18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> <strong>Trail</strong> <strong>Plan</strong><br />

and Vineyard Ave. This alignment would require some form of overhead protection from flying golf balls<br />

in several key areas.<br />

Alignment Evaluation Criteria<br />

In order to develop a preferred alignment, an evaluation matrix was constructed to inform the strengths<br />

and weaknesses of each potential alignment, as well as highlight the alignments most likely to result in a<br />

successful trail route. The evaluation criteria include:<br />

Safety and Security<br />

Conform to state and federal standards and guidelines.<br />

<br />

<br />

Reflects input from the VRSD, VCWPD, <strong>River</strong> Ridge Golf Course and the City of Oxnard Police<br />

Department, planners and engineers.<br />

Reflects traffic crash data.<br />

Access and Connectivity<br />

Provides access to trail users of all abilities.<br />

<br />

<br />

<br />

<br />

Provides direct and convenient access to other trails or bikeways, schools, parks, commercial or<br />

employment areas and neighborhoods.<br />

Provides access to multiple types of users, i.e., recreational and commuter users.<br />

Separation of trail from vehicular traffic.<br />

Line of sight and “eyes on the route” that exist along a given alignment (this refers to the visual<br />

proximity and access to and from occupied homes, businesses, and other people near the route).<br />

Maintenance<br />

Minimizes future maintenance needs and operational costs.<br />

Education<br />

Provides context and opportunity for placement of an educational component (e.g., interpretive<br />

signage at various points) into trail design.<br />

Environmental Sensitivity<br />

Avoids or minimizes any negative impacts to the natural environment.<br />

Partners<br />

Minimizes negative impacts to property owners and adjacent properties.<br />

Cost/Implementation Opportunities<br />

Needs major investments for trail construction and improvements.<br />

<br />

<br />

Needs major investments in land, right-of-way or easement acquisition.<br />

Costs of construction, right-of-way acquisition and design services for trails can be leveraged<br />

into other planned developments or public projects.<br />

City of Oxnard | 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!