2007 ANNUAL REPORT Power Corporation - Aboitiz Equity Ventures
2007 ANNUAL REPORT Power Corporation - Aboitiz Equity Ventures
2007 ANNUAL REPORT Power Corporation - Aboitiz Equity Ventures
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
POWER<br />
G E N E R A T I O N<br />
Hedcor signed<br />
a 12-year, 400-<br />
million kwH<br />
power supply<br />
agreement with<br />
Davao Light in<br />
<strong>2007</strong>. It assures<br />
Davao customers<br />
of clean and<br />
reliable energy<br />
starting in 2009,<br />
to be supplied by<br />
two greenfield<br />
projects - the<br />
42-MW Sibulan<br />
and 34-MW<br />
Tamugan hydro<br />
plants.<br />
ABOITIZ POWER CORPORATION <strong>ANNUAL</strong> <strong>REPORT</strong> <strong>2007</strong> • 17