and reliable supply of electricity. Expanding the plant will also<br />

be easier and less costly than putting up a greenfield facility,<br />

giving SPI an edge over other power plant developers.<br />

The required systems reserve margin for Mindanao is at least<br />

21%. The plant has an installed capacity of 232 MW and<br />

generates about 1 billion kilowatt-hours of power each year.<br />

This covers about 15 percent of the electricity needs of the<br />

island, which has some 20 million inhabitants. The electricity<br />

generated is supplied to the state-run National <strong>Power</strong><br />

<strong>Corporation</strong> over a period of 25 years.<br />

The plant’s net-generating output of 210 MW has increased the<br />

island’s systems reserve margin from a critical level of 13% prior<br />

to the plant’s operation to a more comfortable level of 24%<br />

after the start of full commercial operations in November 2006.<br />

In <strong>2007</strong>, the plant accounted for about 20% of the total<br />

electricity supply to the Mindanao grid. It has contributed<br />

stability and supply reliability necessary to sustain the island’s<br />

promising economic growth and development.<br />

SPI built the plant under a build-operate-transfer (BOT)<br />

arrangement. It enjoys a six-year income tax holiday from the<br />

Board of Investments.<br />

Evonik Steag GmbH specializes in the production of electricity<br />

from coal and renewable sources. As a full-service provider,<br />

it focuses on engineering and consulting skills in the design,<br />

building and operation of ultra-modern power plants<br />

worldwide.<br />

In <strong>2007</strong>, the<br />

plant accounted<br />

for about 20%<br />

of Mindanao’s<br />

total electricity<br />

supply and has<br />

contributed<br />

stability and<br />

supply reliability<br />

necessary to<br />

sustain the<br />

island’s promising<br />

economic<br />

growth and<br />

development.<br />