated tap long body<br />
(Cera,Jaguar,Hindware) including cost and<br />
conveyance of all materials, labour, other incidentals<br />
etc. complete.<br />
Supplying and fixing bevelled edged or plane edged<br />
coppered Black Mirror 600x450mmx5.5 thk or<br />
nearest available size Indian made glass with plastic<br />
sheet at the rear and fixing the same in position with<br />
necessary plugs embedded in CM and screwed into<br />
1.00 Nos E<br />
9.00 Nos E
35<br />
SL.<br />
NO<br />
DESCRIPTION<br />
with CP fixing screws including cost and conveyance<br />
of all materials, labour, other incidentals etc.<br />
complete.<br />
QTY<br />
UNIT<br />
9.00 Nos E<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
45<br />
46<br />
47<br />
48<br />
49<br />
50<br />
Supplying and fixing 100mm dia C.P/N.P Gratings<br />
including cost and conveyance of all materials,<br />
labour, other incidentals etc. complete.<br />
Supplying and fixing best quality approved brand<br />
PVC vent cowl 100mm dia with mosquito proof net<br />
covering at all height including cost and conveyance<br />
of all materials, labour, other incidentals etc.<br />
complete.<br />
Supplying and fixing 100mm dia. PVC floor trap<br />
including cost and conveyance of all materials, labour<br />
and other incidentals etc. complete.<br />
Supplying and fixing approved type best quality<br />
Stainless Steel towel rod 600mm long 20mm dia.<br />
including cost and conveyance of all materials,<br />
labour, other incidentals etc. complete.<br />
Supplying and fixing best quality Stainless Steel<br />
soap dish of standard size including cost and<br />
conveyance of all materials, labour, other incidentals,<br />
plugs, screws etc. complete.<br />
Supplying and fixing CP Shower of approved quality<br />
with all required fixtures and fitting including cost and<br />
conveyance of all materials, labour etc. complete.<br />
9.00 Nos E<br />
1.00 Nos E<br />
9.00 Nos E<br />
9.00 Nos E<br />
9.00 Nos E<br />
9.00 Nos E<br />
51<br />
Providing and fixing Health faucet<br />
with SDB tap
36<br />
SL.<br />
NO<br />
DESCRIPTION<br />
(Cera, Hindware & Jaquare make) or approved make<br />
including the cost of material and labour as per the<br />
specifications and instructions of the Engineer in<br />
Charge<br />
QTY<br />
UNIT<br />
9.00 Nos. E<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
52<br />
53<br />
54<br />
55<br />
56<br />
Paving decorative roofing MP tiles(including<br />
ridge/edge tile) on top of sun shade, fixed with<br />
cement plastering 1:3, 12mm thk to correct line and<br />
levels including cost and conveyance of all materials<br />
, labor , scaffolding charges etc complete as directed<br />
by engineer in charge.<br />
Supplying and fixing in position fully glazed<br />
aluminium openable window (1190mm x 570 mm in<br />
two leaves) powder coated aluminium heavy section<br />
using following sizes outer frames of 34 J jindal<br />
make and shutter frames of 34 Z jindal make and<br />
plain glass 4mm thick including all fixtures like<br />
hinges, locking arrangements, ,handles, beadings<br />
etc, cost and conveyance of all materials, all labour,<br />
other incidentals etc. complete.<br />
Providing and fixing dark smoke grey colour Sun film<br />
of make to existing window glass panes including<br />
cost and conveyance of all materials, all labour, other<br />
incidentals etc. complete..<br />
Supplying and fixing check design self pasting film of<br />
approved quality on the glass of aluminium<br />
door/windows including cost and conveyance of all<br />
materials, labour etc. complete.<br />
Supplying and fixing frosted self pasting film of<br />
approved quality on the glass of aluminium<br />
100.00 m 2 m 2<br />
15.00 m 2 m 2<br />
50.00 m 2 m 2<br />
15.00 m 2 m 2
37<br />
SL.<br />
NO<br />
DESCRIPTION<br />
door/windows including cost and conveyance of all<br />
materials, labour etc. complete.<br />
QTY<br />
UNIT<br />
26.00 m 2 m 2<br />
RATE<br />
AMOUNT<br />
(Both in Figures & words)<br />
57<br />
58<br />
Supplying and stacking at site cement conforming to<br />
I.S. 8112 (43 grade) OPC/ 12269 ( 53 grade) OPC/<br />
1489 PPC<br />
Supplying and stacking at site torsteel reinforcement<br />
bars conforming to I.S. 1786 of different diametres.<br />
56.00 T T<br />
16.00 T T<br />
SUB TOTAL<br />
Signature, Name & Address<br />
of the Tenderer :<br />
Date :<br />
SENIOR MANAGER I (CIVIL)
38<br />
<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
CONSTRUCTION OF OFFICE ACCOMMODATION FOR SHIP OWNERS AND CREW<br />
AT FIRST FLOOR OF DOCK HOUSE SOUTH SIDE<br />
APPROVED MAKE OF MATERIALS<br />
Sl. No. Item Make<br />
1 Plywood (Marine) Greenply, Century<br />
2 Glass Saint Gobain, Asahi, Modi float<br />
Epoxy paint/Epoxy primer/Synthetic<br />
3<br />
Enamel/Paint/Primer /Melamine Polish/wall Berger, Asian, ICI, Nerolac, Jotun, JK, MRF<br />
putty/wall emulsion, polyurethane etc<br />
4 Door closer/stopper Dunex, Godrej, Everite, Hardwin, Dyna<br />
5 White Cement JK, Birla white<br />
Ultratech, Malabar, Ramco, Sankar,<br />
6 Grey cement<br />
Coromandal, Birla, Gujarat Ambuja, Jindal,<br />
Bharathi<br />
7 Mild & Tor Steel SAIL, TATA, Vizag, JINDAL<br />
8 Adhesive Fevicol or equivalent<br />
9 Aluminum Sections Indal, Jindal<br />
10 GI section Everest, India Gypsum or equivalent<br />
11 Mortise lock/ handle Godrej<br />
12 PVC Pipe Hycount, Supreme or equivalent<br />
13 Welding Rod Advani, Essab, Philips, Modi<br />
14 Self tapping screw Corro shield or equivalent<br />
15 Water proofing compounds Pedilite, Fosroc, Sika<br />
16 Pre laminated particle board Greenply, Century or equivalent<br />
17 Toilet fittings and accessories Cera, hindware, jaguar, RAK<br />
18 Ceiling board/accessories Aerolite, Amstrong, Indiagypsum<br />
19 Vitrified/Ceramic tiles Johnson, Nitco, Asian, RAK, kajaria<br />
20 Vertical /Venetian blinds Lunlex, Filipsun, 3M or equivalent<br />
21 Tinted Sun Film for Glass Garware, 3M or equivalent<br />
22 Water Tank Sintex or equivalent<br />
All equivalent materials are subject to approval of Engineer in Charge.
39<br />
ANNEXURE I<br />
PROFORMA OF POWER- OF-ATTORNEY/LETTER OF AUTHORITY<br />
To<br />
Senior Manager (Civil)<br />
Cochin Shipyard Ltd,<br />
Cochin 6820015.<br />
Kerala, India.<br />
Dear Sir,<br />
We____________________________________________________________<br />
_______________________________________________________________<br />
_______do hereby confirm that<br />
Mr./Ms./Messrs____________________________(Name and Address) is /are<br />
authorized to represent us to bid, negotiate and conclude the agreement on our<br />
behalf with you against Tender No. __________________<br />
We confirm that we shall be bound by all and whatsoever our said agents shall<br />
commit.<br />
Yours faithfully,<br />
Signature:<br />
Name & Designation:<br />
For & on behalf of: Signature, name and seal of the certifying authority
40<br />
ANNEXURE II<br />
DETAILS OF PAST EXPERIENCE OF CONTRACTORS FOR SIMILAR WORKS<br />
SI NO:<br />
Name &<br />
Location of<br />
Project<br />
Owner’s<br />
Complete<br />
address<br />
including Telex<br />
Fax No. with<br />
contact Person<br />
Value of<br />
Contract<br />
Commencement<br />
date<br />
Duration of Contract<br />
Scheduled<br />
completion<br />
date<br />
Actual<br />
completion<br />
date<br />
Details of<br />
work<br />
including<br />
major items<br />
of work<br />
involved<br />
Reference<br />
No. & Date<br />
of letter of<br />
intent &<br />
completion<br />
certificate<br />
enclosed<br />
1 2 3 4 5 6 7 8 9<br />
Note: Bidder to enclose work order and completion certificate issued by the owner, duly certified by a Gazetted officer/Notory or equivalent<br />
certifying authority. For works undertaken at Cochin shipyard, copy of work order and last paid bill can be submitted as documental evidence.<br />
SIGNATURE OF TENDERER
41<br />
ANNEXURE III<br />
FORMAT OF FINANCIAL CAPABILITY CERTIFICATE<br />
Certified that to the best of our knowledge and information………………………, a<br />
customer of our bank, is respectable and can be treated as capable for executing the<br />
work upto a limit of Rs. …………… (Rs…………………………………………..).<br />
It is clarified that this certificate is issued without any guarantee or<br />
responsibility on the bank or any of the officers.<br />
Signature<br />
Manager, ……… Bank<br />
Note: This certificate may be issued on the letter head of the bank and addressed to<br />
the Senior Manager (Civil), Cochin Shipyard Ltd
42<br />
ANNEXURE IV<br />
<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
<strong>COCHIN</strong> - 682 015<br />
FORM OF MEDICAL FITNESS CERTIFICATE FOR CONTRACTORS’<br />
WORKERS<br />
(To be produced at the time of application for Access Control Card)<br />
(Kindly issue this Certificate only if the person is found fit for the job according to the<br />
standards given below)<br />
I / Dr …………………………………………………………………………..(Name<br />
& Designation) Posted<br />
in……………………………………………………………………..(Name of<br />
Hospital & Place) Certify that I<br />
have carefully examined ……………………………………………………….(Name<br />
of Person) S/o / D/o Shri ……………………………………………..whose<br />
photograph attested by me is affixed herewith. As a result of his / her medical<br />
examination and self declaration of the candidate, I certify that he / she has no<br />
disease, mental or bodily infirmity making him / her unfit or likely to make him / her<br />
unfit in the near future for active outdoor duty, as an Industrial Employee, with<br />
reference to the standards prescribed below.<br />
Marks of<br />
Identification:…………………………………………………………………….<br />
Hence the candidate is medically fit as per standards given below for engaging him /<br />
her for any industrial job subject to other conditions of employment.<br />
Signature of Candidate: ………………………………………<br />
Signature of Medical Officer: ………………………….……………<br />
Seal of Designation & Hospital<br />
Reg. No.<br />
Dated :<br />
Photograph of<br />
candidate duly<br />
attested by the<br />
Medical Officer<br />
Medical Fitness Standards<br />
The candidates must subscribe to medical standard laid down below:<br />
1. Height - Not less than 1.5 m for male candidate and not less than 1.4 m for female<br />
candidates.<br />
2. Weight - Not less than 41 kg approx for male candidate and 37 kg approx for<br />
female candidates.<br />
3. Chest Measurement - Not less than 69 cm with satisfactory limits of expansion and<br />
contraction (for male candidates only)<br />
4. Heart & Lungs - No abnormality.
5. Hernia, Hydrocele, Piles, etc. - Presence of any of these will be a temporary<br />
disqualification to be rectified before engaging for<br />
the job.<br />
6. Vision - Normal, where defective, it must be corrected to 6/9 in the better eye and<br />
6/12 in the worse eye. Eyes should be free from contigential and other diseases.<br />
7. Hearing - Normal. Where defective, it must be corrected.<br />
8. Speech - Normal.<br />
9. Should be free of phobias and allergies, particularly altophobia (fear of height),<br />
anablephobia (fear of looking to heights),<br />
bathophobia (fear of depth), claustrophobia (fear of confined spaces), etc.<br />
10. Mentally sound and normal.<br />
11. Should be free of chronic illnesses like epilepsy, bronchial asthma, leukemia,<br />
diabetes, etc.<br />
12. Should be free of orthopedic defects or illnesses.<br />
13. Should be free from intemperate habits like alcoholism, smoking, drug abuse, etc.<br />
43
Page No: 44<br />
ROAD<br />
NOTE:<br />
DOCK HOUSE<br />
1) ALL DIMENSIONS ARE IN<br />
MILLIMETERES,<br />
UNLESS SPECIFIED OTHER WISE<br />
CONTRACTOR'S<br />
WORKER'S<br />
LOCKER ROOM<br />
SM (CE)<br />
DM (CE)<br />
CHECKED DHANNYA K.K<br />
DRAWN<br />
RIJA JOHNY<br />
<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
MATHEWS P.A<br />
DHANNYA K.K<br />
DOCK HOUSE<br />
LOCATION PLAN<br />
DWG NO:CSL-CIV-<br />
DATE :15/04/2013 SCALE :- NTS<br />
042-2013<br />
Sheet no:1
Page No: 45<br />
Toilet<br />
Conference<br />
table (W. glass top)<br />
Toilet<br />
Conference<br />
table (W. glass top)<br />
Conference<br />
table (W. glass top)<br />
Toilet<br />
Conference<br />
table (W. glass top)<br />
Toilet<br />
TV ROOM<br />
Conference<br />
table (W. glass top)<br />
Toilet<br />
Half Brick<br />
Wall<br />
Conference<br />
table (W. glass top)<br />
Toilet<br />
Conference<br />
table (W. glass top)<br />
Toilet<br />
PANTRY<br />
Conference<br />
table (W. glass top)<br />
Toilet<br />
Toilet<br />
Conference<br />
table (W. glass top)<br />
<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
NOTE:<br />
1) ALL DIMENSIONS ARE IN MILLIMETERES,UNLESS SPECIFIED<br />
OTHER WISE<br />
2) FOR BEAM & COLUMN DETAILS REFER SEPARATE DRAWING<br />
SM (CE) MATHEWS P.A<br />
DOCK HOUSE<br />
DM (CE) DHANNYA K.K<br />
FIRST FLOOR PLAN<br />
CHECKED DHANNYA K.K<br />
SOUTH BLOCK<br />
DRAWN RIJA JOHNY<br />
DATE :15/04/2013 SCALE :- NTS<br />
DWG NO:CSL-CIV-<br />
042-2013<br />
Sheet no:2
2 NOS<br />
<br />
<br />
<br />
<br />
Page No: 46<br />
5 NOS<br />
<br />
5 NOS<br />
580<br />
<br />
STIRRUP<br />
120<br />
700<br />
B<br />
<br />
RCC BEAM<br />
230 x 700<br />
A<br />
<br />
<br />
STIRRUP<br />
120<br />
230<br />
SECTION A-A<br />
2510<br />
B<br />
750 1750<br />
1750<br />
450<br />
2650<br />
A<br />
8740<br />
SECTION X-X<br />
2650<br />
580<br />
230<br />
SECTION B-B<br />
<br />
2 NOS<br />
24790<br />
230 4000 230<br />
7770 230 2770 230 5770<br />
3000<br />
X<br />
230<br />
2500<br />
230<br />
12150<br />
8960<br />
DETAIL -A<br />
Y<br />
Y<br />
COLUMN LAY OUT<br />
230<br />
3115 3000 3000 3000 3000 3000 3000 3115 230<br />
230<br />
350<br />
<br />
STIRRUPS<br />
@ 200 c/c<br />
<br />
5 NOS 450<br />
<br />
3 NOS<br />
230<br />
<br />
350<br />
SECTION C-C<br />
2 NOS<br />
<br />
STIRRUP<br />
RCC COLUMN<br />
230 x 450<br />
<br />
1650 1350<br />
RCC BEAM<br />
1650 1350 1650<br />
230 x 350<br />
SECTION Y-Y<br />
SECTION D-D<br />
D<br />
230<br />
350<br />
<br />
3 NOS<br />
RCC COLUMN<br />
230 x 450<br />
<br />
550 550 550 550 550 550<br />
400<br />
2 NOS<br />
2770 2770 3000<br />
D<br />
<br />
STIRRUP<br />
STIRRUP STIRRUP STIRRUP STIRRUP STIRRUP STIRRUP STIRRUP<br />
@ 150 c/c<br />
@ 250 c/c<br />
@ 150 c/c<br />
@ 250 c/c @ 150 c/c<br />
@ 250 c/c @ 150 c/c<br />
230<br />
230<br />
COLUMN DETAILS<br />
DETAIL-A<br />
<br />
5 NOS<br />
NOTES<br />
1. ALL DIMENSIONS ARE IN MM, UNLESS OTHERWISE SPECIFIED.<br />
2. USE MIX 1:11/2:3/20mm CONFORMING TO I.S. 456 FOR<br />
CONCRETING.<br />
SM (CE)<br />
1470 1050<br />
C<br />
C<br />
<strong>COCHIN</strong> <strong>SHIPYARD</strong> <strong>LIMITED</strong><br />
MATHEWS P.A<br />
DOCK HOUSE<br />
DM (CE) DHANNYA K.K<br />
REINFORCEMENT DETAILS OF<br />
CHECKED DHANNYA K.K<br />
ROOF BEAMS AND COLUMNS<br />
DRAWN RIJA JOHNY<br />
3. USE TORSTEEL CONFORMING TO I.S 1786 AS REINFORCEMENT. DATE :15/04/2013 SCALE :- NTS<br />
DWG NO:CSL-CIV-<br />
042-2013<br />
Sheet no: 3