Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> <strong>Plan</strong><br />
California Department<br />
of Resource Recovery<br />
and Recycling<br />
Scott walker-<br />
916 341-6319<br />
Landfill issues<br />
May review portions of bike path<br />
overlying landfills<br />
VC Watershed<br />
Protection District<br />
800 South<br />
Victoria Avenue,<br />
Ventura, CA<br />
93009-1610.<br />
(805) 662-6882<br />
Encroachment<br />
Permit<br />
Prior to construction, contact the<br />
VCWPD to initiate permit process.<br />
Permitting typically takes about1<br />
month. Trust Deposit of $2,000.00<br />
towards <strong>Plan</strong> Review, Investigation, and<br />
Inspection fee is required. <strong>Final</strong> fees are<br />
for actual costs. After completion of<br />
plan checking, construction, or<br />
inspection, a refund will be processed<br />
or additional fees required.<br />
Watercourse<br />
Permit<br />
Prior to construction, contact the<br />
VCWPD to initiate permit process.<br />
Permitting typically takes about1<br />
month.<br />
Ventura County<br />
<strong>Plan</strong>ning Division<br />
(805) 654-2488<br />
www.ventura.or<br />
g/planning/<br />
permits/permits<br />
.htm<br />
Potential Land Use<br />
Permit required.<br />
Many of the projects within streams<br />
and wetlands do not require a VCPD<br />
Land Use Permit. Contact the VCPD to<br />
determine if your project requires a<br />
permit.<br />
Local<br />
Oxnard:<br />
<strong>Plan</strong>ning &<br />
Environmental<br />
<strong>Services</strong><br />
(805) 385-7858<br />
Permitting can take 6 to 8 months for<br />
small projects with limited<br />
environmental effects<br />
Protected Tree<br />
Permit<br />
Contact the VCPD to initiate the permit<br />
process. Trimming or removal of<br />
protected trees can require not only a<br />
permit but also tree replacement or<br />
other mitigation. Completion of a tree<br />
survey by a qualified arborist or<br />
biologist is also typically required.<br />
Ministerial permits may be issued in 1<br />
day. Discretionary permits take a<br />
minimum of 3 months.<br />
Ventura County Public<br />
Works Agency<br />
Unincorporated<br />
VC County (805)<br />
654-2030<br />
Oxnard: Public<br />
Works<br />
Department<br />
(805) 385-7821<br />
VCPWA Grading<br />
Permit<br />
(Discretionary)<br />
Submit application prior to<br />
construction. The VCPWA would<br />
utilize the grading permit process to<br />
review the proposed grading and<br />
drainage plan. Discretionary permits<br />
require CEQA compliance, which can<br />
take 6 to 8 months or longer. About 1<br />
month for ministerial permits.<br />
City of Oxnard | 59