18.11.2014 Views

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

Santa Clara River Trail Final Master Plan - Development Services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 1: Existing Conditions<br />

Segment 2: North Ventura Road to Highway 101<br />

Opportunities<br />

N. Ventura Road right-of-way provides ample width (approximately 80’) to provide bike lanes<br />

and/or multi-use paths.<br />

<br />

<br />

<br />

Connections to the South Bank Neighborhood via the existing Class I bike paths on El Rio Drain<br />

and N. Ventura Road.<br />

Proposed on-road bicycle connections from Downtown Oxnard will connect through the South<br />

Bank Neighborhood via bike lanes on H Street or bicycle routes on C Street and Lantana Street<br />

to Kentia Street.<br />

Connection to regional transit and Esplanade Shopping Center via proposed bicycle and<br />

pedestrian facilities within the Village development.<br />

Constraints<br />

Constrained undercrossing at Highway 101. Clearance does not allow trail to pass under bridge<br />

on top of levee.<br />

<br />

<br />

<br />

<br />

<br />

<br />

<strong>Trail</strong> construction will need to follow any necessary levee improvements.<br />

There is minimal clearance (approximately 10’) under the Union Pacific Railroad (UPRR) Bridge<br />

for a trail. If the levee is rebuilt west of the Highway 101 the clearance under the UPRR Bridge<br />

will be too constrained for a trail.<br />

Need a crossing along N. Ventura Road to connect to the Southbank Neighborhood and the<br />

existing pedestrian ramp on Highway 101 Bridge.<br />

Automobile traffic speeds are high (50 mph posted) for an on-road/non-separated bike lane.<br />

There are few mature trees to provide shade and traffic calming.<br />

There are flood plain limitations on the river side crossings under existing bridges.<br />

Segment 3: Highway 101 to Central Avenue<br />

Opportunities<br />

Great open views to surrounding mountains.<br />

<br />

<br />

<br />

<br />

The levee is amply wide (16’-60’) for a trail.<br />

Connections to existing and proposed bicycle facilities in the <strong>River</strong>Park Neighborhood.<br />

Connection to the existing Windrow Park and restroom facilities.<br />

Connection to proposed trails around the reclaimed gravel pits.<br />

30 | Alta <strong>Plan</strong>ning + Design

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!