18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> <strong>Plan</strong><br />

Segment 2 improvements include (N. Ventura Rd to east of 101 Bridge):<br />

Remove and/or replace dilapidated fencing.<br />

<br />

<br />

Provide interpretive signage; possible subjects could include <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> hydrology,<br />

riparian habitat, and history of the Union Pacific Railroad, Ventura Freeway and the Wagon<br />

Wheel areas.<br />

Provide regulatory signage to prohibit illegitimate uses.<br />

Provide highly visible and convenient connections to the pedestrian bridge at the U.S. 101<br />

Freeway and to the Class I bike path that runs along the south side of N. Ventura Road and<br />

continues south adjacent to the El Rio Drain.<br />

Provide wayfinding signage at trail access locations at Stone Creek Drive on the east side of N.<br />

Ventura Road and at the future “Main” Street of the Village development to direct the<br />

community to the SCRT. Improve roadway crossings in these areas, incorporating safety<br />

measures such as instant-on pedestrian and cyclist activated signals and highly visible ladder<br />

style crosswalks.<br />

<br />

<br />

<br />

Remove abandoned structures within the river corridor.<br />

Remove litter and invasive vegetation.<br />

Where width allows, provide additional trees along the north side of North Ventura Road.<br />

Segment 3 improvements include (101 Bridge to Central Ave.):<br />

<br />

Provide highly visible gateway connections to the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> for pedestrians and<br />

cyclists at Windrow Park.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Provide wayfinding signage to the trail from Xanadu Way, Central Avenue and N. Vineyard<br />

Avenue.<br />

Remove or paint over graffiti.<br />

Remove and/or replace dilapidated fencing.<br />

Provide fencing in key areas to curb unwanted behavior and allow passive surveillance.<br />

Provide interpretive signage at Windrow Park Gateway; possible subjects could include <strong>Santa</strong><br />

<strong>Clara</strong> <strong>River</strong> hydrology, riparian habitat and history of the quarry.<br />

Provide regulatory signage to prohibit illegitimate uses.<br />

Remove litter and invasive vegetation.<br />

City of Oxnard | 47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!