Pulmonary Medicine Service Design Guide - Office of Construction ...

Pulmonary Medicine Service Design Guide - Office of Construction ... Pulmonary Medicine Service Design Guide - Office of Construction ...

18.11.2014 Views

PULMONARY MEDICINE SERVICE NOVEMBER 29, 2011 DESIGN STANDARDS SECTION 4 - PAGE 90

PULMONARY MEDICINE SERVICE NOVEMBER 29, 2011 Monitoring Room, Sleep Study (OPPF7) Room Data Sheet ARCHITECTURAL HEATING, VENTILATING AND AIR CONDITIONING Ceiling: AT Dry Bulb Temp Cooling: 75˚F (24˚C) Ceiling Height: 9’-0” Dry Bulb Temp Heating: 70˚F (21˚C) Wall Finish: GWB *1 Minimum % Outside Air: 2 Base: PRB 100% Exhaust Air: Floor Finish: SVT Noise Criteria: Door: 19/20 V-T Steam: Hardware: 3E Relative Humidity/Cooling: 60% Relative Humidity/Heating: 20% Minimum Air Changes/Hr.: 4 Notes: Room Pressure: Neutral (0) 1. See Design and Construction Procedures PG-18-3, “Noise Transmission Control” AC Load Lights: As Required AC Load Equipment: As Required POWER Number of People: General: As Shown Special Equipment: Special: Emergency: PLUMBING AND MEDICAL GASES Notes: Cold Water: Yes Hot Water: Yes Domestic Water (HWH): Yes COMMUNICATIONS Laboratory Air: Patient Monitor: Laboratory Vacuum: Nurse Call: Yes Sanitary/Vent: Yes Security/Duress: Medical Air: CCTV: Medical Vacuum: Telephone: Yes Oxygen: Pub. Address: Nitrogen Oxide: Radio: Nitrogen: Data: Yes Anesthesia Evac: Panic Call: Sprinkler: Yes Battery Operated Clock: Yes Tempered Water: Intercom: Yes Water Control: Staff/Duty Station: LIGHTING General: 1. Two (2) of 2’x4’ (600mm x 1200mm) Fluorescent Light Fixture, Acrylic, Prismatic Lens with F32T8 Lamps, 3500˚K, CRI=70 (minimum) 2. Provide Ballasts Per Fixture for Desired Switching Configuration 3. Lighting Level: 50fc 4. Ceiling Mounted Occupancy Sensors SPECIAL EQUIPMENT None DESIGN STANDARDS SECTION 4 - PAGE 91

PULMONARY MEDICINE SERVICE NOVEMBER 29, 2011<br />

Monitoring Room, Sleep Study (OPPF7)<br />

Room Data Sheet<br />

ARCHITECTURAL<br />

HEATING, VENTILATING AND AIR CONDITIONING<br />

Ceiling: AT Dry Bulb Temp Cooling: 75˚F (24˚C)<br />

Ceiling Height: 9’-0” Dry Bulb Temp Heating: 70˚F (21˚C)<br />

Wall Finish: GWB *1 Minimum % Outside Air: 2<br />

Base: PRB 100% Exhaust Air:<br />

Floor Finish: SVT Noise Criteria:<br />

Door: 19/20 V-T Steam:<br />

Hardware: 3E Relative Humidity/Cooling: 60%<br />

Relative Humidity/Heating: 20%<br />

Minimum Air Changes/Hr.: 4<br />

Notes: Room Pressure: Neutral (0)<br />

1. See <strong>Design</strong> and <strong>Construction</strong> Procedures PG-18-3,<br />

“Noise Transmission Control”<br />

AC Load Lights:<br />

As Required<br />

AC Load Equipment:<br />

As Required<br />

POWER<br />

Number <strong>of</strong> People:<br />

General: As Shown Special Equipment:<br />

Special:<br />

Emergency:<br />

PLUMBING AND MEDICAL GASES<br />

Notes: Cold Water: Yes<br />

Hot Water:<br />

Yes<br />

Domestic Water (HWH):<br />

Yes<br />

COMMUNICATIONS<br />

Laboratory Air:<br />

Patient Monitor: Laboratory Vacuum:<br />

Nurse Call: Yes Sanitary/Vent: Yes<br />

Security/Duress: Medical Air:<br />

CCTV: Medical Vacuum:<br />

Telephone: Yes Oxygen:<br />

Pub. Address:<br />

Nitrogen Oxide:<br />

Radio:<br />

Nitrogen:<br />

Data: Yes Anesthesia Evac:<br />

Panic Call: Sprinkler: Yes<br />

Battery Operated Clock: Yes Tempered Water:<br />

Intercom: Yes Water Control:<br />

Staff/Duty Station:<br />

LIGHTING<br />

General:<br />

1. Two (2) <strong>of</strong> 2’x4’ (600mm x 1200mm) Fluorescent<br />

Light Fixture, Acrylic, Prismatic Lens with F32T8<br />

Lamps, 3500˚K, CRI=70 (minimum)<br />

2. Provide Ballasts Per Fixture for Desired Switching<br />

Configuration<br />

3. Lighting Level: 50fc<br />

4. Ceiling Mounted Occupancy Sensors<br />

SPECIAL EQUIPMENT<br />

None<br />

DESIGN STANDARDS<br />

SECTION 4 - PAGE 91

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!