The three utilities aim to provide customers with reliable and<br />

reasonably-priced electricity to help power up industrial growth<br />

in the country.<br />

MEZ distributes power at the Mactan Export Processing<br />

Zone II (MEPZ II) in Mactan Island, Cebu. MEPZ II currently<br />

has 75 locators, many of which are semiconductor firms and<br />

electronics manufacturers.<br />

BEZ is the electricity provider in the Western Cebu Industrial<br />

Park (WCIP) in Balamban, Cebu. Balamban is home to the<br />

shipbuilding facilities of Tsuneishi Heavy Industries (Cebu)<br />

and FBMA Marine, as well as the modular fabrication facility of<br />

Metaphil International. Demand for power in the WCIP, which<br />

currently has 10 locators, is expected to grow substantially in<br />

2008 due to the expansion of Tsuneishi’s shipbuilding facilities<br />

and the completion of the new plants of Air Liquide and SIG.<br />

The West Cebu Industrial Park in Balamban, Cebu where the Tsuneishi shipyard is located.<br />

SEZ has been managing the power distribution system of<br />

the Subic Bay Freeport Zone since 2003 under a Distribution<br />

Management Services Agreement (DMSA) with the Subic Bay<br />

Metropolitan Authority (SBMA). The DMSA covers a period of<br />

25 years, with SEZ paying SBMA 40 million annually for the<br />

lease of its power facilities and other properties.<br />

In just four years, SEZ has dropped the systems loss from 14%<br />

to 4.0% allowing it to lower its power rates. The distribution<br />

charge was reduced from 1.00 per kilowatt-hour (kwhr) to<br />

0.59/kwhr upon turnover; the reduction of the system losses<br />

resulted to further savings to the customer amounting to<br />

approximately 0.48 per kwhr.<br />

<strong>Power</strong> demand in the freeport zone is expected to grow rapidly<br />

in the coming years with the operations of its new container<br />

terminal and the Hanjin Heavy Industries’ multi-billion shipyard,<br />

as well as the opening of the Subic-Clark-Tarlac Expressway. As<br />

of February 2008, SEZ had 2576 customers.<br />

In <strong>2007</strong>, SEZ signed a Memorandum of Agreement to provide<br />

power to Hanjin’s shipyard located at the Redondo Peninsula.<br />

With the energization of the peninsula, more investors are<br />

expected to locate in the area.<br />

To help serve this surge in power demand and in anticipation<br />

of the influx of more investments into Subic in the next few<br />

years, AP together with Taiwan Cogeneration <strong>Corporation</strong>, is<br />

developing a 300-MW coal plant near the Hanjin shipyard. The<br />

plant is scheduled for completion in 2011.<br />

ABOITIZ POWER CORPORATION <strong>ANNUAL</strong> <strong>REPORT</strong> <strong>2007</strong> • 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!