18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 6: Design Guidelines, Maintenance Schedules and Best Practices<br />

Typical maintenance vehicles for the trail will be light pick-up trucks and occasionally heavy dump<br />

trucks, semi trucks and tractors. A mechanical sweeper is recommended to keep the trail clear of loose<br />

gravel and other debris. Care should be taken when operating heavier equipment on the trail to warn<br />

trail users and to avoid breaking the edge of the trail surface.<br />

Maintenance Costs<br />

The total estimated annual maintenance for the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> is approximately $36,500, based<br />

on the estimated length of just under 5 miles. This maintenance cost is based on an industry standard of<br />

$7,500 per mile of concrete bike path annually, based on similar trails in the state.<br />

Maintenance costs cover labor, supplies, and amortized equipment costs for weekly trash removal,<br />

monthly sweeping. Repair patrols include cleaning and patching (if necessary) the concrete trail, repairs<br />

to crossings, trash removal, landscaping, underbrush and weed abatement (performed once in the late<br />

spring and again in mid-summer). These costs can be greatly reduced if volunteer crews are used or a<br />

local organization assumes some of the responsibilities.<br />

94 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!