Expansion Highlights<br />

• $498 Million dollar budget<br />

• 52,000 tonne per day mill<br />

– 36’ SAG and 2 x 22’Ball Mills<br />

– 14 x OK160 Rougher/Scavenger flotation cells<br />

– 3 x M1000 Isamills for regrinding<br />

– 5 stages of column cleaner flotation<br />

• 15 million lbs per year of Mo Production<br />

– Target 92% Mill operating time<br />

– Lower maintenance costs and downtime<br />

– Higher 79%recovery via better control and finer grinds<br />

– 18 year mine life at $12/lb Mo