Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ... Santa Clara River Trail Final Master Plan - Development Services ...
Chapter 1: Existing Conditions Thurgood Marshall Elementary School is located adjacent to the existing multi-use path on N. Patterson Road and Oxnard High School is located on the south side of W. Gonzales Road between N. Victoria Avenue and N. Patterson Road. LEVEE CONDITIONS No levee exists in this segment. CIRCULATION A landfill maintenance road owned by Ventura Regional Sanitation District (VRSD) bisects River Ridge Golf Course from the project site at N. Victoria Avenue to the corner of W. Vineyard Avenue and N. Patterson Road. A drainage channel parallels the landfill maintenance road on the west and south sides. The existing Class I Multi-use Path along the west side of N. Patterson Road connects from a gate at the VRSD access road to the north side of W. Gonzales Road. Multi-use path and bike lane along west side of N. Patterson Road. AESTHETICS The segment along the VRSD maintenance road has an enclosed and natural feel providing a unique experience traveling between the backsides of the golf course greens. The tree lined multi-use path is neatly landscaped and well maintained. Views of the Windsor North River Ridge Neighborhood are buffered by a landscaped center median on N. Patterson Road and mature trees and fencing along the neighborhood. Sloping golf course views along Segment 5. 24 | Alta Planning + Design
Santa Clara River Trail Plan Relevant Projects and Plans It is important for the SCRT Master Plan to build upon existing project and planning efforts affecting the short-term construction and long-term sustainability and vitality of the SCRT. Relevant plans include regional Santa Clara River conservation planning efforts, neighboring city and county bicycle plans, flood protection studies as well as several City of Oxnard specific plans. Santa Clara River Regional Plans Santa Clara River Enhancement and Management Plan The Santa Clara River Enhancement and Management Plan (SCREMP) began in 1991. It is directed by a Steering Committee of federal, state, and local public agencies, owners of property along the river corridor and local conservation organizations. In 1999 the Steering Committee approved a set of management recommendations to provide guidance for the preservation, enhancement, and sustainability of the physical, biological, and economic resources that occur within the Santa Clara River’s main stem. The SCREMP recognizes that the south side of the river features extensive levees, SBP, groins, and access roads necessary for flood control maintenance. These areas in Oxnard are not currently designed for pedestrian use. Collaboration with VCWPD and Los Angeles County Department of Public Works – Watershed Management Division (LACDPW-WMD) will be required. Riverwide Recommendation 3 from SCREMP states "Encourage local jurisdictions to develop Joint Agreements with VCWPD and LACDPW-WMD to allow joint use of flood control maintenance roads with hiking and biking opportunities, particularly on existing flood control levees on the south side of the river in the cities of Oxnard and Ventura." The SCRT Master Plan effort is in direct alignment with the recommendations of SCREMP. Santa Clara River Parkway In 2000, the California Coastal Conservancy (CCC) established the Santa Clara River Parkway Project. The vision of the Santa Clara River Parkway is the acquisition and restoration of a 25 mile-long corridor from the mouth of the Santa Clara River to the Sespe Creek confluence. The project has three goals: to restore hydrologic and geomorphic processes that create and maintain habitat for endangered and threatened species, to provide enhanced flood protection for adjacent private land and public facilities, and to facilitate public access and environmental education, including the creation of a continuous public trail system along the length of the Parkway. Planning and acquisition for the Parkway has begun. The Santa Clara River Parkway Floodplain Restoration Feasibility Study has been completed to assist the CCC with restoration and management strategies for 2,400 acres of acquired property within the lower Santa Clara River corridor. The CCC is in support of the City of Oxnard’s efforts to construct a trail along the Santa Clara River. City of Oxnard | 25
- Page 2 and 3: Project Partners City of Oxnard Mat
- Page 5 and 6: Santa Clara River Trail Plan Chapte
- Page 7 and 8: Santa Clara River Trail Plan 3. Dev
- Page 9 and 10: Santa Clara River Trail Plan Existi
- Page 11 and 12: Santa Clara River Trail Plan Townse
- Page 13 and 14: Santa Clara River Trail Plan much o
- Page 15 and 16: Santa Clara River Trail Plan N. Vic
- Page 17 and 18: Santa Clara River Trail Plan Segmen
- Page 19 and 20: Santa Clara River Trail Plan A cu
- Page 21 and 22: Santa Clara River Trail Plan LEVEE
- Page 23 and 24: Santa Clara River Trail Plan Exi
- Page 25 and 26: Santa Clara River Trail Plan Segmen
- Page 27: Santa Clara River Trail Plan Segmen
- Page 31 and 32: Santa Clara River Trail Plan former
- Page 33 and 34: Santa Clara River Trail Plan Vent
- Page 35 and 36: Santa Clara River Trail Plan Constr
- Page 37 and 38: Santa Clara River Trail Plan City o
- Page 39 and 40: Santa Clara River Trail Plan City o
- Page 41 and 42: Santa Clara River Trail Plan Chapte
- Page 43 and 44: Santa Clara River Trail Plan The th
- Page 45 and 46: Santa Clara River Trail Plan Alignm
- Page 47 and 48: Santa Clara River Trail Plan and Vi
- Page 49 and 50: Santa Clara River Trail Plan City o
- Page 51 and 52: Santa Clara River Trail Plan Segmen
- Page 53 and 54: Santa Clara River Trail Plan City o
- Page 55 and 56: Santa Clara River Trail Plan City o
- Page 57: Santa Clara River Trail Plan City o
- Page 60 and 61: Chapter 3: Project Public Involveme
- Page 62 and 63: Chapter 4: Entitlement Process and
- Page 64 and 65: Chapter 4: Entitlement Process and
- Page 66 and 67: Chapter 4: Entitlement Process and
- Page 68 and 69: Chapter 4: Entitlement Process and
- Page 70 and 71: Chapter 5: Benefit Cost Analysis Th
- Page 72 and 73: Chapter 5: Benefit Cost Analysis Ta
- Page 74 and 75: Chapter 5: Benefit Cost Analysis th
- Page 76 and 77: Chapter 6: Design Guidelines, Maint
Chapter 1: Existing Conditions<br />
Thurgood Marshall Elementary School is located adjacent to the existing multi-use path on N.<br />
Patterson Road and Oxnard High School is located on the south side of W. Gonzales Road<br />
between N. Victoria Avenue and N. Patterson Road.<br />
LEVEE CONDITIONS<br />
No levee exists in this segment.<br />
CIRCULATION<br />
A landfill maintenance road owned by<br />
Ventura Regional Sanitation District (VRSD)<br />
bisects <strong>River</strong> Ridge Golf Course from the<br />
project site at N. Victoria Avenue to the<br />
corner of W. Vineyard Avenue and N.<br />
Patterson Road.<br />
<br />
<br />
A drainage channel parallels the landfill<br />
maintenance road on the west and south<br />
sides.<br />
The existing Class I Multi-use Path along the<br />
west side of N. Patterson Road connects from<br />
a gate at the VRSD access road to the north<br />
side of W. Gonzales Road.<br />
Multi-use path and bike lane along west<br />
side of N. Patterson Road.<br />
AESTHETICS<br />
The segment along the VRSD maintenance<br />
road has an enclosed and natural feel<br />
providing a unique experience traveling<br />
between the backsides of the golf course<br />
greens.<br />
<br />
The tree lined multi-use path is neatly<br />
landscaped and well maintained. Views of the<br />
Windsor North <strong>River</strong> Ridge Neighborhood<br />
are buffered by a landscaped center median on<br />
N. Patterson Road and mature trees and<br />
fencing along the neighborhood.<br />
Sloping golf course views along Segment 5.<br />
24 | Alta <strong>Plan</strong>ning + Design