Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Chapter 1: Existing Conditions<br />
<br />
<br />
<br />
Existing fencing types along the south (developed) side range from simple steel pipe, chain link,<br />
vinyl coated chain link to wrought iron picket fence.<br />
Fencing separates the levee from stored industrial equipment, warehouses, smaller structures,<br />
and ruderal open lots along the eastern area of the segment.<br />
There is graffiti on nearly every vertical concrete surface including; the railroad bridge, retaining<br />
walls, drains structures and concrete blocks.<br />
20 | Alta <strong>Plan</strong>ning + Design