Chapter 2: Gap Analysis, Geographic Impediments and Alternatives Analysis Scoring In the evaluation matrix, a score was assigned to segments 2, 4 and 5 to reflect how well each alternative met the criterion. Segment 2 had two alternative options (trail and bike lanes). The higher the score, the better suited the alignment to meet the multiple goals of the trail. The two alignments with no alternatives become the proposed alignments for those segments. The Cost category had additional weight applied, as cost is a major factor in the feasibility of planning, constructing and maintaining trails. The Safety category also received additional weight primarily because of the goal to provide a multi-use path for users of all abilities. The matrix on the following page shows the alignments that were evaluated. 44 | Alta Planning + Design
Santa Clara River Trail Plan City of Oxnard | 45
- Page 2 and 3: Project Partners City of Oxnard Mat
- Page 5 and 6: Santa Clara River Trail Plan Chapte
- Page 7 and 8: Santa Clara River Trail Plan 3. Dev
- Page 9 and 10: Santa Clara River Trail Plan Existi
- Page 11 and 12: Santa Clara River Trail Plan Townse
- Page 13 and 14: Santa Clara River Trail Plan much o
- Page 15 and 16: Santa Clara River Trail Plan N. Vic
- Page 17 and 18: Santa Clara River Trail Plan Segmen
- Page 19 and 20: Santa Clara River Trail Plan A cu
- Page 21 and 22: Santa Clara River Trail Plan LEVEE
- Page 23 and 24: Santa Clara River Trail Plan Exi
- Page 25 and 26: Santa Clara River Trail Plan Segmen
- Page 27 and 28: Santa Clara River Trail Plan Segmen
- Page 29 and 30: Santa Clara River Trail Plan Releva
- Page 31 and 32: Santa Clara River Trail Plan former
- Page 33 and 34: Santa Clara River Trail Plan Vent
- Page 35 and 36: Santa Clara River Trail Plan Constr
- Page 37 and 38: Santa Clara River Trail Plan City o
- Page 39 and 40: Santa Clara River Trail Plan City o
- Page 41 and 42: Santa Clara River Trail Plan Chapte
- Page 43 and 44: Santa Clara River Trail Plan The th
- Page 45 and 46: Santa Clara River Trail Plan Alignm
- Page 47: Santa Clara River Trail Plan and Vi
- Page 51 and 52: Santa Clara River Trail Plan Segmen
- Page 53 and 54: Santa Clara River Trail Plan City o
- Page 55 and 56: Santa Clara River Trail Plan City o
- Page 57: Santa Clara River Trail Plan City o
- Page 60 and 61: Chapter 3: Project Public Involveme
- Page 62 and 63: Chapter 4: Entitlement Process and
- Page 64 and 65: Chapter 4: Entitlement Process and
- Page 66 and 67: Chapter 4: Entitlement Process and
- Page 68 and 69: Chapter 4: Entitlement Process and
- Page 70 and 71: Chapter 5: Benefit Cost Analysis Th
- Page 72 and 73: Chapter 5: Benefit Cost Analysis Ta
- Page 74 and 75: Chapter 5: Benefit Cost Analysis th
- Page 76 and 77: Chapter 6: Design Guidelines, Maint
- Page 78 and 79: Chapter 6: Design Guidelines, Maint
- Page 80 and 81: Chapter 6: Design Guidelines, Maint
- Page 82 and 83: Chapter 6: Design Guidelines, Maint
- Page 84 and 85: Chapter 6: Design Guidelines, Maint
- Page 86 and 87: Chapter 6: Design Guidelines, Maint
- Page 88 and 89: Chapter 6: Design Guidelines, Maint
- Page 90 and 91: Chapter 6: Design Guidelines, Maint
- Page 92 and 93: Chapter 6: Design Guidelines, Maint
- Page 94 and 95: Chapter 6: Design Guidelines, Maint
- Page 96 and 97: Chapter 6: Design Guidelines, Maint
Chapter 2: Gap Analysis, Geographic Impediments and Alternatives Analysis<br />
Scoring<br />
In the evaluation matrix, a score was assigned to segments 2, 4 and 5 to reflect how well each alternative<br />
met the criterion. Segment 2 had two alternative options (trail and bike lanes). The higher the score, the<br />
better suited the alignment to meet the multiple goals of the trail. The two alignments with no<br />
alternatives become the proposed alignments for those segments.<br />
The Cost category had additional weight applied, as cost is a major factor in the feasibility of planning,<br />
constructing and maintaining trails. The Safety category also received additional weight primarily<br />
because of the goal to provide a multi-use path for users of all abilities. The matrix on the following page<br />
shows the alignments that were evaluated.<br />
44 | Alta <strong>Plan</strong>ning + Design