18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 2: Gap Analysis, Geographic Impediments and Alternatives Analysis<br />

Preferred Alignment<br />

The four alternatives were measured against the evaluation criteria; each has its advantages and<br />

disadvantages. Based on this analysis, Segment 2 Alternative 1 and Segment 4 are the recommended<br />

alternatives primarily because these segments provide the safest route for trail users of all ages/abilities<br />

and in regards to the trail along N. Ventura Road, the trail provides a stronger connection to the <strong>Santa</strong><br />

<strong>Clara</strong> <strong>River</strong>.<br />

The preferred trail alignment will be primary located on the south side of the river from N. Victoria<br />

Avenue to the Central Avenue. The trail will be designed to highlight the importance of the <strong>Santa</strong> <strong>Clara</strong><br />

<strong>River</strong> and the larger watershed area, with key interpretive sites representing the river hydrology, riparian<br />

habitat and recycling/sustainability as well as the history of various sites along the river. The <strong>Santa</strong> <strong>Clara</strong><br />

<strong>River</strong> <strong>Trail</strong> will serve transportation and recreation purposes, and helps create a connection for the<br />

community to an important natural resource. The SCRT alignment and the Victoria spur are described in<br />

the following sections as follows:<br />

Segment 1 improvements include (Victoria Ave to N. Ventura Rd):<br />

Provide wayfinding signage at trail access locations on east and west sides of N. Victoria Avenue<br />

near ramps down to trail to direct community to the SCRT.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Provide interpretive signage at trailhead; possible subjects could include <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong><br />

hydrology, riparian habitat, recycling, re-use of a closed landfill, and methane gas collection (at<br />

N. Ventura Rd too)<br />

Provide regulatory signage to prohibit illegitimate uses and warn trail users of maintenance<br />

vehicle traffic.<br />

Provide protective enclosures for existing utilities within the trail corridor.<br />

Remove or paint over graffiti.<br />

Provide police call boxes.<br />

Provide surveillance cameras under bridge.<br />

Remove and/or replace dilapidated fencing that meets the needs of the golf course and VRSD<br />

operations.<br />

Provide chain link fencing with small openings at ground level and gates at access roads along<br />

the north side of the golf course to curb unwanted behavior, allow passive surveillance, protect<br />

habitat and allow for protected/endangered species migration.<br />

Remove abandoned structures within the river corridor.<br />

Remove litter and invasive vegetation.<br />

Provide a highly visible gateway connection/trailhead to the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> for<br />

pedestrians and cyclists coming from N. Ventura Road.<br />

46 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!