Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> <strong>Plan</strong><br />
Signage<br />
Signage will be replaced along the trail on an as-needed basis. A monthly check on the status of signage<br />
should be performed with follow-up as necessary.<br />
Flooding<br />
Portions of the trail are subject to flooding due to its location in the 100-year floodplain. Debris<br />
accumulated on the trail surface should be removed after each recession of water. In addition, debris<br />
should be periodically removed from the waterway under bridge structures.<br />
Maintenance recommendations and schedule<br />
Table 11: Maintenance recommendations for the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong><br />
Item<br />
Inspections<br />
Sign replacement / repair<br />
Site furnishings; replace damaged components<br />
Pavement marking replacement<br />
<strong>Plan</strong>ted tree, shrub trimming / fertilization<br />
Pavement joint repair<br />
Pavement sweeping<br />
Shoulder plant trimming (weeds, trees, branches)<br />
Trash disposal<br />
Graffiti removal<br />
Litter pick up<br />
Fencing repair<br />
Pruning to maintain vertical clearance<br />
Remove fallen trees<br />
Weed control<br />
Maintain emergency telephones<br />
Irrigate / water introduced plants<br />
Major damage response (fallen trees, washouts, flooding)<br />
Anticipated Frequency<br />
Quarterly<br />
1-3 years<br />
As needed<br />
3-7 years<br />
5 months - 1 year<br />
8-12 years<br />
Monthly<br />
Bi-annual - Fall / Spring<br />
As needed, once a week<br />
Immediately, As reported<br />
Weekly during high use; twice monthly during low use<br />
As needed<br />
1-4 years<br />
As needed<br />
Late Spring / mid-Summer<br />
1 year<br />
As needed, twice a week<br />
As needed<br />
City of Oxnard | 93