18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 2: Gap Analysis, Geographic Impediments and Alternatives Analysis<br />

Potential Alignments<br />

In most cases, there was only one alignment option that was both adjacent to the <strong>Santa</strong> <strong>Clara</strong> <strong>River</strong> and<br />

atop existing levees and stream bank protection. Field visits, coupled with the alignments suggestions by<br />

the SCRT Steering and Technical Advisory Committees, resulted in the following potential alignments:<br />

Segment 1 Alignment: The proposed alignment follows the existing Ventura Regional Sanitation<br />

District (VRSD)/Ventura County Watershed Protection District (VCWPD) access road atop the stream<br />

bank protection along the northern border of the <strong>River</strong> Ridge Golf Course. This is the westernmost<br />

segment which extends from N. Victoria Avenue to approximately 2,000 feet west of Highway 101 at a<br />

VCWPD access gate off of N. Ventura Road. This alignment includes a trail head/gateway at N. Ventura<br />

Road.<br />

Segment 2 Alignment: This alignment extends from the VCWPD access gate at N. Ventura Road to the<br />

east side of Highway 101. This segment is part of the SCR-3 Levee System Public Safety Project currently<br />

being evaluated by the VCWPD. In order to coordinate interagency efforts and minimize costs, the trail<br />

in this segment will be built after or in conjunction with the SCR-3 project. The alternatives were<br />

evaluated with the understanding that the design of the trail would ultimately be determined by the<br />

design of the flood protection structures. Potential alignments include:<br />

Alternative 1 – Alternative 1 is a 12’ wide trail with two 2’ shoulders adjacent to the north side of<br />

N. Ventura Road. At the railroad undercrossing the trail would narrow to approximately 10’<br />

wide. It is expected that the trail will require some grading and fill on the bank above the<br />

riverbed.<br />

Alternative 2 – Alternative 2 is class II bike lanes added to the north and south sides of N<br />

Ventura Road. This alternative would not provide a separated facility appropriate for all users,<br />

however it is already included in the City’s transportation plan and the bike lanes were installed<br />

during the course of this study.<br />

Segment 3 Alignment: This alignment is on top of the levee and is 12’ wide trail with two 2’ shoulders.<br />

This alignment extends east of Highway 101 for almost 2 miles to Central Avenue and includes a trail<br />

head/gateway at Windrow Park. At the northern terminus of the trail, bike lanes should be provided<br />

down Central Avenue to connect to N. Vineyard Avenue and existing bike lanes that continue down to<br />

Rio Mesa High School.<br />

Segment 4 Alignment: This alignment effectively provides a spur connection from the SCRT to the<br />

Pacific Ocean via the proposed bike route on W. Gonzales Road. It also provides a much needed bicycle<br />

and pedestrian connection to the surrounding neighborhoods along N. Victoria Avenue. This alignmentis<br />

a 12’ wide trail with two 2’ shoulders on the east side of N. Victoria Avenue from the levee to W.<br />

Gonzales Road. The trail is adjacent to the fences, trees and walls of the adjacent properties and will<br />

require the removal of some of the existing Eucalyptus trees.<br />

Segment 5 Alignment: This alignment also provides a spur connection from the SCRT to the Pacific<br />

Ocean via the proposed multi-use path on Patterson Road and bike lane and proposed bike route on W.<br />

Gonzales Road. This alignment is a 12’ wide trail with two 2’ shoulders through the golf course along the<br />

maintenance road that would ultimately connect to N. Patterson Road at the intersection of Patterson<br />

42 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!