18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> <strong>Plan</strong><br />

3. Develop trail design and development standards that are easy to maintain<br />

and access by maintenance, security, and<br />

emergency vehicles and minimize<br />

impacts to the environment.<br />

Establish design standards applicable for<br />

regional expansion of the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong>.<br />

<br />

<br />

Minimize safety hazards for all user groups.<br />

Utilize low impact development strategies and<br />

innovative storm water management to improve<br />

run-off water quality into the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong>.<br />

Levee road looking east toward Hwy 118<br />

4. Provide an enriching trail user experience through the incorporation of<br />

educational interpretation opportunities along the trail.<br />

Interpret the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> Floodplain and ecological function of the watershed.<br />

<br />

<br />

Highlight the local context including history of the land uses along the trail.<br />

Seek educational opportunities through student engagement and stewardship.<br />

5. <strong>Trail</strong> design, construction and long-term use should respect adjacent<br />

properties and ecosystems<br />

<br />

Utilize appropriate measures so that the adjacent residential communities, commercial areas,<br />

golf course and landfill properties are not negatively affected by trail.<br />

<br />

Minimize impacts of trail users to the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> habitat and wildlife.<br />

6. Respect the functional role of the <strong>Santa</strong><br />

<strong>Clara</strong> <strong>River</strong><br />

Synchronize trail construction with Ventura<br />

County Watershed Protection District (VCWPD)<br />

levee and SBP improvements.<br />

<br />

<br />

Coordinate with VCWPD for ongoing operating<br />

and maintenance requirements for any trail<br />

segments on top of the levee.<br />

Minimize impacts to the capacity of the <strong>Santa</strong><br />

<strong>Clara</strong> <strong>River</strong> floodway.<br />

Groins serve as additional bank<br />

protection along the levee south of the<br />

U.S. 101 Freeway<br />

City of Oxnard | 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!