Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
Santa Clara River Trail Final Master Plan - Development Services ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Chapter 1: Existing Conditions<br />
Segment 3: Highway 101 to Central Avenue<br />
Key Map- Segment 3: Highway 101 to Central Avenue<br />
LAND USE<br />
Medium density residential uses, commercial<br />
buildings, a park and vacant undeveloped land<br />
of the <strong>River</strong>Park development are south of the<br />
levee.<br />
<br />
<br />
<strong>River</strong>Park is a mixed use development at the<br />
eastern end of the trail segment. The <strong>River</strong>Park<br />
development has single and multi-family<br />
residential units, open space, schools and<br />
commercial areas.<br />
<strong>River</strong>Park Community<br />
The eastern boundary of the study area is<br />
adjacent to the Hanson Aggregate Property, a<br />
former sand and gravel mine. The site will be developed as part of the <strong>River</strong>Park community<br />
including a trail system throughout the development and around the reclaimed mine pits.<br />
18 | Alta <strong>Plan</strong>ning + Design