Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter 6: Design Guidelines, Maintenance Schedules and Best Practices<br />
Typical maintenance vehicles for the trail will be light pick-up trucks and occasionally heavy dump<br />
trucks, semi trucks and tractors. A mechanical sweeper is recommended to keep the trail clear of loose<br />
gravel and other debris. Care should be taken when operating heavier equipment on the trail to warn<br />
trail users and to avoid breaking the edge of the trail surface.<br />
Maintenance Costs<br />
The total estimated annual maintenance for the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> is approximately $36,500, based<br />
on the estimated length of just under 5 miles. This maintenance cost is based on an industry standard of<br />
$7,500 per mile of concrete bike path annually, based on similar trails in the state.<br />
Maintenance costs cover labor, supplies, and amortized equipment costs for weekly trash removal,<br />
monthly sweeping. Repair patrols include cleaning and patching (if necessary) the concrete trail, repairs<br />
to crossings, trash removal, landscaping, underbrush and weed abatement (performed once in the late<br />
spring and again in mid-summer). These costs can be greatly reduced if volunteer crews are used or a<br />
local organization assumes some of the responsibilities.<br />
94 | Alta <strong>Plan</strong>ning + Design