5<br />

of any code dealing with particular aspect, sound engineering practice shall prevail.<br />

Decision of the Engineer-in-charge in this respect will be final. In case there is a<br />

difference between Indian standard code and KPWD specification, the former shall<br />

prevail.<br />

29 All materials to be used on the work will have to be got approved by the Engineer-incharge<br />

before use. Unless otherwise decided by the Engineer-in-charge all the materials<br />

are to be procured by the contractor.<br />

30 For the construction purpose, the entire site will be handed over. If this is not possible due<br />

to reasons, which cannot be anticipated now, the site will be handed over in parts. No<br />

extra claim will be entertained for handing over the site in parts.<br />

31 The contractor shall at his risk and cost make all arrangements and shall provide all<br />

facilities as the Engineer-in-charge may require for collection, preparing, forwarding and<br />

testing the required number of samples for test (or for analysis) to places as may be<br />

directed by the Engineer-in-charge. The charges for testing to be borne by the contractor.<br />

32 Contractor shall work in close co-ordination with other agencies working in the same<br />

work site at the same time. The space for storage of materials for each work should also<br />

be decided by mutual agreement among the contractors working in the same area. CSL<br />

will not entertain any claim regarding non-availability of space for storing materials nor<br />

can enter into any discussion to settle the dispute between contractors regarding usage of<br />

space for storing materials etc.<br />

33 The construction of cement godown should be done in the place approved by Engineerin-charge<br />

and it is the responsibility of the contractor to keep the cement in dry condition.<br />

34 Electric power supply from KSEB grid is available in CSL but cannot ensure<br />

uninterrupted power supply. There can be restriction in supply of power by KSEB.<br />

Contractors shall take note of this situation.<br />

35 The Following services will be issued free of cost depending on availability. Contractor<br />

has to make his own arrangements to avail the same at his risk and subject to satisfying<br />

statutory rules and regulations if any.<br />

a. Electricity<br />

b. CSL Hydra type crane / Fork lifts / Trailer subject to availability<br />

c. Oxygen<br />

d. Acetylene<br />

e. Carbon dioxide<br />

f. Compressed Air