Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter 2: Gap Analysis, Geographic Impediments and Alternatives Analysis<br />
Preferred Alignment<br />
The four alternatives were measured against the evaluation criteria; each has its advantages and<br />
disadvantages. Based on this analysis, Segment 2 Alternative 1 and Segment 4 are the recommended<br />
alternatives primarily because these segments provide the safest route for trail users of all ages/abilities<br />
and in regards to the trail along N. Ventura Road, the trail provides a stronger connection to the <strong>Santa</strong><br />
<strong>Clara</strong> <strong>River</strong>.<br />
The preferred trail alignment will be primary located on the south side of the river from N. Victoria<br />
Avenue to the Central Avenue. The trail will be designed to highlight the importance of the <strong>Santa</strong> <strong>Clara</strong><br />
<strong>River</strong> and the larger watershed area, with key interpretive sites representing the river hydrology, riparian<br />
habitat and recycling/sustainability as well as the history of various sites along the river. The <strong>Santa</strong> <strong>Clara</strong><br />
<strong>River</strong> <strong>Trail</strong> will serve transportation and recreation purposes, and helps create a connection for the<br />
community to an important natural resource. The SCRT alignment and the Victoria spur are described in<br />
the following sections as follows:<br />
Segment 1 improvements include (Victoria Ave to N. Ventura Rd):<br />
Provide wayfinding signage at trail access locations on east and west sides of N. Victoria Avenue<br />
near ramps down to trail to direct community to the SCRT.<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Provide interpretive signage at trailhead; possible subjects could include <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong><br />
hydrology, riparian habitat, recycling, re-use of a closed landfill, and methane gas collection (at<br />
N. Ventura Rd too)<br />
Provide regulatory signage to prohibit illegitimate uses and warn trail users of maintenance<br />
vehicle traffic.<br />
Provide protective enclosures for existing utilities within the trail corridor.<br />
Remove or paint over graffiti.<br />
Provide police call boxes.<br />
Provide surveillance cameras under bridge.<br />
Remove and/or replace dilapidated fencing that meets the needs of the golf course and VRSD<br />
operations.<br />
Provide chain link fencing with small openings at ground level and gates at access roads along<br />
the north side of the golf course to curb unwanted behavior, allow passive surveillance, protect<br />
habitat and allow for protected/endangered species migration.<br />
Remove abandoned structures within the river corridor.<br />
Remove litter and invasive vegetation.<br />
Provide a highly visible gateway connection/trailhead to the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> for<br />
pedestrians and cyclists coming from N. Ventura Road.<br />
46 | Alta <strong>Plan</strong>ning + Design